Loading...
HomeMy WebLinkAbout303 Gore Creek Permit worksheet Electrical.pdf Permit Fee Worksheet ROW Use(min$50) Construction Season(as defined by Town of Vail Municipal Code) ■ Fee Da Lft of Closure Single Lane $ 0.15 x 28 x 274 = $ 1,150.80 Two Lane $ 0.45 x x = $ - Three Lane $ 1.50 x - x _ = $ - Sidewalk/Bike Path $ 0.15 x 28 x 218 = $ 915.60 Fee Months Sqft of Closure Paved Surface $ 0.25 x x = $ - Non-Paved Surface $ 0.05 x x = $ - Fee Weeks Sqft of Closure Core Areas Heated Streetscape $ 0.25 x x = $ - Non-Construction Season(as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 1.00 x x = $ - Two Lane $ 3.00 x x = $ - Three Lane $ 6.00 x x = $ - Sidewalk/Bike Path $ 0.50 x x = $ - Fee Months Sqft of Closure Paved Surface $ 1.00 x x = $ - Non-Paved Surface $ 0.20 x x = $ - Fee Da Sqft of Closure Core Areas Heated Streetscape $ 0.50 x I x = $ - Sub-total L$ 2,066.40 Street Cut(min$50) Non-Moratorium Streets Surface Fee Sqft of Cut ACC/PCC $ 0.30 x 540 = $ 162.00 Brick Paver $ 1.00 x = $ - Pothole(each) $ 50.00 x = $ - Non-Paved Surface $ 0.05 = $ - Moratorium Streets Surface Fee S ft of Cut ACCIPCC $ 8.00 x = $ Brick Paver $ 15.00 x , $ - Pothole(each) $ 200.00 x = $ - Non-Paved Surface $ 0.25 = $ - Sub-Total $ 162.00 Applicationllnspection Fee $ 100.00 Total Permit Fee $ 2,328.40 (34". 6'0+rV___6ge_k_ 1004e_ - ZV, 3b° i C F.4P WISpecl!ications4RDWY SloodardsPermil Foe Worksheel.sls (P'G Ic i— S-e_M11.:e.,-