HomeMy WebLinkAbout303 Gore Creek Permit worksheet Electrical.pdf Permit Fee Worksheet
ROW Use(min$50)
Construction Season(as defined by Town of Vail Municipal Code)
■ Fee Da Lft of Closure
Single Lane $ 0.15 x 28 x 274 = $ 1,150.80
Two Lane $ 0.45 x x = $ -
Three Lane $ 1.50 x - x _ = $ -
Sidewalk/Bike Path $ 0.15 x 28 x 218 = $ 915.60
Fee Months Sqft of Closure
Paved Surface $ 0.25 x x = $ -
Non-Paved Surface $ 0.05 x x = $ -
Fee Weeks Sqft of Closure
Core Areas Heated Streetscape $ 0.25 x x = $ -
Non-Construction Season(as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 1.00 x x = $ -
Two Lane $ 3.00 x x = $ -
Three Lane $ 6.00 x x = $ -
Sidewalk/Bike Path $ 0.50 x x = $ -
Fee Months Sqft of Closure
Paved Surface $ 1.00 x x = $ -
Non-Paved Surface $ 0.20 x x = $ -
Fee Da Sqft of Closure
Core Areas Heated Streetscape $ 0.50 x I x = $ -
Sub-total L$ 2,066.40
Street Cut(min$50)
Non-Moratorium Streets
Surface Fee Sqft of Cut
ACC/PCC $ 0.30 x 540 = $ 162.00
Brick Paver $ 1.00 x = $ -
Pothole(each) $ 50.00 x = $ -
Non-Paved Surface $ 0.05 = $ -
Moratorium Streets
Surface Fee S ft of Cut
ACCIPCC $ 8.00 x = $
Brick Paver $ 15.00 x , $ -
Pothole(each) $ 200.00 x = $ -
Non-Paved Surface $ 0.25 = $ -
Sub-Total $ 162.00
Applicationllnspection Fee $ 100.00
Total Permit Fee $ 2,328.40
(34". 6'0+rV___6ge_k_ 1004e_ - ZV, 3b° i C
F.4P WISpecl!ications4RDWY SloodardsPermil Foe Worksheel.sls
(P'G Ic i— S-e_M11.:e.,-