Loading...
HomeMy WebLinkAboutRowhouse Transformer Action Plan.pdfPhase 1 Transformer Scope. All work on this area will be contained on the Villa Valhalla property per the staging plan. Phase 2 Transformer Scope. Keep 1 lane of traffic open on either the north or the south side of the road. Street plates will cover the excavation while conduit is installed from the south side of the south concrete street pan to the north side of the north concrete street plan. Phase 3 Transformer Scope. Continue excavation and install of the conduit from the east under the concrete street pan to the western most unit #7. Excavation will be done in 10' sections, conduit installed/inspected, flow-fill backfill, and pan/street repair, then on to the next 10' section. Material staging, equipment parking, dumpster, and toilet location - All subcontractor and contractor parking will be located at the Village Parking Garage. Deliveries and short term parking will be on the site of RH #9 & #10 or in the Villa Valhalla staging area. Villa Valhalla staging area for deliveries and equipment 6' Chain Link Fence with Green Cloth Covering Tree protection for 2 existing trees that are to remain Dump Truck and Equipment staging area for transformer excavation and demo Single lane street closure (in purple) for 3 days to bring conduit across the asphalt area, steel street pans overing excavation until backfill.. Traffic Control Personnel Jersey Barrier Separating Excavation and Work from Street Traffic Single lane street closure for 8 days with jersey barriers separating traffic from excavation. All excavation to be from the concrete street pan in towards the property, not on the asphalt. 177'-7 1/2 " 40'-2 1/ 2 " 537.17 sf Potential Asphalt Street Cut Area (in Green) Street Closure Lengths 21'-7 3/4"12'-6 1/2"14'-10 1/4"Hanson Ranch Chute Vail V all e y Drive 34'-10 3/4 "