HomeMy WebLinkAboutRowhouse Transformer Action Plan.pdfPhase 1 Transformer Scope. All work on
this area will be contained on the Villa
Valhalla property per the staging plan.
Phase 2 Transformer Scope. Keep 1 lane of
traffic open on either the north or the south
side of the road. Street plates will cover the
excavation while conduit is installed from the
south side of the south concrete street pan to
the north side of the north concrete street
plan.
Phase 3 Transformer
Scope. Continue
excavation and install
of the conduit from
the east under the
concrete street pan to
the western most unit
#7. Excavation will
be done in 10'
sections, conduit
installed/inspected,
flow-fill backfill, and
pan/street repair, then
on to the next 10'
section.
Material staging, equipment
parking, dumpster, and toilet
location
- All subcontractor and contractor parking will be
located at the Village Parking Garage. Deliveries and
short term parking will be on the site of RH #9 & #10 or
in the Villa Valhalla staging area.
Villa Valhalla
staging area for
deliveries and
equipment
6' Chain Link Fence with
Green Cloth Covering
Tree protection for
2 existing trees that
are to remain
Dump Truck and Equipment
staging area for transformer
excavation and demo
Single lane street closure (in purple)
for 3 days to bring conduit across
the asphalt area, steel street pans
overing excavation until backfill..
Traffic Control
Personnel
Jersey Barrier Separating
Excavation and Work from
Street Traffic
Single lane street closure
for 8 days with jersey
barriers separating traffic
from excavation. All
excavation to be from the
concrete street pan in
towards the property, not
on the asphalt.
177'-7 1/2
"
40'-2 1/
2
"
537.17 sf Potential
Asphalt
Street Cut
Area (in
Green)
Street
Closure
Lengths 21'-7 3/4"12'-6 1/2"14'-10 1/4"Hanson Ranch Chute
Vail V
all
e
y
Drive
34'-10 3/4
"