HomeMy WebLinkAboutTesla permit worksheet.pdf Permit Fee Worksheet
ROW Use(min$50)
Construction Season(as defined by Town of Vail Municipal Code)
Fee Da s Lft of Closure
Single Lane $ 0.15 x — x = $
Two Lane $ 0.45 x 1 x 300 = $ 135.00
Three Lane $ 1.50 x — x = $ -
Sidewalk/Bike Path $ 0.15 x 1 x 300 = $ 45.00
Fee Months Sqft of Closure
Paved Surface $ 0.25 x x = $ -
Non-Paved Surface $ 0.05 x x = $ -
Fee Weeks Sqft of Closure
Core Areas Heated Streetscape $ 0.25 x x = $ -
Non-Construction Season(as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 1.00 x x = $ -
Two Lane $ 3.00 x x = $ -
Three Lane $ 6.00 x x = $
Sidewalk/Bike Path $ 0.50 x x = , $ -
Fee Months Sqft of Closure
Paved Surface $ 1.00 x x = $ -
Non-Paved Surface $ 0.20 x x = $ -
Fee Das Sqft of Closure _
Core Areas Heated Streetscape $ 0.50 x x = $ -
Sub-total $ 180.00
Street Cut(min$50)
Non-Moratorium Streets
Surface Fee S ft of Cut
ACCIPCC $ 0,30 x = $ -
Brick Paver $ 1,00 x = $ -
Pothole(each) $ 50.00 x = $ -
Non-Paved Surface $ 0.05 = $ -
Moratorium Streets
Surface Fee S ft of Cut
ACCIPCC $ 8.00 x = $ -
Brick Paver $ 15.00 x = $ -
Pothole(each) $ 200.00 x = $ -
Non-Paved Surface $ 0.25 = $ -
Sub-Total $ - J
Application/inspection Fee $ 100.00
Total Permit Fee $ 290.00
- (4 dtir — SO 6-0 S
FAPIMSpoc+rxaflorts1RDwYsrandards4Permit Fee wcrksheef.xls �
Ivh .6,cJ
f/k — 20-7—