Loading...
HomeMy WebLinkAboutTesla permit worksheet.pdf Permit Fee Worksheet ROW Use(min$50) Construction Season(as defined by Town of Vail Municipal Code) Fee Da s Lft of Closure Single Lane $ 0.15 x — x = $ Two Lane $ 0.45 x 1 x 300 = $ 135.00 Three Lane $ 1.50 x — x = $ - Sidewalk/Bike Path $ 0.15 x 1 x 300 = $ 45.00 Fee Months Sqft of Closure Paved Surface $ 0.25 x x = $ - Non-Paved Surface $ 0.05 x x = $ - Fee Weeks Sqft of Closure Core Areas Heated Streetscape $ 0.25 x x = $ - Non-Construction Season(as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 1.00 x x = $ - Two Lane $ 3.00 x x = $ - Three Lane $ 6.00 x x = $ Sidewalk/Bike Path $ 0.50 x x = , $ - Fee Months Sqft of Closure Paved Surface $ 1.00 x x = $ - Non-Paved Surface $ 0.20 x x = $ - Fee Das Sqft of Closure _ Core Areas Heated Streetscape $ 0.50 x x = $ - Sub-total $ 180.00 Street Cut(min$50) Non-Moratorium Streets Surface Fee S ft of Cut ACCIPCC $ 0,30 x = $ - Brick Paver $ 1,00 x = $ - Pothole(each) $ 50.00 x = $ - Non-Paved Surface $ 0.05 = $ - Moratorium Streets Surface Fee S ft of Cut ACCIPCC $ 8.00 x = $ - Brick Paver $ 15.00 x = $ - Pothole(each) $ 200.00 x = $ - Non-Paved Surface $ 0.25 = $ - Sub-Total $ - J Application/inspection Fee $ 100.00 Total Permit Fee $ 290.00 - (4 dtir — SO 6-0 S FAPIMSpoc+rxaflorts1RDwYsrandards4Permit Fee wcrksheef.xls � Ivh .6,cJ f/k — 20-7—