Loading...
HomeMy WebLinkAboutDRB17-0387_ComcastSignOff_1503932700.pdf UTILITY APPROVAL&VERIFICATION This form serves to verify that the proposed improvements will not Impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, Including grading plan,floor plan,and elevations.shall be submitted to the following utilities for approval and verification.PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES, If you are unable to obtain comments within that timeframe please contact The Town of Vail, Subject Property Address: 4273 Columbine Drive Lot16 Block 9 Subdivision: Bighorn Primary Contact J er. epres Live: Anne Gunton,Architect phone: 970.390.1429 Plans Dated: 8114'2017 Primary Contac Owner Representative Signature Atithin.ed Slonaturq comments D t� CENTURY LINK w 970.328,8266(tel) 970.328.8262(fax) Contacts:Kelly McCleman keil y.m c cI a monOcentu ryl i n k.co rn XCEL HIGH PRESSURE GAS l I 970244.2798(tel) 970.390.4777(cell) 970.244.2661 (fax) Contact:Ron Smith ron,s mith(dtxcele n eray.com HOLY CROSS ENERGY 970.947.5425(tel) 970.945.4081 (fax) Contact'Jeff Vrccm jvroom@holycross.com XCEL Energy 970.282.4032(tel) 970.282.4038(fax) Contacts:Britt Macs brttta ny.mace @:cel energy.corn EAGLE RIVER WATER&SANITATION DISTRICT 970.477.5449(tel) 970.845.7218(fax) Contact Tug Einc dbirkaerwsd.org CQMCAST CABLE 970.930.4713(rel) 303.603.1004(fax) fen)Contact Michael Johnson La 1 aO fen)JQ U`` CoC MichaelJohnsargcabie.ccmcast.corn CBOT Only in COOT Right-ot.way) 970.683.8284(tel) Contact:Dan Raussin DanietroussIniglot.state.co.us NOTES: 1. Utility locations must be obtained before digging. 2. A Revocatle Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3. it is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re-approval &re-verification if the submitted plans are altered in any way after the authorized signature date.