HomeMy WebLinkAboutDRB17-0387_ComcastSignOff_1503932700.pdf UTILITY APPROVAL&VERIFICATION
This form serves to verify that the proposed improvements will not Impact any existing or proposed utility services, and
also to verify service availability and location for new construction and should be used in conjunction with preparing your
utility plan and scheduling installations. A site plan, Including grading plan,floor plan,and elevations.shall be submitted
to the following utilities for approval and verification.PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM-
MENTS FROM THE UTILITY COMPANIES, If you are unable to obtain comments within that timeframe please contact
The Town of Vail,
Subject Property Address: 4273 Columbine Drive Lot16 Block 9 Subdivision: Bighorn
Primary Contact J er. epres Live: Anne Gunton,Architect phone: 970.390.1429
Plans Dated: 8114'2017
Primary Contac Owner Representative Signature
Atithin.ed Slonaturq comments D t�
CENTURY LINK w
970.328,8266(tel)
970.328.8262(fax)
Contacts:Kelly McCleman
keil y.m c cI a monOcentu ryl i n k.co rn
XCEL HIGH PRESSURE GAS l I
970244.2798(tel)
970.390.4777(cell)
970.244.2661 (fax)
Contact:Ron Smith
ron,s mith(dtxcele n eray.com
HOLY CROSS ENERGY
970.947.5425(tel)
970.945.4081 (fax)
Contact'Jeff Vrccm
jvroom@holycross.com
XCEL Energy
970.282.4032(tel)
970.282.4038(fax)
Contacts:Britt Macs
brttta ny.mace @:cel energy.corn
EAGLE RIVER WATER&SANITATION
DISTRICT
970.477.5449(tel)
970.845.7218(fax)
Contact Tug Einc
dbirkaerwsd.org
CQMCAST CABLE
970.930.4713(rel)
303.603.1004(fax) fen)Contact Michael Johnson La 1 aO fen)JQ U`` CoC
MichaelJohnsargcabie.ccmcast.corn
CBOT Only in COOT Right-ot.way)
970.683.8284(tel)
Contact:Dan Raussin
DanietroussIniglot.state.co.us
NOTES:
1. Utility locations must be obtained before digging.
2. A Revocatle Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the
Public Works Department for verification 970.479.2198.
3. it is the responsibility of the utility company and the applicant to resolve problems identified above.
4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for
re-approval &re-verification if the submitted plans are altered in any way after the authorized signature date.