Loading...
HomeMy WebLinkAboutDRB17-0406_M29_1508352060.pdf Z urc rn Town of Va i I Stamp i DRB APPR VED 10/18/2 17 12:00:0 AM 0 I-70 o (NI CV 2 \ w DEMO EXISTING ROOF CURB 4 CU12: LU CNIii REPAIR ROOF. Jay uzi i DEMO EXISTIN 40/15 0A DUCT BACK I- o CO Ar‘ 'III TO AHU-2 INT KE. •. ` 0 Cn 0 1� U- ACCESS A 0 - - - - �i , I EAST 0 2 0 Z DEMO EXISTING INTAKE HOOD. HATCH // \ III I IIS II I� O' \4 0 (E) EF-1 III I I I \I I I~ V O „ t 2 1 a _ (E) AHU-1 IN MECHANICAL ATTIC BELOW. W j� 0 O O1:1: \J I- 2 DEMO EXISTING INTAKE HOOD. Z a . ii �• (E) EF-3 LE) EF-4 0 _ ATRIUM v' W 0 X WEST !�C�E S DEMO EXISTING 54/IS OA BACK TO Cu Z II 20 iII II iI HAT H 40AHU-I INTAKE. 11:14 W O in I- —III\III III v III (E) EF-2 DEMO EXISTING ROOF CURB 4 n' (vvvs.,, i100 Q- REPAIR ROOF. If,. ® v-14. 01 to 16 LU (E) AHU-2 IN Z u1 MECHANICAL ATTIC 2 Cu BELOW. PE Stamp 0 N 5 z v) CO 0 n 1- 0 cu 00 VAIL MOUNTAIN o- _I 0 m Ui z0 U Contractor shallpaint � D louvers a flat dark color to match the color of the exterior of the building . U . � . Lli ,_ m„ _. ROOF LEVEL MECHANICAL PLAN (DEMO) m o 1/8” = 1'-0" W Q ›- .4 il Ill E fk Cli) z Z4 A Qo Z 4174I N U- I 4 U o Vz ,u4 QO 1.4 zl (N) CU-2 CONDENSING UNIT ON NEW P"'" 70 (N) CCA-1 COOLING COIL ASSEMBLY WITH FILTER SECTION, IN - O MECHANICAL ATTIC BELOW. INSTALL FOR PROPER FILTER u1 Ill tp ROOF CURB. LOCATE IN PLACE OF PR E 2 EXISTING DEMOLISHED INTAKE ACCESS. RAISE THE ROOF AT UNIT AS REQUIRED TO FIT. U MI- HOOD. Cu 1:4pG4 i, N 0 (N) 54/15 OA v 4 Q (1)(IN ATTIC BELOW) u1 ~ EXISTING • - 0 =XHAUST FANS EF-3 Cu 0 LSU 4 EF-• • BE CONNECTED TO - — -•' TROL SYSTEM. (N) CU-1 CONDENSING UNIT ON NEW in •4/5• -I LOUVER REFER TO SEQUENCE OF OPERATION ROOF CURB. LOCATE IN PLACE OF OA INTA4 N W111 >- SHEET M1.0. EXISTING DEMOLISHED INTAKE HOOD. IP1,850 C • O ~ N 00- Z � A _ _ _ T_ 0- ACCESS HATCH / \ -. 11-Tv Ir T 2 cy W / \ r(E) EF-I - :1 1 wI I %L _ TI _L' ' �� 1 II (III I(N) CCA-2 COLING COIL ASSEMBLY WITH o ► I -�--J I L jr'4-JII —-L O O FILTER SECTI"N, IN MECHANICAL ATTIC L. 4- 0 BELOW. NISTA L FOR PROPER FILTER L.) Q 0 ACCESS. Cuc (E) AHU-1 IN MECHANICAL ATTIC BELOW. W I- O _ _ . O 0_ 2 10 • 1( E) EF-3 (E) EF-4 Cu4. .�" , Issued For Z ATRIUM v No. Date Comment 0 WEST + •CL S ,r - -- r HAT H 1 8/4/1 PROGRESS SET i : I i I 'II - I 1= I o III I �►�► III i I 0 (E) EF-2 2 5/10/17 PROGRESS SET I, 4 aJ ---_— _111.--- —— __ 3 S/11/11 BID SET Z L - - - - 4 S/15/11 ADDENDUM *1 1- O 5 10/16/11 DRB REVISION E `� Z 0 116\ (E) AHU-2 IN 4- in W MECHANICAL ATTIC 42/42 • V R CuBELOW. ROO V cp } OA INTAKE CuGENERAL NOTES: 1"IECI-IANICAL PLAN z 0/ u 1 UJ Z 4,250 CFM 1. MOUNTAIN HAUS (OWNER) IS RESPONSIBLE FOR OBTAINING ALL cp • La REQUIRED APPROVALS FOR THIS PROJECT, PRIOR TO 0 I(Y Z (N) 40/18 OA aJ ONTRACTORS ORDERING ANY EQUIPMENT 0- MAT RIALS. V > ff ��/ N LL N LU (IN ATTIC BEL•W) VAIL MHUNTAIN 2. INSTALL CONDENSATE DRAIN LINES FOR NEW COOLING COIL EQUIPMENT IG -1TS 4 I-EIGI-4TS %, • ? ASSEMBLIES. FIELD VERIFY EXACT ROUTING. UTILIZE 0 (k Z CONDENSATE PUMP IF REQUIRED. INSTALL PER CODE. 4 p- ui MARK UJEICs 4T (INCLUDINCs CURBS' UNIT HEIGHT CURB HEICzWT TOTAL HEICsWT NORTH j (�/(POUNDS )(INCHES) (INCHES) (INCHES) 3. LOCATE NEW ROOF TOP MECHANICAL EQUIPMENT MINIMUM 10 0 U 0 FEET FROM EDGE OF ROOF, PER CODE. Project No. Sca Ie: Z .Q GGA-1 1,300 13" 4" CURB fl" 11011.00 1/8" = 1'-0" o d LF- 4. MAKE NEW DUCT CONNECTION AT EXISTING AHU INTAKE WITH NEW ciz �-n FLEXIBLE CANVAS DUCT CONNECTORS. CCA-2 1,100 35" 4" CURB 42" Drawn By: Checked By: z pi 8 tu 15J1-1 JDRw I— CU-1 1,000 45" 6CURB ROOF 51" w ROOF LEVEL MECHANICAL PLAN (PROPOSED) CU-2 600 51" ROOF 5�„ 4 LU 1/8" = 1'-0" CURB M2.9 0 o 0 Quo