Loading...
HomeMy WebLinkAboutDRB17-0444_drawing 3_1507818780.pdf " CIF k4 Certified Drawing for RTU-1,241140 11:1 � rei Project: —Untitled29 Prepared By: nar DRB APPROVED Service Clearance 10/11/2017 12:00:00 AM 005337 LOCATION DIMENSION CONDITION 48-in(1219 mm) •Unit disconnect is mounted on panel A 18-in(457 mm) •No disconnect,convenience outlet option •Recommended service clearance 12-in(305 mm) •Minimum clearance 42-in(1067 mm) •Surface behind servicer is grounded(e.g.,metal,masonry wall) 6 36-in(914 mm) -Surface behind servicer is electrically non-conductive(e.g.,wood,fiberglass} Special -Check for sources of flue products within 10-ft.of unit fresh air intake hood C 36-in(914 mm) •Side condensate drain is used 18-in(457 mm) •Minimum clearance 46-in(1219mm) •No flue discharge accessory installed,surface is combustible material 42-in(1067 mm) •Surface behind servicer is grounded(e.g.,metal,masonry wall,another unit) D 36-in(914 mm) •Surface behind servicer is electrically non-conductive(e.g.,wood,fiberglass) Special •Check for adjacent units or building fresh air intakes within 10-ft.of this unit's flue outlet NOTE:Unit not designed to have overhead obstruction.Contact Application Engineering for guidance on any application planning overhead obstruction or vertical clearances. c ossa s-z Packaged Rooftop Builder 1.49a Page 4 of 8