GENERAL ASSEMBLY NOTES: APPROVED
ROOF CEILING ASSEMBLY 10/9/201712:00:0 nA
•STANDING SEAM METAL ROOF OVER
• ROOF WATERPROOF MEMBRANE OVER
•3 2" RIGID INSULATION AND SHEATHING_R-18 MIN.
•STRUCTURAL PLYWOOD SHEATHING OVER (RE:STRUCTURAL) OVER
• 2"SPRAY FOAM INSULATION AT BOTTOM SIDE OF SHEATHING_R-12.4 MIN.
_ _
- _ __ _ •STRUCTURAL ROOF JOISTS (RE: STRUCTURAL)
-- • 12" BLOWN-IN BLANKET INSULATION AT JOIST CAVITIES_R-48 MIN. (R-78.4 MIN.TOTAL)
• 2 MIL SMART MEMBRANE VAPOR RETARDER
• lx6 T&G DECKING OR DRYWALL PER REFLECTED CEILING PLANS
RI
- - _ _ \\ FLAT ROOF CEILING ASSEMBLY - 0
• STONE BALLAST ON ^ h
5 • PROTECTION LAYER OVER N t
\ \
• FULLY-ADHERED EPDM ROOFING MEMBRANE ON o 7g
� \ • ADHERED COVER BOARD OVER 0. U
- MECHANICALLY ATTACHED RIGID BOARD INSULATION 3"MINIMUM AT DRAINS OVER HABITABLE o
\ \ SPACE_R-18.0 MIN. 0
\ • TAPERED RIGID INSULATION E
\ \ • STRUCTURAL PLYWOOD SHEATHING OVER (RE: STRUCTURAL) H
\ 30'-0"HEIGHT LINE • 2"SPRAY FOAM INSULATION AT BOTTOM SIDE OF SHEATHING_R-12.4 MIN. Cd]
• STRUCTURAL ROOF JOISTS UNLESS NOTED OTHERWISE (RE: STRUCTURAL) 0
\ \ \- \
\
33'-0"HEIGHT LINE • 12" BLOWN IN BLANKET INSULATION IN CAVITY OVER HABITABLE SPACER 48 MIN. (R 78.4 TOTAL) v
• 2 MIL SMART MEMBRANE VAPOR RETARDER E
• 1x6 T&G DECKING OR DRYWALL PER REFLECTED CEILING PLANS 0 0)
\- \- I- -
STEEL ROOF SUPPORTS AND ALL STEEL STRUCTURE AT EXTERIOR TO INTERIOR TRANSITION U
• ENCAPSULATE AT INTERIOR SIDE WITH 1 1/2"MIN. SPRAY FOAM INSULATION TO MIN. 4'-0" ill< w0
INSIDE FROM EXTERIOR FACE OF EXTERI R WALLS; MAKE CONTINUOUS WITH SPRAY FOAM - o
N.
I I \ \ INSULATION IN ROOF AND WALLSX
12 a
I 2 \� \ FLOOR CEILING ASSEMBLY M O 6 N Q
•SEE PLANS FOR FINISH I Ix
w
• 1 2' GYP-CRETE WITH RADIANT HEAT LOOPS OVER V/ 4 ; v,
\ • PLYWOOD DECKING (RE:STRUCTURAL) VER
•STRUCTURAL MEMBERS (RE:STRUCTURA
• BLOWN-IN BLANKET INSULATION AT JOI CAVITIES_R-38 MIN.
\ \\
\ •2' HAT CHANNEL OR$'SUSPENDED MET L GRID PER SECTIONS
_
•SEE RCP'S FOR CEILING FINISH IIII
I \ \ \\ - SLAB ON GRADE ASSEMBLY(I
NTERI R
FLOOR SIABS ONLY)
_ _ -- `--. •SEE PLANS FOR FINISH
•STRUCTURAL CONCRETE SLAB WITH
• HYDRONIC HEAT TUBING OVER
• 15 MIL POLYETHYLENE VAPOR DIFFUSIO RETARDER OVER
• RIGID INSULATION R-10 MIN. OVER (1)
• 6"GRAVEL BALLAST
-__
-
I
Z
\ FRAMED EXTERIOR WALLS
5_ \ \ • SEE ELEVATIONS FOR FINISH
• HOME SLICKER RAINSCREEN OVER
BARRIER/WEATHER-RESISTIVE BARRIER[VER IIIII
- �� � �� ` • 2'PLYWOOf�SHEATHING ON
• 2X6 WOOD STUBS-
CI
�� OVERSIZED , , , • 3"SPRAY FOAM INSULATION7Ai�NSIDE FIACE OF SHEATHING_R-18.6 MIN.
p"wriim....*". 4.__________________,AN
2 CARGARAGE \ - � •• 2.5"BLOWN-IN BLANKET INSULATION-1'_ MIN. (R-28.6 TOTAL)
MO Imo : (1)
iNN..% �� -•� FOUNDATION W7fiL�S
�
• DRAIN AND DRY�tSARf11�Y MAR-FLEX_ 10 OVER
\I \ ���► i'_if isTPA ■= • HOT FLUID APPLIED WATERPR60FtNS` VER
�- , I Fi7 • CONCRETE FOUNDATION WALL (RE:STURAL)
�� �l • 2x FURRING AND INSULATION PER PLAN ON IN1I`ERLOR_R-9 MINIMUM 11111
li FRAMED INTERIOR PARTITION WALLS \
0 0
\ __ • BLOWN-IN CELLULOSE INSULATION \ IYCC a
CC
CONDITIONED CRAWLSPACE WALLS \ 0 O
\ \ • DRAIN AND DRY BOARD BY MAR-FLEX10 OVER N W J
• HOT-FLUID APPLIED WATERPROOFING OVER
• CONCRETE FOUNDATION WALL (RE:ST CTURAL) V
\., • 2X FURRING AND INSULATION PER PLA ON INTERIOR_R-9 MINIMUM \ O Cli J
la
1 ___
_ __
1
MASTER MASTERNCCsil
-BATHROOM BEDROOM
O
I - I "' 0
1
ILI
1
I
0
GUESTN
BATHROOM GUEST SPA
BEDROOM TERRACE-
im..imigmimmimm,. , - - - - -I I CIC
- - - - - -__ 1 0
HISTORICAL GRADE LINE
,! i
ISSUED FOR: DATE:
SCF6C DESIGN DATS.17
I •.r I TOV CONCEPTUAL REVIEW 6.26.17
I
—. a ®o
I �7J
I
II (/ 20MICHAEL SUMAN ARCHITECT,LLC.
\�� ALL RIGHTS RESERVED.
SCALE: 1/4"=V-0"
DRAWN:
PROJECT#: 1601
I I SHEET TITLE: SECTIONS
1 SITE SECTION A41 01
A4.01 SCALE: 1/4" = 1-0"