Loading...
HomeMy WebLinkAboutPEC17-0040_A4.01_1507668480.pdf .. ti of , ,a.,5 17 IS ir PEC GENERAL ASSEMBLY NOTES: APPROVED ROOF CEILING ASSEMBLY 10/9/201712:00:0 nA •STANDING SEAM METAL ROOF OVER • ROOF WATERPROOF MEMBRANE OVER •3 2" RIGID INSULATION AND SHEATHING_R-18 MIN. •STRUCTURAL PLYWOOD SHEATHING OVER (RE:STRUCTURAL) OVER • 2"SPRAY FOAM INSULATION AT BOTTOM SIDE OF SHEATHING_R-12.4 MIN. _ _ - _ __ _ •STRUCTURAL ROOF JOISTS (RE: STRUCTURAL) -- • 12" BLOWN-IN BLANKET INSULATION AT JOIST CAVITIES_R-48 MIN. (R-78.4 MIN.TOTAL) • 2 MIL SMART MEMBRANE VAPOR RETARDER • lx6 T&G DECKING OR DRYWALL PER REFLECTED CEILING PLANS RI - - _ _ \\ FLAT ROOF CEILING ASSEMBLY - 0 • STONE BALLAST ON ^ h 5 • PROTECTION LAYER OVER N t \ \ • FULLY-ADHERED EPDM ROOFING MEMBRANE ON o 7g � \ • ADHERED COVER BOARD OVER 0. U - MECHANICALLY ATTACHED RIGID BOARD INSULATION 3"MINIMUM AT DRAINS OVER HABITABLE o \ \ SPACE_R-18.0 MIN. 0 \ • TAPERED RIGID INSULATION E \ \ • STRUCTURAL PLYWOOD SHEATHING OVER (RE: STRUCTURAL) H \ 30'-0"HEIGHT LINE • 2"SPRAY FOAM INSULATION AT BOTTOM SIDE OF SHEATHING_R-12.4 MIN. Cd] • STRUCTURAL ROOF JOISTS UNLESS NOTED OTHERWISE (RE: STRUCTURAL) 0 \ \ \- \ \ 33'-0"HEIGHT LINE • 12" BLOWN IN BLANKET INSULATION IN CAVITY OVER HABITABLE SPACER 48 MIN. (R 78.4 TOTAL) v • 2 MIL SMART MEMBRANE VAPOR RETARDER E • 1x6 T&G DECKING OR DRYWALL PER REFLECTED CEILING PLANS 0 0) \- \- I- - STEEL ROOF SUPPORTS AND ALL STEEL STRUCTURE AT EXTERIOR TO INTERIOR TRANSITION U • ENCAPSULATE AT INTERIOR SIDE WITH 1 1/2"MIN. SPRAY FOAM INSULATION TO MIN. 4'-0" ill< w0 INSIDE FROM EXTERIOR FACE OF EXTERI R WALLS; MAKE CONTINUOUS WITH SPRAY FOAM - o N. I I \ \ INSULATION IN ROOF AND WALLSX 12 a I 2 \� \ FLOOR CEILING ASSEMBLY M O 6 N Q •SEE PLANS FOR FINISH I Ix w • 1 2' GYP-CRETE WITH RADIANT HEAT LOOPS OVER V/ 4 ; v, \ • PLYWOOD DECKING (RE:STRUCTURAL) VER •STRUCTURAL MEMBERS (RE:STRUCTURA • BLOWN-IN BLANKET INSULATION AT JOI CAVITIES_R-38 MIN. \ \\ \ •2' HAT CHANNEL OR$'SUSPENDED MET L GRID PER SECTIONS _ •SEE RCP'S FOR CEILING FINISH IIII I \ \ \\ - SLAB ON GRADE ASSEMBLY(I NTERI R FLOOR SIABS ONLY) _ _ -- `--. •SEE PLANS FOR FINISH •STRUCTURAL CONCRETE SLAB WITH • HYDRONIC HEAT TUBING OVER • 15 MIL POLYETHYLENE VAPOR DIFFUSIO RETARDER OVER • RIGID INSULATION R-10 MIN. OVER (1) • 6"GRAVEL BALLAST -__ - I Z \ FRAMED EXTERIOR WALLS 5_ \ \ • SEE ELEVATIONS FOR FINISH • HOME SLICKER RAINSCREEN OVER BARRIER/WEATHER-RESISTIVE BARRIER[VER IIIII - �� � �� ` • 2'PLYWOOf�SHEATHING ON • 2X6 WOOD STUBS- CI �� OVERSIZED , , , • 3"SPRAY FOAM INSULATION7Ai�NSIDE FIACE OF SHEATHING_R-18.6 MIN. p"wriim....*". 4.__________________,AN 2 CARGARAGE \ - � •• 2.5"BLOWN-IN BLANKET INSULATION-1'_ MIN. (R-28.6 TOTAL) MO Imo : (1) iNN..% �� -•� FOUNDATION W7fiL�S � • DRAIN AND DRY�tSARf11�Y MAR-FLEX_ 10 OVER \I \ ���► i'_if isTPA ■= • HOT FLUID APPLIED WATERPR60FtNS` VER �- , I Fi7 • CONCRETE FOUNDATION WALL (RE:STURAL) �� �l • 2x FURRING AND INSULATION PER PLAN ON IN1I`ERLOR_R-9 MINIMUM 11111 li FRAMED INTERIOR PARTITION WALLS \ 0 0 \ __ • BLOWN-IN CELLULOSE INSULATION \ IYCC a CC CONDITIONED CRAWLSPACE WALLS \ 0 O \ \ • DRAIN AND DRY BOARD BY MAR-FLEX10 OVER N W J • HOT-FLUID APPLIED WATERPROOFING OVER • CONCRETE FOUNDATION WALL (RE:ST CTURAL) V \., • 2X FURRING AND INSULATION PER PLA ON INTERIOR_R-9 MINIMUM \ O Cli J la 1 ___ _ __ 1 MASTER MASTERNCCsil -BATHROOM BEDROOM O I - I "' 0 1 ILI 1 I 0 GUESTN BATHROOM GUEST SPA BEDROOM TERRACE- im..imigmimmimm,. , - - - - -I I CIC - - - - - -__ 1 0 HISTORICAL GRADE LINE ,! i ISSUED FOR: DATE: SCF6C DESIGN DATS.17 I •.r I TOV CONCEPTUAL REVIEW 6.26.17 I —. a ®o I �7J I II (/ 20MICHAEL SUMAN ARCHITECT,LLC. \�� ALL RIGHTS RESERVED. SCALE: 1/4"=V-0" DRAWN: PROJECT#: 1601 I I SHEET TITLE: SECTIONS 1 SITE SECTION A41 01 A4.01 SCALE: 1/4" = 1-0"