GENERAL ASSEMBLY NOTES: APPROVED
ROOF CEILING ASSEMBLY 10/9/201712:00:00nA
•STANDING SEAM METAL ROOF OVER
• ROOF WATERPROOF MEMBRANE OVER
•3 2" RIGID INSULATION AND SHEATHING_R-18 MIN.
•STRUCTURAL PLYWOOD SHEATHING OVER (RE:STRUCTURAL) OVER
• 2"SPRAY FOAM INSULATION AT BOTTOM SIDE OF SHEATHING_R-12.4 MIN.
•STRUCTURAL ROOF JOISTS (RE: STRUCTURAL)
• 12" BLOWN-IN BLANKET INSULATION AT JOIST CAVITIES_R-48 MIN. (R-78.4 MIN.TOTAL)
• 2 MIL SMART MEMBRANE VAPOR RETARDER
• lx6 T&G DECKING OR DRYWALL PER REFLECTED CEILING PLANS
FLAT ROOF CEILING ASSEMBLY - o
\\ • STONE BALLAST ON ui
•• P OTECT ON LAYER OVER 7 t,
• FULLY-ADHERED EPDM ROOFING MEMBRANE ON o m
\\ \ • ADHERED COVER BOARD OVER a
U
- MECHANICALLY-ATTACHED RIGID BOARD INSULATION 3"MINIMUM AT DRAINS OVER HABITABLE 0
--- � c
SPACER 18.0 MIN. 0
• TAPERED RIGID INSULATION E
• STRUCTURAL PLYWOOD SHEATHING OVER (RE: STRUCTURAL) H
\ 30' 0" HEIGHT LINE • 2"SPRAY FOAM INSULATION AT BOTTOM SIDE OF SHEATHING R-12.4 MIN.
• STRUCTURAL ROOF JOISTS UNLESS NOTED OTHERWISE (RE: STRUCTURAL) C
\\ s-.. \\ 33' 0" HEIGHT LINE • 12" BLOWN IN BLANKET INSULATION IN CAVITY OVER HABITABLE SPACER 48 MIN. (R-78.4 TOTAL)
-, \ • 2 MIL SMART MEMBRANE VAPOR RETARDER E
• 1x6 T&G DECKING OR DRYWALL PER REFLECTED CEILING PLANS WI)
c)
�\ �- I- 12
STEEL ROOF SUPPORTS AND ALL STEEL STRUCTURE AT EXTERIOR TO INTERIOR TRANSITION 44 v
• ENCAPSULATE AT INTERIOR SIDE WITH 1 1/2"MIN. SPRAY FOAM INSULATION TO MIN. 4'-0" o
--...I..----2
\\ INSIDE FROM EXT RIOR FACE OF EXTERIOR WALLS; MAKE CONTINUOUS WITH SPRAY FOAM o
\ \ INSULATION IN R OF AND WALLS tik _
12 1.--
\ FLOOR CEILING ASSEMB U 6' N 0
I t •SEE PLANS FOR FI ISH Ix w N
\ VI At •
_ \\ \ \ • 1 2' GYP-CRETE WTTH RADIANT HEAT LOOPS OVER
\ • PLYWOOD DECKI JG (RE:STRUCTURAL)OVER
i :
•STRUCTURAL MEN BERS (RE:STRUCTURAL)
\ • BLOWN-IN BLANI -T INSULATION AT JOIST CAVITIES_R-38 MIN.
---
•2' HAT CHANNEL CR$'SUSPENDED METAL GRID PER SECTIONS
11
:----------s- -----
- �
•SEE RCP'S FOR CEILING FINISH
I
la
SLAB ON GRADE ASSEMB Y(INTERIOR FLOOR SLABS ONLY)
•SEE PLANS FOR FI ISH
•STRUCTURAL CO CRETE SLAB WITH
• HYDRONIC HEAT UBING OVER
• 15 MIL POLYETHY NE VAPOR DIFFUSION RETARDER OVER
I- II r \
• RIGID INSULATIO R-10 MIN. OVER (1)
I • 6"GRAVEL BALLAfTZ
L_
--- FRAMED EXTERIOR WALL
la
• SEE ELEVATIONS F R FINISH
• HOME SLICKER RAI SCREEN OVER
,�i -... ,. • AIR BARRIER/WE HER-RESISTIVE BARRIER OVER
• t �OOD SHEA HING ON
� \ � • 2X6 WOO�'ST-UpSJ
I ENTRY - \\ • 3"SPRAY FOAM If�Si`}L,ATION AT INSIDE FACE OF SHEATHING_R 18.6 MIN.
12
- - • 2.5"BLOWN-IN BL NKET IN�U.LATION_R-10 MIN. (R-28.6 TOTAL)
R R F FOUNDATION-WALLS
• DRAIN ARIDDR OARD BY MAR-FLEX -1&)OVER
• HOT-FLUID APPLI -9/'A-TE PROOFING OVER\
lin
•
i OPEN STEEL TRUSS TYP. II
• 2x FURRING AONDINSULOATION PE AN ONNTERIO\9 MINIMUM a
CNCRETEWALL (RE:STRUCTURAby
11111
___,
FRAMED INTERIOR ARTITION WALLS \ \
1 .-5
\ \ I ® • BLOWN-IN CELLU OSE INSULATION \ \ WCC
1
CONDITIONED CR WLSPACE WALLSCC
\ \ 0 0
117
• DRAIN AND DRY OARD BY MAR-FLEXR-10 OVER
• HOT-FLUID APPLIJ � O W
WATERPROOFING OVER \ \
1 LIVING • CONCRETE FOU ATION WALL (RE:STRUCTURAL) \ \ k v
= ROOM 1 • 2X FURRING AND INSULATION PER PLAN ON INTERIOR_R-9 MINIMUM\\ \\ O J
STORAGE/ - Q
LAUNDRY N \\ N
-
IEEE
W
O &
.... 1.1= I
1
CI)
WINE
ROOM N FAMILY
ROOM 1 -
i CC
HISTORICAL GRADE LINE y'^
ISSUED FOR: DATE:
FEEM6_ I �
I
SCF6C DESIGN DDITH.17
• •o I TOV CONCEPTUAL REVIEW 6.26.17
1•461 l O l
I I
(/ 20MICHAEL SUMAN ARCHITECT,LLC.
\�� ALL RIGHTS RESERVED.
SCALE: 1/4"=V-0"
DRAWN:
PROJECT#: 1601
I I SHEET TITLE: SECTIONS
1 SITE SECTION A4. 02
A4.02 SCALE: 1/4" = 1-0"