MAKE-UP AIR SYSTEM W/ ELECTRIC HEAT SNOWMELT MANIFOLD SCHEDULE FAN COIL SCHEDULE
FAN HEATER ELECTRICAL MANIFOLD AREA SQ BTU TOTAL ' I TUBE TUBE TUBE NO. FAN COOLING COIL - DX ELECTRIC HEATING COIL ELECTRICAL0
TOJig 10
FANTECH ADDITIONAL CARRIER ADDITIONAL
TAG CFM VOLTS / VOLTS/ NO. FT SQ FT MBH EWT _ LWT SPACING LENGTH SIZE LOOPS TUBE GPM TAG ARRANGEMENT CFM E.S.P. CFM TOTAL SENS. EAT VOLTS / VOLTS/
MODEL KW MOCP FEATURESMODEL HP SST ROWS MBH KW FLA STAGES MOCP FEATURES PEC
(8000 FT.) PHASE EAT LAT PHASE - - - (8000 FT.) @ S.L. OA MBH MBH (DB/WB) PHASE EAT LAT APD PHASE APPROVED
1 122 125 15.3 135 110 10 155 5/8 1 1.4 5/22/2017 12:00:00 AM
MUAS-1 MUAS 1600 1100 20 208/ 1 20 77 208/ 1 70 1,2,3,4,5 SUBTOTAL 122 15.3 155 1.4 FCU-1 42CEA10 HORIZONTAL CEILING 820 0.5 120 (2)1/6 27.5 21 80/ 59 45 3 17.1 5 24 208/ 1 3 60 83 0.5 208/ 1 30 1
MUAH 20/12
MUAS 1600 2 715 125 89.4 135 110 10 902 5/8 5 8.4
MUAS-2 600 20 208/ 1 -20 82.8 208/ 1 70 1,2,3,4 3 300 125 37.5 135 110 10 379 5/8 2 4.3 FCU-2 42CEA06 HORIZONTAL CEILING 500 0.4 85 1/6 17.3 13 80/ 59 45 3 10.2 3 14.4 208/ 1 2 60 82.8 0.5 208/ 1 20 1
MAUH 20/12
4 60 125 7.5 135 110 10 77 5/8 1 0.7
NOTES: NOTES:
5 365 125 45.6 135 110 10 461 5/8 2 5.0
1. ECM MOTOR, INTERLOCK WITH HOOD. 4. FILTER CABINET W/ PLEATED FILTER. 6 200 125 25.0 135 110 10 253 5/8 2 3.2 1. MOTORS TO BE PERMANENT SPLIT CAPACITOR TYPE.
2. MAKE-UP AIR CONTROL. 5. DUCT SILENCER. SUBTOTAL 1640 205.0 2067 21.5
3. METAL WALL INTAKE HOOD 7 176 125_ 22.0 135 110 10 223 5/8 1 2.1 L
8 700 125 87.5 135 110 10 883 5/8 4 8.2
9 76 125 9.5 135 110 10 97 5/8 1 0.9 BOILER SCHEDULE
SUBTOTAL 952 119.0 1203 11.2
GENERAL NOTES TOTAL 2714.0 339.3 3424.6 34.2 CAPACITY(MBH) WORK OPER TEMP. FLUE & COMB AIR OPER ELECTRICAL REQ
TRIANGLE TUBE ADDITIONAL t,�yty11$H ,rt,
1. Follow all applicable Codes and Ordinances. Payall fees andpermits and attain the same. TAG TYPE AFUE PRESS P R ESS WT. ,ti+► ,C ��,,
PP GENERAL NOTES MODEL ALT. OUTPUT MAX EQ FEATURES REQ. �+•' rc• • '„.
2. All equipment,insulation,and controls to meet local jurisdictionalauthority's adopted Energy Code. 1. MANIFOLD SHALL BE UPONOR ENGINEERED POLYMER(EP). S.L. INPUT 8000 FT PSIG PSIG EWT (°F) LWT(°F) SIZE TYPE FT EA LBS. VOLT/PH AMP MOCP .,11, ,*''' T : !.:f's
r
2. MANIFOLD SHALL HAVE FOLLOWING:
3. Visit site and ascertain existing conditions prior to bid. CPVC/PVC .1.4. The information presented on this drawing is diagrammatic and is not to be scaled. It does not necessarily represent all elbows, a. UPONOR EP BALANCING AND FLOW METER AT EACH LOOP RETURN B-1 SOLO 399 CONDENSING 399 318 95 30 18 160 180 4"0 SCH 40 100 200 120/ 1 2.1 15 1,2,3,5,6,8 (F1),9,10,12 _ ti,
duct extensions,offsets, hangers,etc.required fora complete working system. b. UPONOR THERMAL ACTUATOR AT EACH LOOP SUPPLY r kli
c. UPONOR EP END CAP W/VENT&DRAIN ON SUPPLY AND RETURN FEATURES: ±rr g+ sll�`
5. As-built scale drawings shall be submitted to Architect/Owner at completion showing all piping,duct,and equipment changes. * FLOWS BASED ON HIGH SPEED PUMP W/MAX 4 FT PIPING P.D. '�� . ,4y0AL »,� ti.�
d. UPONOR EP TEMPERATURE GUAGE OR SUPPLY AND RETURN �.
6. Shop drawings shall be submitted on all valves,fixtures, insulation,G.R.D.'s and equipment for response prior to ordering. Six 1. PID CONTROL LOGIC MODULATATION (30% TO 100%) 8. FLUE TYPE: `�irf 0 ,O ,t~�
(6)copies of each in one submittal within 10 days of signing contract. Clearlynote anydeviation between submitted items and 3. MAX LOOP LENGTH SHALL BE AS FOLLOWS: 2. ELECTRONIC INTERMITTANT IGNITIION (F1)-SEALED COMBUSTION/FLUE SCHEDULE 40 PVC/CPVC �`ff++rrlIIIn4 %.
p y g g a. 1/2" = 200 FT ( )
specified items on the cover sheet of the submittal. Failure to submit may cause specified items to be rejected and replaced 3. 439 STAINLESS STEEL HEAT EXCHANGER (F2)-FLUE VENT SCHEDULE 40 CPVC
at contractor's expense. b. 5/8" = 250 FT 4. 30% PROPYLENE GLYCOL 9. PROVIDE TEKMAR 263 MULTI BOILER RESET CONTROL W/BOILER INTERFACE MODULES EQUALS BY:
7. Extra costs or changes allowed only approved in writingbyArchitect/Owner with dollar amountprior to ordering. No extensions C. 3/4" = 330 FT
ifPP 5. 50% PROPYLENE GLYCOL 10. HIGH WATER& FLUE TEMPERATURE MANUAL RESET CONTROL IBC
of completion time allowed without written authorization. 4. ALL SUPPLY PIPE TO MANIFOLD SHALL BE L WITH TYPE L COPPER OR PEX. 6. LOW WATER/FLOW PRESSURE CUT OFF 11. CONCENTRIC VENT TERMINATION KIT(3" ONLY) MODEL HMV KIT 13 LOCHINVAR ,.
8. This Contractor is responsible for verifying all field conditions prior to the purchase of any materials and the commencement of 5. ALL RETURN PIPE MAY BE PEX UNINSULATED 7. OUTDOOR RESET CONTROL W/DOMESTIC WATER PRIORITY 12. NEUTRALIZER KIT FOR CONDENSATE VIESSMAN 424.0 Arch itectu re Inc
any work and is to notify the Architect of any discrepancies for resolution.
9. Provide Owner with 3 sets of typewritten and bound"Operating Instructions"for all systems and equipment,including
manufacturer's maintenance manuals. Include approved equipment submittals,equipment start-up reports,lubrication,filter �p� OWNER
types and sizes,balance report,starting and stopping procedures,and list service contractor's 24 hour telephone numbers. YYARMBOARD RADIANT HEATING ZONE/MANIFOLD LOOP SCHEDULE CONDENSING UNIT SCHEDULE R-410A (16 SEER )
10. Conceal all work in finished areas.
11. Cut and patch to match adjacent areas. No structural member shall be cut or notched without structural engineer's written LOOP NET BTU/SF @ CONDENSING UNIT ARCHITECT 4240 ARCHITECTURE
approval. MANIFOLD LOOP RADIANT 110 DEG F Surface TOTAL NO LOOP COOLING ADDITIONAL DEN21TSTUITE 117
DENVV ERR,,COCO 8 80216
12. Guarantee all labor and equipment for one year from the date of acceptance by Owner. ZONE TAG TAG DESCRIPTION AREA MBH EWT Temp EWT LWT BTU LOOPS GPM SPACING VOLTS / #OF #OF FEATURES CIVIL ALPINE ENGINEERING,INC.
13. Provide factory authorized start-ups and written start-up reports on all equipment. 1 ENTRY 322 6.4 20.0 80.0 110 90 6440 2 0.64 12" O.C. TAG CARRIER MODEL TOT.ARI MBH SEER PHASE REFRIG CIR. MOTORS HP MCA MOCP REQUIRED ENGINEER 34510 HIGHWAY 6 UNIT A-9
14. Fireproof all penetrations of rated floor/wall/ceiling/roof assemblies. Fireproofing and installation to be UL classified and ICBG 2 LIVING/DINING/RECEPT 1060 21.2 20.0 80.0 110 90 21200 6 2.12 12" O.C. EDWARDS,CO 81632
CU 1.5 24ABC618A003 18 16 208/230/1 1 (1) 1/12 11.8 20 1,2,3,4,5,6,7
approved,suitable for moisture and vibration. Metalcaulk by Rectorseal or equal. Install per all manufacturer recommendations. 3 KITCHEN 557 11.1 20.0 80.0 110 90 11140 4 1.11 12" O.C. LANDSCAPE SHERRY DORWARD
Submit fire stop schedule by manufacturer. 4 BEDROOM 2 820 16.4 20.0 80.0 110 90 16400 5 1.64 12" O.C. ARCHITECT P.O. BOX 3766
15. Provide nickel-plated and ceilingescutcheons of adjustablet eon all pipes passingthroughpartitions,and CU 2.5 24ABC630A003 30 16 208/230/1 1 (1) 1/10 16.8 25 1,2,3,4,5,6,7 VAIL,CO 81658
p 1 type p�p 9 5 KITCHENETTE 290 5.8 20.0 80.0 110 90 5800 2 0.58 12" O.C.
floors after painting is completed. 6 LIBRARY 295 5.9 20.0 80.0 110 90 5900 2 0.59 12" O.C. STRUCTURAL MONROE NEWELL
7 FAMILY ROOM 789 15.8 20.0 80.0 110 90 15780 5 1.58 12" O.C. 1. CONDENSING FURNACE @ 92% EFFICIENCY 6. AN (CYCLE RELAY. ENGINEER 70 BENCHMARK RD.SUITE 204
HYDRONIC RADIANT HEATING8 MASTER BEDROOM 1110 22.2 20.0 80.0 110 90 22200 6 2.22 12" O.C. 2. CONDENSER HAIL GUARDS. 7. AMBIENT LOCK OUT(50°F ADJ.). AVON,CO 81620
9 MASTER BATH 170 3.4 20.0 80.0 110 90 3400 2 0.34 12" O.C. 3. REFRIGERATION LINE SETS. MEP DMCE ENGINEERING
1. All labor,materials,components transportation,equipment and testing services to install hydronic radiant heating 10 YOGA 312 6.2 20.0 80.0 110 90 6240 2 0.62 12" O.C. 4. PROGRAMMABLE T-STAT. ENGINEER 5737 6TH AVE.
where indicated on drawings supplied for the project. 11 CARETAKER 585 11.7 20.0 80.0 110 90 11700 4 1.17 12" O.C. 5. HIGH ALTITUDE CONTROLS. LAKEWOOD,CO 80214
2. Hydronic radiant floor heating system with tube under or on floor. BOILER TOTAL 5988 119.76 119760 38 11.98 12" O.C.
3. System components shall be compatible,and substantially oxygen resistant or designed to ensure the integrity of GENERAL NOTES:
the system. Provide necessary j oining fittings. Galvanized components or fittings shall not to be used. 1. ALL LOOPS TO BE 1/2" HEPEX W/ OXYGEN BARRIER. PUMP SCHEDULE
4. Provide pipe anchors,clips,hangers,and supports to keep pipe level,free of sags or rises whether suspended with 2. ALL LOOPS TO SUPPLY ONLY GENERAL SUBLOOP AREA DESCRIBED.
fluid in it or encased in floor topping. 3. MAXIMUM LOOP LENGTH IS 200 FEET. REMARKS &
5. Use lever handle,full port ball valves for shut-off and to isolate equipment,parts of systems loops,or vertical risers. 4. SECURE PEX TO FLOOR 30 INCHES ON CENTER AND RADIUS OF ALL 90 AND 180 DEGREE BENDS. MANUFACTURER LOCATION SERIES FLOW HEAD ELECT FEATURES
6. Use plug or ball valves for throttling,bypass,or manual flow control services. 5. MARK ALL HEADERS WITH EACH LOOP AREA SERVED. TAG MODEL DUTY TYPE (GPM) (FT) RPM H.P. (VOLT/PH) REQ'D
7. Components of the buried tubing system shall be compatible,including: tube,fittings,manifolds,and other ancillary 6. ALL TUBING TO BE 12 INCHES ON CENTER EXCEPT WHERE SHOWN DIFFERENT ON DRAWINGS OR SCHEDULE. P 1A, P
items required fora complete installation. 1B & P-1 C TACO 121 B-1 CIRC. PUMP CIRC 31.8 8 1750 1/4 120/1 1
I
8. Shop drawings,or descriptions of materials,and details of installation shall be submitted for approval. No
fabrication shall be performed until approval is obtained. MECHANICAL NOTES HYDRONIC RADIANT SNOWMELT SYSTEM P-2 TACO 1634 PRIMARY PUMP IN-LINE 85.0 35 1750 1 120/1 1,2,6,8
9. Shop drawings:Indicate details for expansion,anchoring,and hanging, and precautionary signs.
10. Product Data:Provide data for the materials,fittings,valves,headers,pumps,controls, heat source,heat 1. Identify all HVAC and refrigeration equipment as to the area served by the equipment. Identification shall be engraved 1. All labor,materials,components transportation,equipment and testing services to install hydronic radiant snowmelt system where indicated P-3 TACO 121 DOMESTIC WATER PUMP CIRC 34.0 12 1750 1/4 120/1 1,8
exchangers,and accessories. Provide manufacturer's catalogue information. plastic tags permanently affixedto each piece of equipment. on drawings supplied for the project.
11. Tube shall carry a 25 year non-prorated warranty against failure due to defect in material and workmanship. 2. Provide UL rated fire or fire/smoke dampers where indicated on plans or schedules. Install per Building Department, UL, 2• Hydronic radiant floor heating system with tube in concrete for snowmelt system. P-4 TACO 132 RADIANT FLOOR SYSTEM PUMP CIRC 12.0 20 1750 3/4 120/1 1,9
Manifolds and other ancillary components shall be warranted for 18 months from date of shipment. and SMACNA requirements. Include labeled access for duct and ceiling/wall structures. Access doors to be UL rated in all 3. System components shall be compatible,and substantially oxygen resistant or designed to ensure the integrity of the system. Provide Z
12. Installation and system shall be warrantedfor one year from owner occupancy. Fire rated architectural assemblies. Include transformers for 115v/24v electrical connection. necessary joiningfittings. Galvanized components or fittings shall not to be used. P-5 TACOIL121 SNOWMELT HX PUMP IN-LINE 34.5 10 1750 1/4 120/1 1,7
4. Provide pipe anchors,clips,hangers,and supports to keep pipe level,free of sags or rises whether suspended with fluid in it or encased in O
13. Provide temporary end caps and closures on piping and fittings,maintained in place until installation. 3. Provide all curbs, supports, and anchors for mechanical work. No chain, tape, or wire may be used for hanging or concrete. P-6 TACO IL133 SNOWMELT PUMP IN-LINE 34.5 30 1750 3/4 120/1 1,4,7
14. Protect piping system from entry of foreign material. supporting. Provide and install all necessary shims and leveling devices to properly install all equipment in a level 5. Use lever handle,full port ball valves for shut-off and to isolate equipment,parts of systems loops,or vertical risers.
15. Qualifications: condition. 6. Use butterfly or ball valves for throttling,bypass,or manual flow control services. FEATURES REQUIRED: EQUALS BY:
a. Manufacturer:Company specializing in manufacturing the products specified in this section with minimum three 4. Receive, uncrate, assemble, insure, and install in conformance to Manufacturer's recommendations all equipment 7. Components of the buried tubing system shall be compatible,including: tube,fittings,manifolds,and other ancillary items required fora 1. NON-OVERLOADING MOTOR SELECTION. WILO
Imm
years experience. furnished by this contract and furnished by the Owner. complete installation. 2. VARIABLE SPEED PUMP WITH VARIABLE PRESSURE CONTROL. BELL & GOSSETT
b. Installer:Company specializing in performing the work of this section with minimum 2 year documented 8. Shop drawings,or descriptions of materials,and details of installation shall be submitted for approval. No fabrication shall be performed 3. VARIABLE SPEED PUMP WITH CONSTANT PRESSURE CONTROL. GRUNDFOSS
experience. 5. The new mechanical systems consisting of the air distribution system with: ductwork, flexible duct, diffusers, grilles, until approval is obtained. 4. SUITABLE AND SELECTED FOR 50% SOLUTION OF INHIBITED PROPYLENE GLYCOL. ARMSTRONG
dampers,control systems,etc.shall be by the mechanical contractor. 9. Shopdrawings:Indicate details for expansion,anchoring,and hanging, and precautionarysigns. PROVIDE THIS SOLUTION IN ALL SYSTEMS INDICATED ABOVE.
17. Acceptable Manufacturers: 9 9 g'
6. Ceiling cavity is nota return air plenum. 10. Product Data:Provide data for the materials,fittings,valves,headers,pumps,controls, heat source,heat exchangers,and accessories. 5. PROVIDE SUCTION DIFFUSER WITH STRAINER AND STARTUP SCREEN. >11111
a. Pipe: Provide manufacturer's catalogue information. 6. LEAD/LAG OPERATION
1) Wirsbo 7. Duct dimensions are clear inside dimensions. Overall outside duct dimensions shall be adjusted to allow for any liner 11. Tube shall carry a 25 year non-prorated warranty against failure due to defect in material and workmanship. Manifolds and other ancillary 7. INTERCONNECT WITH RESPECTIVE TEKMAR 665 SNOW MELT CONTROLLER. O
2)Rehau thickness. components shall be warranted for 18 months from date of shipment. 8. INTERCONNECT WITH REPECTIVE TEKMAR 263 BOILER CONTROLLER.
3)Approved equivalent 12. Installation and system shall be warranted for one year from beneficial occupancy. 9. INTERCONNECT WITH TEKMAR 368 RADIANT FLOOR CONTROLLER
8. All sheet metal to be made and installed to SMACNA Seal Class B standards with 45 degree maximum reducing, 30
b. Other components: degree maximum expanding transitions. All exposed rectangular ducts to be paint lock galvanized. Provide hollow blade 13. Provide temporary end caps and closures on piping and fittings,maintained in place until installation.
1) Sioux Chief turning vanes on 1.5 centerline radius for all elbows and tees. HVAC supply and return rectangular ducts to have a 14. Protect piping system from entry of foreign material.
Limi
minimum 1/2" thick, R2.2 thermal performance, 0.5 NRC sound absorption rated ductliner. All outside air ducts to 15. Qualifications: EXPANSION TANK SCHEDULE
2)Grundfoss have 2" thick, R8 insulation, 0.9 NRC sound absorption rated, UL 181 Class One fiberglass ductliner attached with 16. Manufacturer:Company specializing in manufacturingtheproducts specified in this section with minimum threeyears experience.
3)Taco Stic-Klips 15" o.c.each way and 100% coverage of flame proof adhesive. Increase duct to allow for liner. Seal all duct air p y p 9 p p ACCEPTANCE TOTAL
tight with two coats of duct sealant. a. Installer:Company specializing in performing the work of this section with minimum 2 year documented experience. C"-- L17
4)Hydrotherm
17. Acceptable Manufacturers: MANUFACTURER VOLUME VOLUME ADDITIONAL I-LU Ln N
5)Lochinvar 9. Caulk all duct joints air and water tight with permanent commercial caulk per Manufacturer's recommendations. a. Pipe: TAG MODEL LOCATION SERVICE TYPE (GALLONS) (GALLONS) FEATURES LU CO N
6) Raypak1) Wirsbo TACO HEATING WATER- CC N
YP 10. Concealed round ducts shall be low pressure construction, sealed air tight and externally insulated with 1-1/2", 3/4 lb. ET-1 MECH. ROOM BLADDER 17 57 1 I- O 0
CA215-125 PRIMARY RESIDENCE
7) Laars density blanket insulation with foil Scrimcraft facing. Seal all joints with caulk air tight. 2) Rehau (./) O LC)
3) Watts Radiant FEATURES: LJJ p O
8)Buderus 11. All round duct takeoffs shall be conical bell mouth spin-in fittings where duct dimension allows. 1. 50% PROPYLENE GLYCOL Z C', Q
9)Viesman b. Other components: 0
12. Provide condensate drain piping for all split system cooling coil units,i.e.fan coil units,furnaces,air handling units,etc. All 1) Sioux Chief io CC O -
18. Tube:
units shall have internal drain pans orprovide a drainpan capable of capturing all coolingcoil condensation. Pipe drains to
J
P P 9 P 2) Precission Hydronics CO "st
a. Tube and joints shall be cross-linked polyethylene with minimum working pressure/temperature of 160 psi at nearest pluming fixture or as shown on drawings. Provide condensate pump if proper sloping of drain pipe is not 3) Grundfoss OU N
73.4°F,100 psi at 180°F, 80 psi at 200°F. These temperatures and pressure ratings shall be issued by adequate.Coordinate with plumbing contractor. FAN SCHEDULE - CO
hydrostatic stress board of PPI(Plastic Pipe Institute).PPI is a division of SPI(Society of Plastics Industry). 4) Taco J M
b. The tube shall be manufactured in accordance with ASTM standard specification F 876. The tube shall be listed
13. This contractor shall coordinate all ductwork with other trades prior to installation. 5) Lochinvar ELECTRICAL DIMENSIONS M - 0
to ASTM F876-90 and F-877 and shall be approved by ICBO. 6) Raypak MANUFACTURER ALT. FAN SON ES AT VOLTS / W H D WEIGHT ADDITIONAL Q op
14. Weatherproof all mechanical roof penetrations per codes and all roofing manufacturer recommendations. HP > co
c. The tube shall be cross-linked polyethylene manufactured by the"Engel Method"withfullmemory 7) Laars TAG & MODEL FAN TYPE SERVES CFM S.P. RPM OPER. PT. PHASE (IN.) (IN.) (IN.) (LBS) FEATURES REQ.
characteristic. The tube shall have an oxygen diffusion barrier capable of limiting oxygen diffusion through the 15. Provide fire or smoke detectors on return for mechanical systems over 2000 CFM as required by codes or building 8) Buderus EF-1 PANASONIC CEILING TOILET EXHAUST 50 0.25 1101 0.3 7.7 WATTS 115/ 1 13 7 13.0 15 1,4,5,6,7,10
tube to no greater than 0.10g/m3/day at 104°F water temperature. standards. If two or more mechanical systems(i.e. rooftop units)serve the same area and when combined exceed 2000 9) Viesman FV-08VKM3
CFM,a fire or smoke detector shall be installed on the return of each unit when required by local authorities. 10) Amtrol PANASONIC SHOWER/ BATH
d. The tube dimensions shall be: M
EF-2 FV-13VK CEILING EXHAUST 100 0.25 912 0.6 15 WATTS 115/ 1 13 7 13.0 15 1,4,5,6,7,10 W
1) 3/4"nominal inside diameter(7/8"outside diameter),in accordancewith ASTM standard specification,as 16. Provide sleeves and collars for all ductwork and pipes through walls, floors,and ceilings. Seal all external penetrations 18. Tube:
above,or weather tight with exterior commercial grade caulk. Fireproof all penetrations of fire rated walls,floors and ceilings. a. Tube and joints shall be cross-linked polyethylene with minimum working pressure/temperature of 160 psi at 73.4°F,100 psi at 180°F, TF-1 GREENHECK CEILING HEAT TRANSFER 300 0.125 950 2 150 WATTS 115/ 1 14 7 11.5 15 1,4,5,8
2)5/8"nominal inside diameter(3/4"outside diameter),in accordancewith ASTM standard specification,as 80 psi at 200°F. These temperatures and pressure ratings shall be issued by hydrostatic stress board of PPI(Plastic Pipe Institute). SP-A510
above,or 17. Confirm voltage, phase, and ampacity with Electrical Contractor prior to ordering equipment. All control and interlock PPI is a division of SPI(Society of Plastics Industry). FEATURES: 1. CORRECT ALL FAN RPM FOR 8000 FT. ALTITUDE. 6. SWITCH ON W/ LIGHTS. 41
wiring for Mechanical equipment by mechanical contractor. Three phase motors to have magnetic starters with protection b. The tube shall be manufactured in accordancewith ASTM standard specification F 876. The tube shall be listed to ASTM F876-90 2. SEPARATE WALL SWITCH. 7. ENERGY STAR RATED
3) 1/2"nominal inside diameter(5/8"outside diameter),in accordancewith ASTM standard specification,as on all three leads. Controls and heating/cooling equipment to automatically restart after power failure. All wire to be in
above,or and F-877 and shall be approved by ICBG. 3. PROVIDE SOLID STATE SPEED CONTROL. 8. CONTROL W/TEMPERATURE SENSOR& REMOTE TSTAT. mEml
conduit where required by code.
4)3/8"nominal inside diameter(1/2"outside diameter),in accordance with ASTM standard specification,as c. The tube shall be cross-linked polyethylene manufactured by the"Engel Method"with full memory characteristic. The tube shall have 4. PROVIDE WALL OR ROOF CAP. 9. CONTROL WITH MOTION SENSOR.
above 18. All recirculated air shall pass through standard 30% MERV 8, throw away filters. Provide one additional clean set for an oxygen diffusion barrier capable of limiting oxygen diffusion through the tube to no greater than 0.10g/m3/day at 104 deg F water 5. GRAVITY BACKDRAFT DAMPER. 10. PROVIDE WALL OR ROOF CAP WITH BACKDRAFT FLAP. 4o
Owner at prof ectcompletion. temperature.
e. The minimum bend radius for cold bending of the tube shall not be less than 6 times the outside diameter. d. The tube dimensions shall be:
Bends with a radius less than stated shall require the use of a bend support as supplied by the tube 19. A minimum clearance of 36 inches shall be provided around any equipment or comply with manufacturer's requirements 1) 3/4"nominal inside diameter(7/8"outside diameter),in accordancewith ASTM standard specification,as above,or
manufacturer.
(i.e.,fans,pumps,boilers,air conditioners,etc.)for service and maintenance. Gas fired appliances shall be vented per the e. The minimum bend radius for cold bending of the tube shall not be less than 6 times the outside diameter. Bends with a radius less G.R.D. AND LOUVER SCHEDULE
19. Joints:Compression type j oints with internal support liner so that plastic pipe compresses against brass on inside of manufacturer's listing. Provide combustion air as required per code. than stated shall require the use of a bend support as supplied by the tube manufacturer.
pipe wall.
20. TEMPERATURE CONTROLS The HVAC System controls are to be fullyautomatic. All controls are to be electric. 19. Joints:Compression typejointswith internal support liner so that plastic pipe compresses against brass on inside of pipe wall.
20. Manifolds:Manifolds shall be cast brass or copper construction,manufactured of alloys to prevent dezincification, y MFG / FIRE MAX
and shall have integral circuit balancingvalves. Manifolds shall be able to vent air from the system,and shall be Temperature control setup and setback shall be accomplished by means of an electric thermostat with the following 20. Manifolds:Manifolds shall be cast brass or copper construction,manufactured of alloys to prevent dezincification,and shall have Venturi
g y features being standard: type circuit balancing valves. Manifolds shall be able to vent air from the system,and shall be provided with support brackets and tube TAG MODEL DMPR OBD N.C. ADDITIONAL FEATURES REQUIREMENTS
provided with support brackets and tube bend supports. Manifolds shall be isolated from supply and return tubing
a. Adjustable heating and cooling setpoints. bend supports. Manifolds shall be isolated from supply and return tubing with valves that are suitable for isolation and balancing. PRICE LOUVERED ADJUSTABLE YES STEEL
with valves that are suitable for isolation and balancing. A -- 30
b. Night and weekend programmable setback. 21. Fittings:Fittings shall be manufactured of dezincification resistant brass. These fittings must be supplied by the tube manufacturer. The SMDA SUPPLY DIFFUSER (G) VERTICAL DEFLECTION
21. Fittings:Fittings shall be manufactured of dezincification resistant brass. These fittings must be supplied by the c. Automatic changeover between heating and cooling cycles. fittings shall consist of a compression fitting with insert compression ring and a compression nut. D PRICE SIDEWALL YES 30 ALL STEEL,DOUBLE DEFLECTION
tube manufacturer. The fittings shall consist of a compression fitting with insert compression ring and a d. Minimum job eight(8)hour battery backups during power failure. 22. Supply And Return Piping To Manifolds: 520S SUPPLY 3/4"SPACING
compression nut. e. Optimal system startups to ensure correct temperature at occupancy. E PRICE SIDEWALL YES 30 ALL ALUMINUM
22. Supply And Return Piping To Manifolds: f. Lockable covers. a. Piping shall be copper type L pipe or cross-linked polyethylene tube with an integral oxygen diffusion barrier.Cross-linked
--g. All control systems shall be designed and provided by a control manufacturer who has been in the business of polyethylene tube should only be used when specifically approved by the local building inspector for supply and return piping 630L RETURN/OUTSIDE AIR 35°DEFLECTION,3/4"SPACING
a. Piping shall be copper type L or M pipe or cross-linked polyethylene tube with an integral oxygen diffusion barrier manufacturing,designing and installing control components and systems for a minimum of ten(10)years. applications. FEATURES:
if used with ferrous components. Cross-linked polyethylene tube should only be used when specifically approved b. Fittings shall be compatible with the piping material used.
A.USE LAY IN FRAME STYLE 3P ON ALL T-BAR CEILINGS. "USE OBD IN ALL NON
by the local building inspector for supply and return piping applications.
23. Controls:Coordinate all necessary control components with temperature controls contractor. For snowmelt applications use Tekmar B.USE FRAME STYLE 1 ON ALL HARD SURFACE CEILINGS. ACCESSIBLE CEILING AREAS
b. Fittings shall be compatible with the piping material used. controls. C.USE MAX 6FT.OF CODE APPROVED INSULATED FLEX DUCT. ONLY WHERE SPIN/DAMPER
23. Controls:Coordinate all necessary control components with temperature controls contractor. 24. Installation: D.MAXIMUM S.P.DROP=0.15"W.C.UNLESS OTHERWISE NOTED. CAN NOT BE SERVICED.
24. Installation: BALANCING NOTES a. Hydronic radiant heat tubing loops shall be installed in accordancewith the manufacturer's recommendations and the details as shown E.ALL CEILINGS DIFFUSERS TO HAVE 4-WAY DEFLECTION UNLESS SHOWN WITH THROW BLOCKING.
on the contract drawings.
a. Hydronic radiant heat tubing loops shall be installed in accordancewith the manufacturer's recommendations 1. Air balance shall be by[independent][NEBB Certified]Contractor in accordancewith the contract drawings. Provide b. All fittings should be accessible for maintenance.Tubing loops shall be installed without splices,as a minimum,from the point at which F.OBD MAYBE OMITTED IF ONLYONE RETURN INLET PER SYSTEM IS USED,
and the details as shown on the contract drawings. [NEBB]certified report to Owner(3 sets). the tubing enters the radiant header to the point at which it exits the radiant header. OR RETURN SYSTEM IS NON-DUCTED.
b. All fittings should be accessible for maintenance.Tubing loops shall be installed without splices,as a minimum, 2. Mechanical contractor shall put heating,ventilating,and air conditioning systems and equipment into full operation and c. Installation shall follow the drawings for tubing layout,tube spacing,manifold configuration,manifold location,and controls. All notes G.USE SPIN-IN FITTINGS WITH LOCKING BUTTERFLY DAMPER IN ACCESSIBLE LAY-IN CEILINGS,
from the point at which the tubing enters the radiant header to the point at which it exits the radiant header. shall continue the operation of same during each working day of testing and balancing. on the drawing shall be followed. All details not shown on plans shall be per shop drawings. IN LIEU OF OBD. USE OBD IN ALL NON ACCESSIBLE CEILING AREAS ONLY WHERE
c. Installation shall follow the drawings for tubing layout,tube spacing,manifold configuration, manifold location, 3. Balancing agency shall include an extended warranty of 90 days,after completion and architect or engineer's approval d. The tubing system shall be pressurized with water or air,in accordancewith applicable codes to a pressure of 60 psig 24 hours prior SPIN/DAMPER CAN NOT BE SERVICED
and controls. All notes on the drawing shall be followed. All details not shown on plans shall be per shop of test and balance work,during which time the architect or engineer at their discretion may request a recheck,or to encasement in the radiant panel. The tubing system shall remain at this pressure during the concrete pour,and fora minimum of EQUALS BY:GRD-KRUEGER,NAILOR,ANEMOSTAT;LOUVERS-RUSKIN,ARROW,UNITED EN ERTECH
drawings. resetting of any outlet,supply air fan,or exhaust fan as listed in the test report. 24 hours thereafter to ensure system integrity. The contractor shall provide the water or air for the pressurization of the tubing system.
The contractor assumes all liabilities for suitable safety precautions and testing,including the use of compressed air,when applicable. NOTE:PROVIDE A ROOM-BY-ROOM AIR DISTRIBUTION SCHEDULE UVITH THE DIFFUSER AND GRILLE SUBMITTAL.
d. The tubing system shall be pressurized with water or air,in accordancewith applicable codes to a pressure of 60 4. The balancing agency shall perform the tests and balance the air distribution for all systems including: supply and Second heating,if needed,to prevent freezing of liquid in tube if in concrete. INCLUDE TAG#,ROOM#,MANUFACTURER,MODEL#,NECK SIZE,BORDER SIZE,COLOR,OBD,QUANTITY,CFM
psig 24 hours prior to encasement in the radiant panel. The tubing system shall remain at this pressure during exhaust fans CFM,RPM,and amperage;main supply and return ducts pilot traverse,supply diffusers and registers,
the concrete pour,and for a minimum of 24 hours thereafter to ensure system integrity. The contractor shall and main exhaust ducts. e. Piping buried in slabs must be pressuretested and filled with water at the time of pouring. Provide 40%mixture of propylene glycol AND N.C.THROW @ 150 FPM.
provide the water or air for the pressurization of the tubing system. The contractor assumes all liabilities for for testing if freezing conditions may occur.
suitable safety precautions and testing,includingthe use of compressed air,when applicable. Second heating, if 5. Test and record the static pressure drops across all components of the air conditioning system including: [heating f. All locations where piping exits the concrete shall beprotected with 10 inch of 1/2"thick Armaflex pipe insulation or as shown on MAX AIR FLOW DUCT&FLEX 0.15"PER 100'
YP P PP PP 9 PP
section], [cooling coil],and filter section.
needed,to prevent freezing of liquid in tube if in concrete or gyperete. drawing details and approved by manufacturer. SIZE CFM SIZE CFM
6. In cooperation with the control manufacturer's representative,adjust automatically operated dampers to operate as
e. Piping buried in floor toppings or in slabs must be pressuretested and filled with water at the time of pouring. g. At start up time,the contractor shall: Follow the manufacturer's recommendations for system water or propylene glycol and
specified,indicated and/or noted. Testing agency shall check controls for proper calibrations and list controls requiring 64, 130 124) 800
f. All locations where piping exits the concrete shall beprotected with 10 inch of 1/2"thick Armaflex pipe insulation temperature balancing,record balance settings at each manifold location,and deliver to the owner a complete record of these settings
P P 9 P P adjustment by control installers. for inclusion in the operation and maintenance manuals. 74) 200 14� 1200
or as shown on drawing details and approved by manufacturer.
7. As a part of the work of this contract,the contractor shall make any changes in the pulleys,belts,and dampers or the h. Entire installation shall be supervised by trained hydronic radiant specialist,approved by manufacturer. 84, 300 16(1) 1800
g. At start up time,the contractor shall: Follow the manufacturer's recommendations for system water or propylene addition of dampers and minimum positions switches required for correct balance as recommended by the balancing 10(1) 500 18(1) 2400 A 03 FOR CONSTRUCTION 2017-09-01
and temperature balancing,record balance settings each manifold location,and deliver to the owner a i. Piping shall be free of crimps,kinks,and creases. Piping found to be defective shall be replaced in its entirety.
glycol P 9 agency at no additional cost to the owner. 0 02 PERMIT REVISIONS 2017-08-25
complete record of these settings for inclusion in the operation and maintenance manuals. j. Engineer must be formally notified for inspection of piping when complete yet unconcealed a minimum of 5 working days prior to
8. Provide balance and report of minimum outside air quantities on plans. concealment. A01 BUILDING DEPT COMM. 2017-08-16
h. Entire installation shall be supervised by trained hydronic radiant specialist,approved by manufacturer.
9. The balancing agency shall perform the tests to balance all water distribution systems. k. Provide permanent label notifying of presence of Hydronic Radiant System or Snowmelt System. S BUILDING PERMIT ISSUE 2017-07-07
i. Piping shall be free of crimps,kinks,and creases. Piping found to be defective shall be replaced in its entirety. MINIMUM OUTSIDE AIR VENTILATION RATES (PER 2015 IMC)
10. Test and adjust where appropriate the RPM and size of all pumps.Stipulate existing impeller size. Determine actual I. Provide cautionary notice and coordination with other trades throughout projectregarding installation of piping and resulting limitations
j. Engineer must be formally notified for inspection of piping when complete yet unconcealed a minimum of 5 system curve with control and balance valves wide open. Trim impeller to required diameter plus 10%. to slab/floor penetrations. ZONE DISTRIB. ZONE ISS.# DESCRIPTION DATE
working days prior to concealment. m. Provide recordphotograph
11. Test and record pumps and motors amperage after above adjustments. or digital photograph of all installed piping before concrete pour. Include one photo copy in each OCCUPANCY OCCUPIED OCCUPANT AREA VENT AREA VENT TOT ROOM EFFICIENCY OUTDOOR AIR PROJECT NO.: 21074.00
k. Provide permanent label notifying of presence of Hydronic Radiant System. Operations and Maintenance manual. CLASSIFICATIO SQ.FT. OCC DENSITY # OCCUPANT# OCC VENT RATE- CFM RATE-CFM/SF CFM VENT-CFM TABLE FLOW-CFM
12. Record pressure differential across all pumps at appropriate P and T ports. ROOM DESIGNATIONS N HVAC SYSTEMS Az /1000 SF (Pz) CFM/P R (RpPz) (Ra) (RaAz) (Vbz) 403.3.1.2 Ez (Voz) COMMENTS
I. Provide cautionary notice and coordination with other trades throughout projectregarding installation of piping n. Piping imbedded in slabs must be under test pressure during pour and for 24 hours after. Protect from freezing. If water in tube is ( ) ( P) ( P ) ( )
and resulting limitations to slab/floor penetrations. 13. Test and record the temperature and pressure drops and GPM flow rates across all components in the water removed after pour,extreme care must be exercised to blow out all water. Private MECHANICAL
distribution systems including: boilers,water chillers,fan coils,and pumps. o. All slab penetrations shall be sleeved or protected from bending, kinking,expansion,and physical damage. LIVING/ DINING Dwelling- FCU-1 1142 4 5 15 75 0 0 75 0.8 94
m.Provide record photograph or digital photograph of all installed piping before concrete pour. Include one photo 14. In cooperation with control manufacturer's representative,verifycorrect operation in both heatingand coolingmode of Private COVER SHEET
copy in each Operations and Maintenance manual. P p p p. Tubing shall be protected from sunlight(UV)where exposed for extended periods.
all control valves. MASTER BEDROOM Dwelling- FCU-2 722 4 3 15 45 0 0 45 0.8 57
n. Piping imbedded in floor toppings or in slabs must be under test pressure during pour and for 24 hours after. q. Snowmelt manifolds located at the exterior of the building shall be accessible. Locate manifold in landscaping areas in green hard
Protect from freezing. If water in tube is removed after pour,extreme care must be exercised to blow out all 15. Verify that all strainers and piping systems have been cleaned and flushed and that all air has been eliminated from the plastic irrigation boxes. Manifold located in hard surface areas(cement,pavers,etc)provide formed vault with steel cover. If located NOTES:
water. system before the performance of the hydronic balance. in a traffic area ensure vault and cover are rated accordingly. 1. ABOVE IS BASED ON 2015 IMC CHAPTER 4
o. All slab penetrations shall be sleeved or protected from bending, kinking,expansion,and physical damage. 16. Balance all recirculated domestic hot water systems and provide written report. r. Locate snowmelt sensor where noted on contract drawings.
p. Tubing shall be protected from sunlight(UV)where exposed for extended periods. M 0 0 1