HomeMy WebLinkAboutBegin_Workflow-07-02-2014_16-50-25.pdfClick Here to Save Eform as PDF...
Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip
Review Coordinator Lynne Campbell ( lcampbell@vailgov.com )
Review Cycle 2
Workflow/Activity Name Begin_Workflow / DepartmentReview
Activity InstructionsUpon acceptance of task, please review the required drawings and provide any applicable
comments and status.
Current User Logon Martin Haeberle ( mhaeberle@vailgov.com)
CHANGEMARKS Review Cycle:1
Filter Changemarks by Keyword: SEARCH SHOW ALL
Click Here to Load Changemarks...
Click Here to Publish Changemarks to PDF...
Sorting:
Resolved Status File Cycle Department File Markup Description Details Applicant Response
Yes | No Yes 1 Chief of
Building A01.pdf Cover
Sheet
Changemarks
note #01 Provide code editions project is designed to
done
Yes | No Yes 1 Chief of
Building A01.pdf Cover
Sheet
Changemarks
note #02 Indicate Occupancy and Building Type
done
Yes | No Yes 1 Chief of
Building A01.pdf Cover
Sheet
Changemarks
note #03 Indicate fire supression and alarm systems provided
done
Yes | No Yes 1 Chief of
Building A03.pdf Arch Changemarks
note #01
Show compliance with the EPA phase II of the town
code
the firebox will not be
replaced only the surround
Yes | No Yes 1 Chief of
Building A03.pdf Arch Changemarks
note #02
Detail on plans how the shaft enclosure is to be
maintained at the fireplace
the firebox will not be
replaced only the surround.
Yes | No Yes 1 Chief of
Building A03.pdf Arch Changemarks
note #03
Clarify if gas is to be provided at fireplace to include
gas piping schematics per TOV submittal
requirements
the firebox will not be
replaced only the surround.
Yes | No Yes 1 Chief of
Building A03.pdf Arch Changemarks
note #04
Clarify adaptability of the exisintg fireplace flue for
the new fireplace.
the firebox will not be
replaced only the surround.
Yes | No Yes 1 Chief of
Building A03.pdf Arch Changemarks
note #05
Annotate on plans that lighting fixtures to be 75%
high efficacy
Noted on plans.
Yes | No Yes 1 Chief of
Building A03.pdf Arch Changemarks
note #06
Clarify if additional electrical circuits are to be
provided. If so provide electrical load calculations
showing adequete panel loading capacity.
Nothing additional
Complete Review Request Additional Group Save & Close
Building Process V1
Yes | No Yes 1 Chief of
Building A03.pdf Arch Changemarks
note #07
Provide u value and fire rating of entry door. note if
on exterior DRB approval required for the door
Keeping existing door re
staining only.
Yes | No Yes 1 Chief of
Building A03.pdf Arch Changemarks
note #08
Indicate CO/ Smoke detection devices are in place
and their locations
There is one smoke
detector. this will be
replaced with a new one
that is CO as well.
CO/smoke detectors will
Show My Changemarks
DEPARTMENT REVIEW Review Cycle:2
CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES
2 BUILDING
MARTIN HAEBERLE
MHAEBERLE@VAILGOV.COM
InReview
VIEW CHECKLIST
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
Requested Groups
0 Groups Selected Remove all Add all
Planning
Chief of Planning
Chief of Building
Fire