Loading...
HomeMy WebLinkAboutBegin_Workflow-07-02-2014_16-50-25.pdfClick Here to Save Eform as PDF... Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip Review Coordinator Lynne Campbell  ( lcampbell@vailgov.com ) Review Cycle 2 Workflow/Activity Name Begin_Workflow / DepartmentReview  Activity InstructionsUpon acceptance of task, please review the required drawings and provide any applicable  comments and status. Current User Logon Martin Haeberle ( mhaeberle@vailgov.com)  CHANGEMARKS ­ Review Cycle:1 Filter Changemarks by Keyword:  SEARCH    SHOW ALL Click Here to Load Changemarks... Click Here to Publish Changemarks to PDF... Sorting: Resolved Status File Cycle Department File Markup Description Details Applicant Response Yes | No Yes 1 Chief of Building A01.pdf Cover Sheet Changemarks note #01 Provide code editions project is designed to done Yes | No Yes 1 Chief of Building A01.pdf Cover Sheet Changemarks note #02 Indicate Occupancy and Building Type done Yes | No Yes 1 Chief of Building A01.pdf Cover Sheet Changemarks note #03 Indicate fire supression and alarm systems provided done Yes | No Yes 1 Chief of Building A03.pdf Arch Changemarks note #01 Show compliance with the EPA phase II of the town code the firebox will not be  replaced ­ only the surround Yes | No Yes 1 Chief of Building A03.pdf Arch Changemarks note #02 Detail on plans how the shaft enclosure is to be maintained at the fireplace the firebox will not be  replaced ­ only the surround. Yes | No Yes 1 Chief of Building A03.pdf Arch Changemarks note #03 Clarify if gas is to be provided at fireplace to include gas piping schematics per TOV submittal requirements the firebox will not be  replaced ­ only the surround. Yes | No Yes 1 Chief of Building A03.pdf Arch Changemarks note #04 Clarify adaptability of the exisintg fireplace flue for the new fireplace. the firebox will not be  replaced ­ only the surround. Yes | No Yes 1 Chief of Building A03.pdf Arch Changemarks note #05 Annotate on plans that lighting fixtures to be 75% high efficacy Noted on plans. Yes | No Yes 1 Chief of Building A03.pdf Arch Changemarks note #06 Clarify if additional electrical circuits are to be provided. If so provide electrical load calculations showing adequete panel loading capacity. Nothing additional Complete Review  Request Additional Group  Save & Close   Building Process V1 Yes | No Yes 1 Chief of Building A03.pdf Arch Changemarks note #07 Provide u value and fire rating of entry door. note if on exterior DRB approval required for the door Keeping existing door ­ re­ staining only. Yes | No Yes 1 Chief of Building A03.pdf Arch Changemarks note #08 Indicate CO/ Smoke detection devices are in place and their locations There is one smoke  detector.  this will be  replaced with a new one  that is CO as well.   CO/smoke detectors will  Show My Changemarks DEPARTMENT REVIEW ­ Review Cycle:2   CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES 2 BUILDING MARTIN HAEBERLE  MHAEBERLE@VAILGOV.COM InReview VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE Requested Groups 0 Groups Selected Remove all Add all Planning Chief of Planning Chief of Building Fire