HomeMy WebLinkAboutB14-0126 REV1.pdfTOWI/ OF9 Department of Community Development
75 South Frontage Road
Vail, CO 81657
Tel: 970.479.2128
www.vailgov.com
Development Review Coordinator
TRANSMITTAL FORM
Use this form when submitting additional information for planning applications or building permits.
This form is also used for requesting a revision to building permits. A two hour minimum building review
fee of $110 will be charged upon reissuance of the permit.
Project Street Address:
ti>o (lS2v SAtJt>stb~E. (lt>
(Number) (Street) (Suite#)
@'Revisions O Response to Correction Letter
D_attached copy of correction letter 0 Deferred Submittal O Other ___________ _
Building/Complex Name: ~ £trscl+ CUC:> Description of Transmittal/ List of Changes, Items Attached:
Applicant Information e1 ~tz.\ Bc..M-io t1 ---ro
(architect, contractor, owner/owner's rep) ~n ~~ / '\\ neM,~ .(\-) VV\\S ~. 3 ·_u/""'~''"" Contact Name: i=;vvy (A>\t\)tJ (;,~€.--~0"-1.)~ _ f ~ {~
Address: Yt)~OO \-\ivy b { ~ (1\>r" 8'8'b'f -------------
City [\\~ .J State: Cf> Zip: ~ {°' ()
Contact Name: __ QA?""'"""''-'-~'f-'--__..C6.c.=...)1D_,_._-=-=---.J-----
Contact Phone: _ ___;:q4...A7...,.QL---_3,o......,;.._,Cf~--O.::::._;_l 0..::..-..;.l._-=----
(use additional sheet if necessary)
Building Permits:
Contact E-Mail: CoTI tJ~bt#JS'c)fJ .{' Revised ADDITIONAL Valuations (Labor & Materials)
0 Jt)(DO NOT include original valuation)
I hereby acknowledge that I have read this application, filled out
in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to
comply with the information and plot plan, to comply with all Town
ordinances and state laws, and to build this structure according
to the town's zoning and subdivision codes, design review ap-
proved, International Building and Residential Codes an
ordin~~abl~ thereto. x ====-
For Office Use Only:
Fee Paid:------------------
Received From: ----------------
Cash---------Check# ______ _
CC: Visa I MC Last 4 CC # exp. date: ____ _
Authorization#----------------
Building:
Plumbing:
Electrical:
Mechanical:
Total:
Date Received:
$
$
$
$
$0
AUG 15 2014
~ 12.~0
TO\A/N OF VAIL
Monroe & Newell
Engineers, Inc.
June 30, 2014
Victor Mark Donaldson Architects, P.C.
90 Benchmark Road, Suite 207
Avon, CO 81620
Attn: Mr. Brent Crouch
Re: Potato Patch (M&N Ref. #9020.00)
Gentlemen:
Vail, Colorado
Denver, Colorado
Frisco, Colorado
As discussed, it is our opinion the existing steel beams o
for the new deck framing.
6~ can be re .. used
The quantity of lag bolts that fasten the existing rim joists are to be verified. Lags should
be installed, if necessary, to provide one lag bolt per 16 inches ofrim. These may be 2 at
2'-8. New lags should be 3/4" diameter by S'' long.
If you have any questions or comments, please call.
www.monroe-newell.com
70 Benchmark Road • Suite 204 • P.O. Uo~ 1597 • Avon, Colorado 81620
(970) 949-7768 • FAX (970) 949-4054 • email' avon@monroe-newell.com