Loading...
HomeMy WebLinkAboutA001.pdf1344 SF (EXISTING) 22 23 BEDROOM (EXISTING) BEDROOM (EXISTING) BATH (EXISTING) ENTRY (EXISTING) KITCHEN (EXISTING) GREAT ROOM (EXISTING) BATH (EXISTING) 23 2424 505 SF (EXISTING) VAULTED CEILING @ MAIN LEVEL (EXISTING) LOFT (EXISTING) VAULTED CEILING @ MAIN LEVEL (EXISTING) LOFT (EXISTING) BATH (EXISTING) 22 2321 23 2424 P R O J E C T : D R A W N B Y : D A T E : R E V I S I O N S : 2511 SG 11.14.13 1 1/4" = 1'-0" EXISTING FLOOR PLAN -- ENTRY LEVEL (FOURTH FLOOR) 2 1/4" = 1'-0" EXISTING FLOOR PLAN -- LOFT LEVEL (FOURTH FLOOR) Attic Space Install New Kitchen Cabinets, Countertops, Appliances and Plumbing Fixtures Install new wood flooring throughout great room and kitchen Install New glass spiral staircase per code- same location as existing Repaint entire unit walls and ceilings Install smoking exhaust fan in great room near deck New stone flooring at entry Bedroom carpet is to be removed for construction and reinstalled at end of project Install new closet shelving and lighting All new bath room finishes including new vanity/ counter top, replace existing tub with shower only new tile Keep existing bath vanity and toilet- replace all tile, and new shower/ tub New Wood Ceiling in this bedroom New A/V wiring and TV's Installed in great room/ bedrooms GENERAL NOTES- 1- Verify Carbon Monoxide Detector installed 2- Asbestos Test- Result negative 3- Verify All Elec/ Mech meets current code 4- At Least 75% of new lighting to be high efficency 5- Existing Fire Sprinkler system to remain Install new closet shelving and lighting Keep existing bath vanity and toilet- replace all tile, and new shower/ tub Northwoods Condos 600 Vail Valley Drive Unit E413 Vail, CO ELECTRICAL NOTES- Install new recessed can lighting as indicated on these drawings, exact location to be verified on site Install 3 new pendant lights to be centered over dining room table 05/07/14