HomeMy WebLinkAboutA001.pdf1344 SF
(EXISTING)
22 23
BEDROOM
(EXISTING)
BEDROOM
(EXISTING)
BATH
(EXISTING)
ENTRY
(EXISTING)
KITCHEN
(EXISTING)
GREAT ROOM
(EXISTING)
BATH
(EXISTING)
23 2424
505 SF
(EXISTING)
VAULTED CEILING
@ MAIN LEVEL
(EXISTING)
LOFT
(EXISTING)
VAULTED CEILING
@ MAIN LEVEL
(EXISTING)
LOFT
(EXISTING)
BATH
(EXISTING)
22 2321 23 2424
P R O J E C T :
D R A W N B Y :
D A T E :
R E V I S I O N S :
2511
SG
11.14.13
1 1/4" = 1'-0"
EXISTING FLOOR PLAN -- ENTRY LEVEL (FOURTH FLOOR) 2 1/4" = 1'-0"
EXISTING FLOOR PLAN -- LOFT LEVEL (FOURTH FLOOR)
Attic
Space
Install New
Kitchen
Cabinets,
Countertops,
Appliances
and
Plumbing
Fixtures
Install new wood
flooring throughout
great room and kitchen
Install New
glass spiral
staircase per
code- same
location as
existing
Repaint entire unit
walls and ceilings
Install
smoking
exhaust fan in
great room
near deck
New stone
flooring at
entry
Bedroom carpet is to
be removed for
construction and
reinstalled at end of
project
Install new
closet
shelving
and lighting
All new bath room finishes including
new vanity/ counter top, replace
existing tub with shower only new tile
Keep existing
bath vanity
and toilet-
replace all
tile, and new
shower/ tub
New Wood
Ceiling in
this bedroom
New A/V wiring
and TV's
Installed in great
room/ bedrooms
GENERAL NOTES-
1- Verify Carbon Monoxide
Detector installed
2- Asbestos Test- Result
negative
3- Verify All Elec/ Mech
meets current code
4- At Least 75% of new
lighting to be high efficency
5- Existing Fire Sprinkler
system to remain
Install new
closet
shelving
and lighting
Keep existing
bath vanity
and toilet-
replace all
tile, and new
shower/ tub
Northwoods
Condos
600 Vail Valley
Drive Unit
E413
Vail, CO
ELECTRICAL NOTES-
Install new recessed can
lighting as indicated on
these drawings, exact
location to be verified on site
Install 3 new
pendant lights to
be centered over
dining room table
05/07/14