Loading...
HomeMy WebLinkAboutB14-0138 COMCheck - Suite 204.pdfProject Title: Suite 204 GALLERY Report date: 04/11/14 Data filename: J:\2699.00 - Solaris 204 & 205\Ltg Calcs\269900LC02 - UNIT 204.cck Page 1 of 2 COMcheck Software Version 3.9.3 Interior Lighting and Power Compliance Certificate 90.1 (2007) Standard Section 1: Project Information Project Type: New Construction Project Title : Suite 204 GALLERY Construction Site: Owner/Agent: Designer/Contractor: Lot P, Block 5-D Vail Village Filing No.1 Vail, CO 81657 AE Design Group, Inc 1900 Wazee St. Ste 350 Denver, CO 80202 303.296.3034 Section 2: Interior Lighting and Power Calculation A Area Category B Floor Area (ft2) C Allowed Watts / ft2 D Allowed Watts (B x C) Retail:Sales Area 2605 1.7 4429 Allowance: Other retail highlighting / Fix. ID: F1 2605(a)1 1856(b) Total Allowed Watts =6285 (a) Area claimed must not exceed the illuminated area permitted for this allowance type. (b) Allowance is (B x C) or the actual wattage of the fixtures given in Section 2, whichever is less. Section 3: Interior Lighting Fixture Schedule A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixtures D Fixture Watt. E (C X D) Retail:Sales Area (2605 sq.ft.) Linear Fluorescent 1: F1: 4' RECESSED LINEAR FLOURESCENT: 46" T5 HO 54W: Electronic: 1 32 58 1856 Linear Fluorescent 2: F1A: 4' LINEAR FLUORESCENT: 46" T5 HO 54W: Electronic: 2 2 117 234 Halogen 1: F2: MR16 MULTIPLE: Halogen MR-16 50W:6 2 300 600 LED 1: F3: LED TAPE LIGHT: Other:1 1 35 35 Halogen 2: F4: MR16 MULTIPLE: Halogen MR-16 20W:3 11 60 660 Halogen 3: F7: MR16 ADJUSTIBLE: Halogen MR-16 20W:1 29 20 580 Linear Fluorescent 3: F8B: 2' RECESSED WALL WASHER: 22" T5 HO 24W: Electronic: 1 7 26 182 Linear Fluorescent 4: F8D: 4' RECESSED WALL WASHER: 46" T5 HO 54W: Electronic: 1 25 58 1450 Total Proposed Watts =5597 Interior Lighting PASSES: Design 11% better than code. Section 4: Compliance Statement Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed lighting system has been designed to meet the 90.1 (2007) Standard requirements in COMcheck Version 3.9.3 and to comply with the mandatory requirements in the Requirements Checklist. Name - Title Signature Date Section 5: Post Construction Compliance Statement 4/11/2014 Jeff Mullikin 4/11/2014 Project Title: Suite 204 GALLERY Report date: 04/11/14 Data filename: J:\2699.00 - Solaris 204 & 205\Ltg Calcs\269900LC02 - UNIT 204.cck Page 2 of 2 Record Drawings and Operating and Maintenance Manuals: ❑1. Construction documents with record drawings and operating and maintenance manuals provided to the owner. Lighting Designer or Contractor Name Signature Date 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014