HomeMy WebLinkAboutB14-0138 COMCheck - Suite 205.pdfProject Title: Suite 205 GALLERY Report date: 04/11/14
Data filename: J:\2699.00 - Solaris 204 & 205\Ltg Calcs\269900LC01 - UNIT 205.cck Page 1 of 2
COMcheck Software Version 3.9.3
Interior Lighting and Power
Compliance Certificate
90.1 (2007) Standard
Section 1: Project Information
Project Type: New Construction
Project Title : Suite 205 GALLERY
Construction Site: Owner/Agent: Designer/Contractor:
Lot P, Block 5-D
Vail Village Filing No.1
Vail, CO 81657
AE Design Group, Inc
1900 Wazee St. Ste 350
Denver, CO 80202
303.296.3034
Section 2: Interior Lighting and Power Calculation
A
Area Category
B
Floor Area
(ft2)
C
Allowed
Watts / ft2
D
Allowed Watts
(B x C)
Retail:Sales Area 1301 1.7 2212
Allowance: Furniture, clothing, cosmetics highlighting / Fix. ID: T1 728(a)2.6 1893(b)
Common Space Types:Active Storage 151 0.8 121
Supplemental Allowed Watts(c) =1000
Total Allowed Watts =5225
(a) Area claimed must not exceed the illuminated area permitted for this allowance type.
(b) Allowance is (B x C) or the actual wattage of the fixtures given in Section 2, whichever is less.
(c) Supplemental watts must be associated with retail merchandise highlighting fixtures. Supplemental watts are not included
calculation of lighting complaince percentage.
Section 3: Interior Lighting Fixture Schedule
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
D
Fixture
Watt.
E
(C X D)
Retail:Sales Area (1301 sq.ft.)
Linear Fluorescent 1: R1: 2X2 RECESSED TROFFER: 24" T8 17W: Electronic: 2 1 33 33
Track lighting 1: T1: TRACK LIGHTING: Wattage based on 118 feet of track 0 0 3540 3540
Linear Fluorescent 2: (E): 4' LINEAR FLUORESCENT: 46" T5 HO 54W: Electronic: 1 2 64 128
Common Space Types:Active Storage (151 sq.ft.)
Total Proposed Watts =3701
Interior Lighting PASSES: Design 12% better than code.
Section 4: Compliance Statement
Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans, specifications and
other calculations submitted with this permit application. The proposed lighting system has been designed to meet the 90.1 (2007) Standard
requirements in COMcheck Version 3.9.3 and to comply with the mandatory requirements in the Requirements Checklist.
Name - Title Signature Date
Section 5: Post Construction Compliance Statement
Record Drawings and Operating and Maintenance Manuals:
4/11/2014
Jeff Mullikin 4/11/2014
Project Title: Suite 205 GALLERY Report date: 04/11/14
Data filename: J:\2699.00 - Solaris 204 & 205\Ltg Calcs\269900LC01 - UNIT 205.cck Page 2 of 2
❑1. Construction documents with record drawings and operating and maintenance manuals provided to the owner.
Lighting Designer or Contractor Name Signature Date
4/11/2014
4/11/2014
4/11/2014
4/11/2014