HomeMy WebLinkAboutB14-0160 special inspection report final.pdf,_ __ ' I , . ;, 1 \ 1 ~ , I ' 1, i r, -~ech { J ! : ; ',\I., j -: I 1 l l _:.·~. : : c I !1 -: t 1,' l HEPWORTH-PAWLAK GEOTECH!'JICl\L July 31, 2014 Nedbo Construction Attn: Nate Brandenburg P.O. Box 3419 Vail, Colorado 81658 nate@nedbo.com l '', rll. !)~ -·-+--1 i-! ; ,-',_' I+:-, -+ ii 111 'i: Job No. 114 179A Subject: Gentlemen: Construction Observation and Testing Completion Letter, Deck Pads and Elevator Addition, Northwood Condominiums, Unit Fl, 600 Vail Valley Drive, Vail, Colorado As requested by Warren Krok ofNedbo Construction, we are providing a summary of our observation and testing services provided for the above referenced project. The reports of the services requested and performed for the project are attached. We previously evaluated the bearing soils for design of foundations at the site and presented our findings in a report dated May 30, 2014, Job No. 114 179A. The foundation bearing soils exposed at the bottom of the excavation were observed on May 21 and 27, 2014, dowel holes and epoxy placement were observed on May 28, 2014, and fresh concrete placed for the foundation was sampled and tested on May 28 and 30, 2014 according to the project specifications. Based upon inferences drawn from our observation and testing, as documented by the attached daily field reports, it is our professional opinion that the referenced construction has achieved the specified conditions. Please recognize that construction observation and testing are sampling functions that involve direct observation and testing of very limited amount of the overall work to evaluate the construction compliance. If you have any questions or need further assistance, please call our office. Sincerely, SLP/ksw Attachments: cc: Nedbo Construction -Warren Krok(\\ an~t;'.W~nedho.qim) Parker 303-841-7119 • Cnloradl1S~•rings 719-633-5562 • Siln:rthnrne 970-468-1989 ~ HEPWORTH -PAWLAK GEOTECHNICAL 5020 County Road 154 Glenwood Springs, CO 81601 Phone: 970-945-7988 Fax: 970-945-8454 REINFORCEMENT STEEL INSPECTION REPORT Client: Nedbo Construction Attn: Nate Brandenburg P.O. Box 3419 Vail, Colorado 81658 Job No.: 114179A Day: Date: Page: Wednesday 5/28/14 1 of 1 Project: Proposed Deck Pads and Elevator Additions, Northwood Condominiums, Unit F1, 600 Vail Valley Drive, Vail, Colorado Area of Inspection: Reference Documents Used: structural drawings provided by Vasequez Concrete and Red Head hollow base material screen instructions Inspection Status: D Preliminary rgj Final rgj Concrete reinforcement as noted above was judged to be in reasonable conformance with the referenced construction documents. D Exceptions Noted: holes were a depth of 6" and free of debris prior to placement of epoxy and dowels. Red Head C6+ and Red Head A7 adhesives were used in the epoxy process Verbal Communication: Distribution: Nate with Nedbo Construction and Gilbert with Vasquez Concrete were informed of our inspection results. Nedbo Construction -Nate Brandenburg (nate@nedbo.com) Justin Orgill Steven L. Pawlak, P.E. Field Technician Reviewed By C~ech HEPWORTH -PAWLAK GEOTECHNICAL 5020 County Road 154 Glenwood Springs, CO 81601 Phone: 970-945-7988 Fax: 970-945-8454 hpgeo@hpgeotech.com CONCRETE TEST REPORT Nedbo Construction Attn: Nate Brandenburg P.O. Box 3419 Vail, Colorado 81658 Job No. 114179A Date Cast: 05-28-14 Sheet: 1of1 Project: Proposed Deck Pads and Elevator Additions, Northwood Condominiums, Unit F1, 600 Vail Valley Drive, Vail, Colorado ~_.,.,----- Placement Location: F1 Elevator Pit FooUng a~ Way FooU~ Supplier: United Time Batched: Not on ticket Load Size (Yds): 3 Truck No: 0000 Time Arrived: 1:40 pm Yds Delivered: 3 Ticket No: 33501623 Time Placed: 1:45 pm Yds Ordered: 3 Mix Design: 35010400 Method of Placement: Truck Sample Point: Truck Discharge Time Sampled: Air Temp: Concrete Temp: Water Added: 1:59 pm Wet Unit Wt: 70° Slump: 72° Air Content: 8 gallons per Contractor 142.4 pcf 3.0 inches 5.3 % Communication: The Contractor and Supplier were informed of our field test results. Time Cylinders Cast: 2:09 pm Initial Cure Time On Site: 1 day Field Storage: Insulated Cure Box Date in Lab: 05-29-14 Cylinder Temperature at Pick Up: 87° Min/Max: 74°/95° Compressive Strength Data 2014 Compressive 28 Day Lab Age Load Diameter Area Days Date lbs. in. in2 Strength (psi) Avg. (psi) Number 330A 7 06-04-14 37,200 4.01 12.63 2950 330B 28 06-25-14 51,800 4.01 12.63 4100 330C 28 06-25-14 51,500 4.01 12.63 4080 4090 3300 Hold/56 Discarded Specified Strength for Structure: 3000 psi at 28 days Specified Strength for Mix: 3000 psi at 28 days Notes: Distribution: Nedbo Construction -Nate Brandenburg (nate@nedbo.com) United -Rick Seymour (rseymour@united-gj.com) Justin Orgill Field Technician /ljg Thomas J. Westhoff, CET Reviewed By ·~ech HEPWORTH -PAWLAK GEOTECHNICAL 5020 County Road 154 Glenwood Springs, CO 81601 Phone: 970-945-7988 Fax: 970-945-8454 hpgeo@hpgeotech.com CONCRETE TEST REPORT Nedbo Construction Attn: Nate Brandenburg P.O. Box 3419 Vail, Colorado 81658 Job No. 114179A Date Cast: 05-30-14 Sheet: 1 of 1 Project: Proposed Deck Pads and Elevator Additions, Northwood Condominiums, Unit F1, 600 Vail Valley Drive, Vail, Colorado Placement Location: F1 Elevator Pit Wall a~ Way W~ Supplier: United Time Batched: 1 :03 pm Load Size (Yds): 5 Truck No: 42 Time Arrived: 1:23 pm Yds Delivered: 5 Ticket No: 121 Time Placed: 1:28 pm Yds Ordered: 5 Mix Design: 35010400 Method of Placement: Truck Sample Point: Truck Discharge Time Sampled: Air Temp: Concrete Temp: Water Added: 1:34 pm 50° 64° None Wet Unit Wt: Slump: Air Content: 140.0 pcf 4% inches 6.8% Communication: The Contractor and Supplier were informed of our field test results. Time Cylinders Cast: 1 :44 pm Initial Cure Time On Site: 3 days Field Storage: Insulated Cure Box Date in Lab: 06-02-14 Cylinder Temperature at Pick Up: 55° Min/Max: 54°/74° Compressive Strength Data 2014 Compressive 28 Day Lab Age Date Load Diameter Area Strength (psi) Number Days lbs. in. in2 Avg. (psi) 338A 7 06-06-14 28,800 4.01 12.63 2280 338B 28 06-27-14 48,400 4.01 12.63 3830 338C 28 06-27-14 46,000 4.01 12.63 3640 3740 3380 Hold/56 Discarded Specified Strength for Structure: 3000 psi at 28 days Specified Strength for Mix: 3000 psi at 28 days Notes: Distribution: Nedbo Construction -Nate Brandenburg (nate@nedbo.com) United -Rick Seymour (rseymour@united-gj.com) Justin Orgill Field Technician /ljg Thomas J. Westhoff, CET Reviewed By