HomeMy WebLinkAboutA4-02 - FLOOR FINISHES.pdfTILE
F1 T
TILE
F1 T
CERAMIC TILE
F1 CT
WOOD PLANK
F1 WP
WOOD PLANK
F1 WP
WOOD PLANK
F1 WP
CERAMIC TILE
TBD
WOOD PLANK
FLOORING
FLOOR FINISH LEGEND
TILE
FLOOR AND CEILING WITH
EXISTING STRUCTURE
NEW 5/8" TYPE "X" GYPSUM
BOARD AT CEILING TO
REPLACE EXISTING.
F.F. TO F.C.
FLOOR TO CEILING
NEW WOOD FLOORING
OR TILE, TYP.
EXISTING HOLLOW
CORE CONCRETE SLAB
EXISTING HOLLOW
CORE CONCRETE SLAB
NOTE: NEW FLOORING AND
CEILING ASSEMBLY DO NOT
DECREASE FIRE RATING AS WE
ARE NOT INTRODUCING ANY
NEW ASSEMBLIES.
6"6"
PLAN NORTH
TRUE
NORTH
1650 Fallridge Road, Suite C-1
Vail, Colorado 81657
f.(970) 476-4901 p.(970)476-6342
103 WILLOW PLACE
VAIL, CO 81657
A4.02
FLOOR
FINISHES
EDELWEISS - UNIT 301
Project Number - 1402
05/23/14
PERMIT SET
1/2" = 1'-0" 1
Copy (3) of EDELWEISS 301 - OPTION 1
1/2" = 1'-0"
FLOOR AND CEILING ASSEMBLIES
06/10/14