Loading...
HomeMy WebLinkAboutA4-02 - FLOOR FINISHES.pdfTILE F1 T TILE F1 T CERAMIC TILE F1 CT WOOD PLANK F1 WP WOOD PLANK F1 WP WOOD PLANK F1 WP CERAMIC TILE TBD WOOD PLANK FLOORING FLOOR FINISH LEGEND TILE FLOOR AND CEILING WITH EXISTING STRUCTURE NEW 5/8" TYPE "X" GYPSUM BOARD AT CEILING TO REPLACE EXISTING. F.F. TO F.C. FLOOR TO CEILING NEW WOOD FLOORING OR TILE, TYP. EXISTING HOLLOW CORE CONCRETE SLAB EXISTING HOLLOW CORE CONCRETE SLAB NOTE: NEW FLOORING AND CEILING ASSEMBLY DO NOT DECREASE FIRE RATING AS WE ARE NOT INTRODUCING ANY NEW ASSEMBLIES. 6"6" PLAN NORTH TRUE NORTH 1650 Fallridge Road, Suite C-1 Vail, Colorado 81657 f.(970) 476-4901 p.(970)476-6342 103 WILLOW PLACE VAIL, CO 81657 A4.02 FLOOR FINISHES EDELWEISS - UNIT 301 Project Number - 1402 05/23/14 PERMIT SET 1/2" = 1'-0" 1 Copy (3) of EDELWEISS 301 - OPTION 1 1/2" = 1'-0" FLOOR AND CEILING ASSEMBLIES 06/10/14