HomeMy WebLinkAbout531 E Lionshead Cr. project outline.pdf - i—. t.
1.19 iUg9'rC SFi
)E413611.65' s u1 '-1�i P1Eur,lwlu iu6uu6.ECIWAJ2 LC L L etYdoeyu wwyJn ui
auwebl:sd4y
Lionshead Arcade unit 307 hall bathroom renovation
Fixtures:
Kohler Cimarron pedestal sink: $190
Moen faucet: $99
Kohler Barrington Toilet $709
Ceramic floor tile: $76
Plumber:
Estimate: $950
- Install commode, including any necessary modification to existing plumbing
- Lower p trap and installation of pedestal sink
Scope of work:
Removal of existing vanity, commode, flooring and replacement of new floor tile to be performed
by homeowner_ All walls, doors, shower, and electrical to remain as they currently exist_
Licensed plumber is to do installation of sink and commode as well as any necessary
modification of existing plumbing.
•
Total estimate of project: $2,024.00
Please contact me with any questions you may have regarding this project
Respectfully, Julieanne Zenz
(630)673-8300
Va JE J 'MI'Uuorl,RMV H 1U .Jd-9UOZ 1Ubii 4doo p]