Loading...
HomeMy WebLinkAboutB14-0172 A2.02.pdf4 5 6 7 8 H 4 5 6 7 8 H DRAIN RELOCATED LIGHT BEGA, MODEL: 2534 P FINISH: BLACK 6'-5 3/4" AFF TO CENTERLINE LIGHT BEGA, MODEL: 2534 P FINISH: BLACK 6'-5 3/4" AFF TO CENTERLINE LIGHT BEGA, MODEL: 2288 P FINISH: SILVER IN WALL NEW STONE STAIR TREADS W/ SNOWMELT SPA GLASS GUARD SYSTEM. WAGNER PANEL GRIP DRY- GLAZE SYSTEM OR EQUAL, MEETING IBC 2407.1.4.2 4' - 6 3/4" 6' - 5 1/4" 3 EQ. 3/4" TEMPERED GLASS GUARD PANELS 11' - 0" 5' - 8 1/16" UP 3 RISERS @ 7 1/2" UP 8 RISERS @7 1/2" UP 1 RISER @ 7 1/2" NEW STONE LANDINGS W/ SNOWMELT SYSTEM NEW STONE FLOOR ASSEMBLY TO MATCH STONE STAIRS EQ EQ NEW DRIP-THROUGH IPE WOOD DECK ASSEMBLY NEW METAL GRATE 2' - 0" 12' - 0 3/8" ALIGN FINISHED FLOOR SURFACES GLASS GUARD SYSTEM. WAGNER PANEL GRIP DRY- GLAZE SYSTEM OR EQUAL, MEETING IBC 2407.1.4.2 RAILING GLASS GUARD SYSTEM. WAGNER PANEL GRIP DRY- GLAZE SYSTEM OR EQUAL, MEETING IBC 2407.1.4.2 3' - 4" 3 15/16" 1 1/2" 3' - 0" 1' - 9 1/4" 3' - 0" 1 1/2" 1 A3.02 2 A3.02 1 A5.01 9 A5.01 2 A5.01 5 A5.01 SCOTT MICHAEL NEVIN 202985 S T A T E O F C O L O R A D O L IC E N S E D A R C H I T E C T DPA Project: Sheet Number: COPYRIGHT 2011 - DAVIS PARTNERSHIP, P.C. Sheet Title: 2301 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 0225 Main Street, Unit C101 Edwards, CO 81632 970.926.8960 Denver Vail Consultant Issue/Revisions Date No. Sheet Information Project Information TOWN OF VAIL APPROVAL 4/23/2014 10:43:25 AM 06232.00.310 A2.02 SOLARIS - UNIT 701 EXPANSION DECK 141 EAST MEADOW DRIVE VAIL, COLORADO 81657 LEVEL 9 - FLOOR PLAN PERMIT SET 01APR2014 3/4" = 1'-0" 1 LEVEL 9 PROPOSED FLOOR PLAN 4/1/2014 11/12/14