Loading...
HomeMy WebLinkAboutD2.01.pdfDN 4 5 6 7 8 G H DEMOLISH EXISTING STAIR AND STRINGERS, PATCH AND REPAIR FLOOR AND WALLS AS NECESSARY. SAVE SNOWMELT AND STONE TREADS FOR REUSE ON NEW STAIR UP REMOVE LIGHT FOR REUSE. MOVE J-BOX TO NEW LOCATION, PATCH AND REPAIR WALL FINISH. 4 5 6 7 8 G H DN CLOSET 701.53 REMOVE LIGHT FOR REUSE. MOVE J-BOX TO NEW LOCATION, PATCH AND REPAIR WALL FINISH. EXISTING DECK EXISTING SPA EQUIPMENT ROOM DEMOLISH FLOOR AND SNOW MELT AS REQUIRED FOR NEW STAIR DEMOLISH FLOOR AND SNOW MELT AS REQUIRED FOR THE NEW STORAGE ROOM SCOTT MICHAEL NEVIN 202985 S T A T E O F C O L O R A D O L IC E N S E D A R C H I T E C T DPA Project: Sheet Number: COPYRIGHT 2011 - DAVIS PARTNERSHIP, P.C. Sheet Title: 2301 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 0225 Main Street, Unit C101 Edwards, CO 81632 970.926.8960 Denver Vail Consultant Issue/Revisions Date No. Sheet Information Project Information TOWN OF VAIL APPROVAL 4/23/2014 10:43:37 AM 06232.00.310 D2.01 SOLARIS - UNIT 701 EXPANSION DECK 141 EAST MEADOW DRIVE VAIL, COLORADO 81657 LEVEL 8 - DEMOLITION PLAN PERMIT SET 01APR2014 3/4" = 1'-0" 1 LEVEL 8 - DEMOLITION PLAN 4/1/2014 11/12/14