Loading...
HomeMy WebLinkAboutBegin_Workflow-06-11-2014_15-16-25.pdfClick Here to Save Eform as PDF... Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip Review Coordinator Shelley Bellm  ( sbellm@vailgov.com ) Review Cycle 4 Workflow/Activity Name Begin_Workflow / DepartmentReview  Activity InstructionsUpon acceptance of task, please review the required drawings and provide any applicable  comments and status. Current User Logon Shelley Bellm ( sbellm@vailgov.com)  CHANGEMARKS ­ Review Cycle:3 Filter Changemarks by Keyword:  SEARCH    SHOW ALL Click Here to Load Changemarks... Click Here to Publish Changemarks to PDF... Sorting: Resolved Status File Cycle Department File Markup Description Details Applicant Response Yes | No No 3 Planning A6.32 Lot 3.pdf jbatcheller P001 Note the gague of metal roof. 24 gauge is the minimum allowed per the DRB approval, 05/07/2014. Yes | No No 3 Planning A6.32 Lot 3.pdf jbatcheller P002 Note the gague of metal roof. 24 gauge is the minimum allowed per the DRB approval, 05/07/2014. Yes | No No 3 Planning A6.32 Lot 3.pdf jbatcheller P003 Note the gague of metal roof. 24 gauge is the minimum allowed per the DRB approval, 05/07/2014. Yes | No No 3 Planning A2.33 Lot 3.pdf jbatcheller P001 Note the gague of metal roof. 24 gauge is the minimum allowed per the DRB approval, 05/07/2014. Yes | No No 3 Planning A2.33 Lot 3.pdf jbatcheller P002 Note the gague of metal roof. 24 gauge is the minimum allowed per the DRB approval, 05/07/2014. Show My Changemarks Note the gague of metal roof on pages A2.33 and A6.32. 24 gauge  is the minimum allowed per the DRB approval, 05/07/2014. Approved, See Condition on Drainage Maintenance DEPARTMENT REVIEW ­ Review Cycle:3   CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES 3 PLANNING JOE BATCHELLER  JBATCHELLER@VAILGOV.COM Corrections Required VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE Complete Review  Request Additional Group  Save & Close   Building Process V1 3 PUBLIC WORKS TOM KASSMEL  TKASSMEL@VAILGOV.COM Approved VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 3 FIRE MIKE VAUGHAN  MVAUGHAN@VAILGOV.COM Approved VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 3 BUILDING FLORENCIO MONDRAGON  JMONDRAGON@VAILGOV.COM Approved VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE Requested Groups 0 Groups Selected Remove all Add all Chief of Planning Chief of Building Fire Marshal Wildland Fire