Loading...
HomeMy WebLinkAboutBegin_Workflow - Review Comments - 06-11-2014_09-11-12.pdfBegin_Workflow ­ Review Comments ­ 06­11­2014_09­11­12 Review Cycle Department Markup Snapshot 1 Building File: A1.1 Site Plan.pdf ChangeMark: mhaeberle Description: B001 Comment: Back water valve for fixtures below rim of upstream manhole only. Please identify fixture to be on backwater valve in odere to determine seperation of gravity drained fixtures..  1 Planning File: A1.2 Landscape Plan.pdf ChangeMark: Planning Description: P001 Comment: On the plans submitted in conjunction with the building permit the applicant shall amend the landscaping plan to include a total of 12 aspens (6 each on bioth the west and east sides of the driveway) between the street and the front of the home. Reflect this change on all sheets showing landscaping. 1 Planning File: A1.9 Radon Reduction System.pdf ChangeMark: Planning Description: P001 Comment: Paint to match exterior facade material color prior to requesting a final planning inspection 1 Public Works File: A1.1 Site Plan.pdf ChangeMark: csalli Description: PW 001 Comment: Provide spot elevations at the edge of asphalt on Garmisch and the back of 4' pan 1 Public Works File: A1.1 Site Plan.pdf ChangeMark: csalli Description: PW 002 Comment: proposed boulder walls shall not exceed 3' in height without structural desgin from a professional engineer 1 Public Works File: A1.1 Site Plan.pdf ChangeMark: csalli Description: PW 004 Comment: an erosion/sediment control plan and construction stagin plan shall be submitted prior to issuance of building permit 1 Public Works File: A1.2 Landscape Plan.pdf ChangeMark: csalli Description: PW 003 Comment: removed proposed trees from utlity easements