Loading...
HomeMy WebLinkAboutBegin_Workflow-06-11-2014_09-07-38.pdfClick Here to Save Eform as PDF... Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip Review Coordinator Carolyn Godfrey  ( cgodfrey@vailgov.com ) Review Cycle 1 Workflow/Activity Name Begin_Workflow / DepartmentReview  Activity InstructionsUpon acceptance of task, please review the required drawings and provide any applicable  comments and status. Current User Logon Martin Haeberle ( mhaeberle@vailgov.com)  CHANGEMARKS ­ Review Cycle:1 Filter Changemarks by Keyword:  SEARCH    SHOW ALL Click Here to Load Changemarks... Click Here to Publish Changemarks to PDF... Sorting: Resolved Status File Cycle Department File Markup Description Details Applicant Response Yes | No No 1 Building A1.1 Site Plan.pdf mhaeberle B001 Back water valve for fixtures below rim of upstream manhole only. Please identify fixture to be on backwater valve in odere to determine seperation of gravity drained fixtures.. Yes | No No 1 Planning A1.2 Landscape Plan.pdf Planning P001 On the plans submitted in conjunction with the building permit the applicant shall amend the landscaping plan to include a total of 12 aspens (6 each on bioth the west and east sides of the driveway) between the street and the front of the home. Reflect this change on all sheets showing landscaping. Yes | No No 1 Planning A1.9 Radon Reduction System.pdf Planning P001 Paint to match exterior facade material color prior to requesting a final planning inspection Yes | No No 1 Public Works A1.2 Landscape Plan.pdf csalli PW 003 removed proposed trees from utlity easements Yes | No No 1 Public Works A1.1 Site Plan.pdf csalli PW 001 Provide spot elevations at the edge of asphalt on Garmisch and the back of 4' pan Yes | No No 1 Public Works A1.1 Site Plan.pdf csalli PW 002 proposed boulder walls shall not exceed 3' in height without structural desgin from a professional engineer Yes | No No 1 Public Works A1.1 Site Plan.pdf csalli PW 004 an erosion/sediment control plan and construction stagin plan shall be submitted prior to issuance of building permit Show My Changemarks DEPARTMENT REVIEW ­ Review Cycle:1   CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES Complete Review  Request Additional Group  Save & Close   Building Process V1 1 PLANNING WARREN CAMPBELL  WCAMPBELL@VAILGOV.COM Corrections Required VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 1 PUBLIC WORKS CHAD SALLI  CSALLI@VAILGOV.COM Corrections Required VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 1 FIRE MIKE VAUGHAN  MVAUGHAN@VAILGOV.COM InReview VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 1 BUILDING MARTIN HAEBERLE  MHAEBERLE@VAILGOV.COM InReview VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE Requested Groups 0 Groups Selected Remove all Add all Chief of Planning Chief of Building Fire Marshal Wildland Fire