HomeMy WebLinkAboutBegin_Workflow-06-11-2014_09-07-38.pdfClick Here to Save Eform as PDF...
Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip
Review Coordinator Carolyn Godfrey ( cgodfrey@vailgov.com )
Review Cycle 1
Workflow/Activity Name Begin_Workflow / DepartmentReview
Activity InstructionsUpon acceptance of task, please review the required drawings and provide any applicable
comments and status.
Current User Logon Martin Haeberle ( mhaeberle@vailgov.com)
CHANGEMARKS Review Cycle:1
Filter Changemarks by Keyword: SEARCH SHOW ALL
Click Here to Load Changemarks...
Click Here to Publish Changemarks to PDF...
Sorting:
Resolved Status File Cycle Department File Markup Description Details Applicant Response
Yes | No No 1 Building A1.1 Site
Plan.pdf mhaeberle B001
Back water valve for fixtures below rim of upstream
manhole only. Please identify fixture to be on
backwater valve in odere to determine seperation of
gravity drained fixtures..
Yes | No No 1 Planning
A1.2
Landscape
Plan.pdf
Planning P001
On the plans submitted in conjunction with the
building permit the applicant shall amend the
landscaping plan to include a total of 12 aspens (6
each on bioth the west and east sides of the
driveway) between the street and the front of the
home. Reflect this change on all sheets showing
landscaping.
Yes | No No 1 Planning
A1.9
Radon
Reduction
System.pdf
Planning P001 Paint to match exterior facade material color prior to
requesting a final planning inspection
Yes | No No 1 Public
Works
A1.2
Landscape
Plan.pdf
csalli PW 003 removed proposed trees from utlity easements
Yes | No No 1 Public
Works
A1.1 Site
Plan.pdf csalli PW 001 Provide spot elevations at the edge of asphalt on
Garmisch and the back of 4' pan
Yes | No No 1 Public
Works
A1.1 Site
Plan.pdf csalli PW 002
proposed boulder walls shall not exceed 3' in height
without structural desgin from a professional
engineer
Yes | No No 1 Public
Works
A1.1 Site
Plan.pdf csalli PW 004
an erosion/sediment control plan and construction
stagin plan shall be submitted prior to issuance of
building permit
Show My Changemarks
DEPARTMENT REVIEW Review Cycle:1
CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES
Complete Review Request Additional Group Save & Close
Building Process V1
1 PLANNING
WARREN CAMPBELL
WCAMPBELL@VAILGOV.COM
Corrections Required
VIEW CHECKLIST
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
1 PUBLIC WORKS
CHAD SALLI
CSALLI@VAILGOV.COM
Corrections Required
VIEW CHECKLIST
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
1 FIRE
MIKE VAUGHAN
MVAUGHAN@VAILGOV.COM
InReview
VIEW CHECKLIST
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
1 BUILDING MARTIN HAEBERLE
MHAEBERLE@VAILGOV.COM
InReview
VIEW CHECKLIST
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
Requested Groups
0 Groups Selected Remove all Add all
Chief of Planning
Chief of Building
Fire Marshal
Wildland Fire