Loading...
HomeMy WebLinkAboutBegin_Workflow-06-16-2014_16-51-20.pdfClick Here to Save Eform as PDF... Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip Review Coordinator Carolyn Godfrey  ( cgodfrey@vailgov.com ) Review Cycle 1 Workflow/Activity Name Begin_Workflow / ApplicantResubmit  Activity InstructionsPlease review all sections of the eForm and drawing markups and resubmit the required  information prior to completion of task. Current User Logon Coleman Wise ( coleman@arrigoniwoods.com)  CHANGEMARKS ­ Review Cycle:1 Filter Changemarks by Keyword:  SEARCH    SHOW ALL Click Here to Load Changemarks... Click Here to Publish Changemarks to PDF... Sorting: Resolved Status File Cycle Department File Markup Description Details Applicant Response Yes | No No 1 Building A2.1 Lower Level Floor Plan.pdf mhaeberle B001 Gas appliance? please clarify for purposes of determining allowable fireplaces in the home . Typical Yes | No No 1 Building A2.1 Lower Level Floor Plan.pdf mhaeberle B002 Specify R Values Typical Yes | No No 1 Building A5.2 Wall Sections & Details.pdf mhaeberle B001 See previous comments on insulation criteria Yes | No No 1 Building A5.3 Details.pdf mhaeberle B001 How is this going to positvely drain? Structural to include ponding if to remain Yes | No No 1 Building A5.3 Details.pdf mhaeberle B002 How is this to be couner flash to prevent water migration? Yes | No No 1 Building A8.0 Door­ Window Schedules.pdf mhaeberle B001 As ammended by the town the maximum is .30. Revise plans to show code compliance Yes | No No 1 Building A2.1 Lower Level Floor Plan.pdf mhaeberle B003 Show code compliance for egress Yes | No No 1 Building A2.2 Main Level Floor Plan.pdf mhaeberle B001 Show compliance for safety glazing. Typical Yes | No No 1 Building A2.2 Main Level Floor Plan.pdf mhaeberle B002 Show cfm of hood to determine ventilation criteria Yes | No No 1 Building A2.3 Upper Level Floor Plan.pdf mhaeberle B001 Identify proposed ceiling hieght Yes | No No 1 Building A2.3 Upper Level Floor Plan.pdf mhaeberle B002 Safety Glazing? Please clarify Yes | No No 1 Building A3.0 Exterior Elevations.pdf mhaeberle B001 Required to be less than. Revise plans to reflect code compliance Yes | No No 1 Building A3.0 Exterior Elevations.pdf mhaeberle B002 Annotate a class A roof system to be used Yes | No No 1 Building A5.1 Wall Sections & Details.pdf mhaeberle B001 Revise to show insulation requiremnts for slab on grade Yes | No No 1 Building A5.1 Wall Sections & Details.pdf mhaeberle B002 Provide insulation for areas in conditioned space per IECC Yes | No No 1 Building A5.1 Wall Sections & Details.pdf mhaeberle B002 Show compliance for insulation per IECC Yes | No No 1 Building A1.1 Site Plan.pdf mhaeberle B001 Back water valve for fixtures below rim of upstream manhole only. Please identify fixture to be on backwater valve in odere to determine seperation of gravity drained fixtures.. Yes | No No 1 Building A1.1 Site Plan.pdf mhaeberle B002 Show foundation drain location and termination point Yes | No No 1 Building A8.0 Door­ Window Schedules.pdf mhaeberle B003 Show required windows and doors to recieve safety glazing Yes | No No 1 Building A1.0 Cover Sheet.pdf mhaeberle B001 Provide electricla load calculations with panel board sizing Yes | No No 1 Building A1.0 Cover Sheet.pdf mhaeberle B002 Provide gas piping plans to include one line for sizing, materials, loads, and locations Yes | No No 1 Building A1.0 Cover Sheet.pdf mhaeberle B003 Provide complete structural plans and engineer responsible for design Yes | No No 1 Building A8.0 Door­ Window Schedules.pdf mhaeberle B002 Provide u values for each door and window showing compliance with weighted average. Include calculation Yes | No No 1 Fire A1.0 Cover Sheet.pdf sprinkler system required Fire comment Sprinkler and monitored fire alarm system required Yes | No No 1 Planning A1.2 Landscape Plan.pdf Planning P001 On the plans submitted in conjunction with the building permit the applicant shall amend the landscaping plan to include a total of 12 aspens (6 each on bioth the west and east sides of the driveway) between the street and the front of the home. Reflect this change on all sheets showing landscaping. Yes | No No 1 Planning A1.9 Radon Reduction System.pdf Planning P001 Paint to match exterior facade material color prior to requesting a final planning inspection Yes | No No 1 Public Works A1.2 Landscape Plan.pdf csalli PW 003 removed proposed trees from utlity easements Yes | No No 1 Public Works A1.1 Site Plan.pdf csalli PW 001 Provide spot elevations at the edge of asphalt on Garmisch and the back of 4' pan Yes | No No 1 Public Works A1.1 Site Plan.pdf csalli PW 002 proposed boulder walls shall not exceed 3' in height without structural desgin from a professional engineer Yes | No No 1 Public Works A1.1 Site Plan.pdf csalli PW 004 an erosion/sediment control plan and construction stagin plan shall be submitted prior to issuance of building permit show intent to sprinkler DEPARTMENT REVIEW ­ Review Cycle:1   CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES 1 BUILDING FLORENCIO MONDRAGON  JMONDRAGON@VAILGOV.COM CORRECTIONS REQUIRED VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 1 FIRE MIKE VAUGHAN  MVAUGHAN@VAILGOV.COM CORRECTIONS REQUIRED PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 1 PLANNING WARREN CAMPBELL  WCAMPBELL@VAILGOV.COM CORRECTIONS REQUIRED VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 1 PUBLIC WORKS CHAD SALLI  CSALLI@VAILGOV.COM CORRECTIONS REQUIRED PLAN REVIEW AND/OR ASSIGNMENT COMPLETE I have reviewed and addressed the Checklist Comments provided on the "Checklist" tab above. Please click on the tab and review each item. Each comment will be Task Instructions Complete  Save And Close   Building Process V1 indicated as "Met" or "Not Met". If you would like to export a list of the comments to Excel, click on the "Export to Excel" link in the upper right hand corner of the popup window. I have addressed all of the items listed in the Changemarks section above that were identified during the Plan Review. I have uploaded the revised drawings into the "Drawings" folder and, if requested, uploaded any revised documents into the "Documents" folder using the SAME file name as the original files. I am ready to complete my assigned task.