Review Coordinator Carolyn Godfrey ( cgodfrey@vailgov.com )
Review Cycle 1
Workflow/Activity Name Begin_Workflow / ApplicantResubmit
Activity InstructionsPlease review all sections of the eForm and drawing markups and resubmit the required
information prior to completion of task.
Current User Logon Coleman Wise ( coleman@arrigoniwoods.com)
CHANGEMARKS Review Cycle:1
Filter Changemarks by Keyword: SEARCH SHOW ALL
Click Here to Load Changemarks...
Click Here to Publish Changemarks to PDF...
Sorting:
Resolved Status File Cycle Department File Markup Description Details Applicant Response
Yes | No No 1 Building
A2.1 Lower
Level Floor
Plan.pdf
mhaeberle B001
Gas appliance? please clarify for purposes of
determining allowable fireplaces in the home .
Typical
Yes | No No 1 Building
A2.1 Lower
Level Floor
Plan.pdf
mhaeberle B002 Specify R Values Typical
Yes | No No 1 Building
A5.2 Wall
Sections &
Details.pdf
mhaeberle B001 See previous comments on insulation criteria
Yes | No No 1 Building A5.3
Details.pdf mhaeberle B001 How is this going to positvely drain? Structural to
include ponding if to remain
Yes | No No 1 Building A5.3
Details.pdf mhaeberle B002 How is this to be couner flash to prevent water
migration?
Yes | No No 1 Building
A8.0 Door
Window
Schedules.pdf
mhaeberle B001 As ammended by the town the maximum is .30.
Revise plans to show code compliance
Yes | No No 1 Building
A2.1 Lower
Level Floor
Plan.pdf
mhaeberle B003 Show code compliance for egress
Yes | No No 1 Building
A2.2 Main
Level Floor
Plan.pdf
mhaeberle B001 Show compliance for safety glazing. Typical
Yes | No No 1 Building
A2.2 Main
Level Floor
Plan.pdf
mhaeberle B002 Show cfm of hood to determine ventilation criteria
Yes | No No 1 Building
A2.3 Upper
Level Floor
Plan.pdf
mhaeberle B001 Identify proposed ceiling hieght
Yes | No No 1 Building
A2.3 Upper
Level Floor
Plan.pdf
mhaeberle B002 Safety Glazing? Please clarify
Yes | No No 1 Building A3.0 Exterior
Elevations.pdf mhaeberle B001 Required to be less than. Revise plans to reflect
code compliance
Yes | No No 1 Building A3.0 Exterior
Elevations.pdf mhaeberle B002 Annotate a class A roof system to be used
Yes | No No 1 Building
A5.1 Wall
Sections &
Details.pdf
mhaeberle B001 Revise to show insulation requiremnts for slab on
grade
Yes | No No 1 Building
A5.1 Wall
Sections &
Details.pdf
mhaeberle B002 Provide insulation for areas in conditioned space per
IECC
Yes | No No 1 Building
A5.1 Wall
Sections &
Details.pdf
mhaeberle B002 Show compliance for insulation per IECC
Yes | No No 1 Building A1.1 Site
Plan.pdf mhaeberle B001
Back water valve for fixtures below rim of upstream
manhole only. Please identify fixture to be on
backwater valve in odere to determine seperation of
gravity drained fixtures..
Yes | No No 1 Building A1.1 Site
Plan.pdf mhaeberle B002 Show foundation drain location and termination
point
Yes | No No 1 Building
A8.0 Door
Window
Schedules.pdf
mhaeberle B003 Show required windows and doors to recieve safety
glazing
Yes | No No 1 Building A1.0 Cover
Sheet.pdf mhaeberle B001 Provide electricla load calculations with panel board
sizing
Yes | No No 1 Building A1.0 Cover
Sheet.pdf mhaeberle B002 Provide gas piping plans to include one line for
sizing, materials, loads, and locations
Yes | No No 1 Building A1.0 Cover
Sheet.pdf mhaeberle B003 Provide complete structural plans and engineer
responsible for design
Yes | No No 1 Building
A8.0 Door
Window
Schedules.pdf
mhaeberle B002
Provide u values for each door and window showing
compliance with weighted average. Include
calculation
Yes | No No 1 Fire A1.0 Cover
Sheet.pdf
sprinkler
system
required
Fire
comment Sprinkler and monitored fire alarm system required
Yes | No No 1 Planning
A1.2
Landscape
Plan.pdf
Planning P001
On the plans submitted in conjunction with the
building permit the applicant shall amend the
landscaping plan to include a total of 12 aspens (6
each on bioth the west and east sides of the
driveway) between the street and the front of the
home. Reflect this change on all sheets showing
landscaping.
Yes | No No 1 Planning
A1.9 Radon
Reduction
System.pdf
Planning P001 Paint to match exterior facade material color prior to
requesting a final planning inspection
Yes | No No 1 Public
Works
A1.2
Landscape
Plan.pdf
csalli PW 003 removed proposed trees from utlity easements
Yes | No No 1 Public
Works
A1.1 Site
Plan.pdf csalli PW 001 Provide spot elevations at the edge of asphalt on
Garmisch and the back of 4' pan
Yes | No No 1 Public
Works
A1.1 Site
Plan.pdf csalli PW 002
proposed boulder walls shall not exceed 3' in height
without structural desgin from a professional
engineer
Yes | No No 1 Public
Works
A1.1 Site
Plan.pdf csalli PW 004
an erosion/sediment control plan and construction
stagin plan shall be submitted prior to issuance of
building permit
show intent to sprinkler
DEPARTMENT REVIEW Review Cycle:1
CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES
1 BUILDING
FLORENCIO MONDRAGON
JMONDRAGON@VAILGOV.COM
CORRECTIONS REQUIRED
VIEW CHECKLIST
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
1 FIRE
MIKE VAUGHAN
MVAUGHAN@VAILGOV.COM
CORRECTIONS REQUIRED
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
1 PLANNING
WARREN CAMPBELL
WCAMPBELL@VAILGOV.COM
CORRECTIONS REQUIRED
VIEW CHECKLIST
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
1 PUBLIC WORKS CHAD SALLI
CSALLI@VAILGOV.COM
CORRECTIONS REQUIRED
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
I have reviewed and addressed the Checklist Comments provided on the "Checklist" tab above. Please click on the tab and review each item. Each comment will be
Task Instructions
Complete Save And Close
Building Process V1
indicated as "Met" or "Not Met". If you would like to export a list of the comments to Excel, click on the "Export to Excel" link in the upper right hand corner of the popup
window.
I have addressed all of the items listed in the Changemarks section above that were identified during the Plan Review.
I have uploaded the revised drawings into the "Drawings" folder and, if requested, uploaded any revised documents into the "Documents" folder using the SAME file name as
the original files. I am ready to complete my assigned task.