Loading...
HomeMy WebLinkAboutLeft Bank Com Check 053014.pdf IrrillCOMcheck Software Version 3.9.3 � � Interior Lighting and Power , + fa t`'`�,�; ti. Compliance Certificate _ I, : 7; 2012 IECC —30-14/: Section 1: Project Information = ,"'••. • Project Type: New Construction Project Title : Left Bank Restaurant Construction Site: Owner/Agent: Designer/Contractor: 183 Gore Creek Drive AE Design Group Vail,CO 81657 1900 Wazee Street Suite#350 Denver,CO 80305 Additional Efficiency Package: High efficiency HVAC.Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist report. Section 2: Interior Lighting and Power Calculation A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B x C) Entry(Common Space Types:Lobby) 44 1.1 48 Bar/Lounge(Common Space Types:Bar/lounge/leisure dining) 664 1.4 930 Dining Room(Common Space Types:Family dining area) 1279 1.4 1791 Total Allowed Watts= 2769 Section 3: Interior Lighting Fixture Schedule A B C D E Fixture ID :Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Entry(Common Space Types:Lobby 44 sq.ft.) Incandescent 1:34120:Other: 1 1 480 480 Incandescent 2:596CW-7-7:Incandescent 50W: 1 2 50 100 Bar/Lounge(Common Space Types:Bar/lounge/leisure dining 664 sq.ft.) Incandescent 3:2911 D2OC:Incandescent 40W: 1 6 40 240 Incandescent 4:25811: Incandescent 40W: 1 7 40 280 Dining Room(Common Space Types:Family dining area 1279 sq.ft.) Incandescent 10:81821:Incandescent 40W: 1 14 40 560 Incandescent 11:34120:Other: 1 2 480 960 Total Proposed Watts= 2620 Interior Lighting PASSES:Design 5%better than code. Section 4: Compliance Statement Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed Ighting system as been designed to meet the 2012 IECC requirements in COMcheck Version 3.9.3 and to comply with the mandatory requirement n th• ' quirements Checklist. Jeff Mullikin - Principal �� 5/30/14 Name Title , Date Section 5: Post Construction Compliance Statement Project Title: Left Bank Restaurant Report date: 05/30/14 Data filename:J:\2727.00- Left Bank Energy Compliance\Ltg Calcs\272700EC01_Rev2.cck Page 1 of 2 Record Drawings and Operating and Maintenance Manuals: 1. Construction documents with record drawings and operating and maintenance manuals provided to the owner. Lighting Designer or Contractor Name Signature Date Project Title: Left Bank Restaurant Report date: 05/30/14 Data filename:J:\2727.00- Left Bank Energy Compliance\Ltg Calcs\272700EC01_Rev2.cck Page 2 of 2 irdl COMcheck Software Version 3.9.3 Inspection Checklist Energy Code: 2012 IECC Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Left Bank Restaurant Report date: 05/30/1 Data J:\2727.00 - Left Bank Energy Compliance\Ltg Calcs\272700EC01_Rev2.cck Page 1 of 5 2012 IECC Plan Review Complies? Comments/Assumptions C103.2 :Plans, specifications, and/or ❑Complies [PR4]1 calculations provide all information ❑Does Not ;with which compliance can be determined for the interior lighting ['Not Observable and electrical systems and equipment ❑Not Applicable :and document where exceptions to ;the standard are claimed. Information provided should include interior lighting power calculations, wattage of :bulbs and ballasts,transformers and control devices. C406 :Plans, specifications, and/or ❑Complies [PR9]1 calculations provide all information ❑Does Not ;with which compliance can be determined for the additional energy ❑Not Observable efficiency package options. ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Left Bank Restaurant Report date: 05/30/1 Data J:\2727.00 - Left Bank Energy Compliance\Ltg Calcs\272700EC01_Rev2.cck Page 2 of 5 2012 IECC Rough-In Electrical Inspection Complies? Comments/Assumptions 'C405.2.2. ;Automatic controls to shut off all ❑Complies 1 building lighting installed in all ❑Does Not [EL22]z ;buildings. ❑Not Observable ❑Not Applicable C405.2.1. Independent lighting controls installed ❑Complies 1 per approved lighting plans and all ❑Does Not [EL23]z ;manual controls readily accessible and ;visible to occupants. ❑Not Observable ❑Not Applicable C405.2.1. :Lighting controls installed to uniformly EComplies 2 :reduce the lighting load by at least ❑Does Not [EL15]1 50%. ❑Not Observable ❑Not Applicable C405.2.2. :Daylight zones provided with EComplies 3 individual controls that control the EDoes Not [EL16]2 lights independent of general area ;lighting. ENot Observable ❑Not Applicable C405.2.3 ;Sleeping units have at least one EComplies [EL17]3 :master switch at the main entry door ❑Does Not ;that controls wired luminaires and ;switched receptacles. ❑Not Observable '❑Not Applicable C405.2.2. ;Occupancy sensors installed in ❑Complies 2required spaces. ❑Does Not [EL18]1 ❑Not Observable ❑Not Applicable C405.2.2. :Primary sidelighted areas are ❑Complies 3 equipped with required lighting ❑Does Not [EL20]1 ;controls. ❑Not Observable ❑Not Applicable C405.2.2. :Enclosed spaces with daylight area ❑Complies 3 :under skylights and rooftop monitors ❑Does Not [EL21]1 ;are equipped with required lighting ;controls. [Not Observable ❑Not Applicable C405.2.3 ;Separate lighting control devices for ❑Complies [EL4]1 :specific uses installed per approved ❑Does Not ;lighting plans. ❑Not Observable ❑Not Applicable C405.3 :Fluorescent luminaires with odd EComplies [EL19]3 numbered lamp configurations that ❑Does Not ;are with 10 feet center to center(if recess mounted)or are within 1 foot ❑Not Observable sedge to edge(if pendant or surface ❑Not Applicable mounted) shall be tandem wired. _ C405.4 ;Exit signs do not exceed 5 watts per ❑Complies [EL6]1 :face. ❑Does Not ❑Not Observable ❑Not Applicable C405.2.3 ;Additional interior lighting power ❑Complies [EL8]1 allowed for special functions per the ❑Does Not ;approved lighting plans and is ;automatically controlled and ❑Not Observable separated from general lighting. ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Left Bank Restaurant Report date: 05/30/1 Data J:\2727.00 - Left Bank Energy Compliance\Ltg Calcs\272700EC01_Rev2.cck Page 3 of 5 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Left Bank Restaurant Report date: 05/30/1 Data J:\2727.00 - Left Bank Energy Compliance\Ltg Calcs\272700EC01_Rev2.cck Page 4 of 5 2012 IECC Final Inspection Complies? Comments/Assumptions C408.2.5. :Furnished as-built drawings for ❑Complies 1 electric power systems within 30 days ❑Does Not [F116]3 of system acceptance. ['Not Observable ❑Not Applicable C303.3,C4:Furnished O&M instructions for ❑Complies 08.2.5.2 systems and equipment to the ❑Does Not [F117]3 ;building owner or designated ;representative. ❑Not Observable ❑Not Applicable C405.5.2 :Interior installed lamp and fixture ❑Complies ,See the Interior Lighting fixture schedule for values. [F118]1 lighting power is consistent with what ❑Does Not :is shown on the approved lighting :plans, demonstrating proposed watts ENot Observable :are less than or equal to allowed ENot Applicable watts. C408.3 Lighting systems have been tested to ❑Complies [F133]1 ensure proper calibration, adjustment, ❑Does Not :programming, and operation. ENot Observable ❑Not Applicable C406 :Efficient HVAC performance, efficient ❑Complies [F134]1 lighting system, or on-site supply of ❑Does Not :renewable energy consistent with :what is shown the approved plans. ENot Observable ENot Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Left Bank Restaurant Report 05/30/14 Data J:\2727.00 - Left Bank Energy Compliance\Ltg Calcs\272700EC01_Rev2.cck Page 5 of 5