Loading...
HomeMy WebLinkAboutB14-0220 Engineer report.pdfKRMCONSULTANTS, INC. ~\L{-D'Z-Z o RECORD P.O. Box 4572 • Vall, Colorado 81658 • 970-949-9391 TO: DATE: PROJECT: ORR Clinton Amondson Vail Custom Builders 03/26/15 Harman Residence D MEETING NOTES JOB NUMBER: 1404-21 ~RESPONSE D CLARIRCATION/CHANGE In the master bathroom floor, the top chord of a joist was shaved % 0 to allow a shower drain pipe to pass through. This has been reviewed and is acceptable as is. No repair is needed. SIGNED: COPY TO: Tim D. Hannum, PE i ! l I I I ! ! l I ! I I