HomeMy WebLinkAboutB14-0220 Engineer report.pdfKRMCONSULTANTS, INC.
~\L{-D'Z-Z o
RECORD
P.O. Box 4572 • Vall, Colorado 81658 • 970-949-9391
TO:
DATE:
PROJECT:
ORR
Clinton Amondson
Vail Custom Builders
03/26/15
Harman Residence
D MEETING NOTES
JOB NUMBER: 1404-21
~RESPONSE D CLARIRCATION/CHANGE
In the master bathroom floor, the top chord of a joist was shaved % 0 to allow a shower drain pipe to pass
through. This has been reviewed and is acceptable as is. No repair is needed.
SIGNED: COPY TO:
Tim D. Hannum, PE
i ! l
I
I
I ! ! l
I ! I I