HomeMy WebLinkAboutB14-0229COM Check.pdf COMcheck Software Version 3.9.3
(IP
11 Interior Lighting and Power
Compliance Certificate •••'o° REc '''
90.1 (2010) Standard /
vi 5837
rt. \
zi cr.
Section 1: Project Information 6/24/2014 :'
A. SS...........�0•••
.
,•
Project Type: New Construction ••. /pr�p�L
Project Title : Northside Grab-N-Go ••.•"••••••'''••.
Construction Site: Owner/Agent: Designer/Contractor:
2271 N Frontage Rd.W Northside Grab-n-Go Architectural Engineering Design Group,
Vail,CO 81657 2271 N Frontage Rd.W Inc.
Vail,CO 81657 1900 Wazee Street,Suite 350
Denver,CO 80202
Section 2: Interior Lighting and Power Calculation
A B C D
Area Category Floor Area Allowed Allowed Watts
(ft2) Watts/ft2 (B x C)
Retail:Sales Area 1474 1.68 2476
Allowance:Other retail highlighting/Fix. ID:S1 500(a) 0.6 207(b)
Allowance:Other retail highlighting/Fix. ID:E 274(a) 0.6 164(b)
Allowance:Other retail highlighting/Fix. ID:Al 100(a) 0.6 60(b)
Allowance:Other retail highlighting/Fix. ID:L 300(a) 0.6 180(b)
Allowance:Other retail highlighting/Fix. ID:T1 600(a) 0.6 360(b)
Common Space Types:Food Preparation 218 0.99 216
Common Space Types:Restrooms 37 0.98 36
Common Space Types:Corridor/Transition>=8 ft wide 94 0.66 62
Common Space Types:Office-Enclosed 92 1.11 102
Supplemental Allowed Watts(c)= 953
Total Allowed Watts= 4817
(a)Area claimed must not exceed the illuminated area permitted for this allowance type.
(b) Allowance is(B x C)or the actual wattage of the fixtures given in Section 2,whichever is less.
(c) Supplemental watts must be associated with retail merchandise highlighting fixtures.Supplemental watts are not included
calculation of lighting complaince percentage.
Section 3: Interior Lighting Fixture Schedule
A B C D E
Fixture ID :Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D)
Fixture Fixtures Watt.
Retail:Sales Area(1474 sq.ft.)
Linear Fluorescent 1:51:46"T5 28W: Electronic: 1 3 69 207
Incandescent 1:E:Incandescent 40W: 1 9 40 360
LED 2:A1:Other: 1 8 14 112
LED 1:L:Other: 1 17 14 238
Track lighting 1:Tl:Wattage based on 130 feet of track 0 0 3900 3900
Common Space Types:Food Preparation(218 sq.ft.)
Common Space Types:Restrooms(37 sq.ft.)
Common Space Types:Corridor/Transition>=8 ft wide(94 sq.ft.)
Common Space Types:Office-Enclosed(92 sq.ft.)
Total Proposed Watts= 4817
Interior Lighting:Passes using retail merchandise highlighting supplemental watts.
Project Title: Northside Grab-N-Go Report date: 06/24/14
Data filename:J:\2740.00- Northside Grab-N-Go\Ltg Calcs\274000LC01.cck Page 1 of 2
Section 4: Compliance Statement
Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans,specifications and
other calculations submitted with this permit application.The proposed li. ting system has i-en designed to meet the 90.1 (2010)Standard
requirements in COMcheck Version 3.9.3 and to comply with the mandatory requirements the "e. •rements Checklist.
Jeff Mullikin -- 6/24/2014
Name-Title . - e p Date
Section 5: Post Construction Compliance SI, e ent
Record Drawings and Operating and Maintenance Manuals:
p 1. Construction documents with record drawings and operating and maintenance manuals provided to the owner.
Lighting Designer or Contractor Name Signature Date
,.••'oo REc •.
: •'pi'
v' 35837 z �,
's { 6/24/2014 ::'/
LO . ,\Or
•'•....0 u•••r
Project Title: Northside Grab-N-Go Report date: 06/24/14
Data filename:J:\2740.00- Northside Grab-N-Go\Ltg Calcs\274000LC01.cck Page 2 of 2
COMcheck Software Version 3.9.3
(III li Inspection Checklist
Energy Code: 90.1 (2010) Standard
Requirements: 69.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
••••00. RE0 ••.
t. ,
t 0' -35837
z' :
%;.-15\ 6/24/2014 cy
1 High Impact(Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact(Tier 3)
Project Northside Grab-N-Go Report date: 06/24/1
Data J:\2740.00 - Northside Grab-N-Go\Ltg Calcs\274000LC01.cck Page 1 of 4
90.1
(2010) Plan Review Complies? Comments/Assumptions
Standard
4.2.2,8.4. :Plans, specifications, and/or ❑Complies Requirement will be met.
1.1,8.4.1. 'calculations provide all information ❑Does Not
2,8.7 ;with which compliance can be
[PR6]2 ;determined for the electrical systems ❑Not Observable
:and equipment and document where ❑Not Applicable
;exceptions are claimed. Feeder
:connectors sized in accordance with
approved plans and branch circuits
;sized for maximum drop of 3%.
4.2.2,9.4. :Plans, specifications, and/or ❑Complies
4,9.7 :calculations provide all information ❑Does Not
[PR4]1 ;with which compliance can be
:determined for the interior lighting ❑Not Observable
:and electrical systems and equipment ❑Not Applicable
:and document where exceptions to
:the standard are claimed. Information
provided should include interior
:lighting power calculations, wattage of
:bulbs and ballasts,transformers and
control devices.
Additional Comments/Assumptions:
."'""
:io: p 5837
6/24/2014 /Au:
.. •
.........• �c, .
•. S/ONA� .••
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Northside Grab-N-Go Report date: 06/24/1
Data J:\2740.00 - Northside Grab-N-Go\Ltg Calcs\274000LC01.cck Page 2 of 4
90.1
(2010) Rough-In Electrical Inspection Complies? Comments/Assumptions
Standard
8.4.2 ;At least 50%of all 125 volt 15-and ❑Complies Exception: Space type is not private office, open office, or
[EL1O]z X20-Amp receptacles are controlled by ❑Does Not computer classroom.
:an automatic control device.
['Not Observable
❑Not Applicable
9.4.1.1 ;Automatic controls to shut off all ❑Complies
[EL1]z building lighting installed in buildings ❑Does Not
>5,000 ft2.
❑Not Observable
❑Not Applicable
9.4.1.2 Independent lighting controls installed ❑Complies 'Requirement will be met.
[EL2]z per approved lighting plans and all ❑Does Not
:manual controls readily accessible and
;visible to occupants. ENot Observable
❑Not Applicable
9.4.1.3 ;Parking garage lighting is equipped EComplies Exception: Requirement does not apply.
[EL11]z :with required lighting controls and ❑Does Not
;daylight transition zone lighting.
ENot Observable
❑Not Applicable
9.4.1.4 ;Primary sidelighted areas >=250 ft2 EComplies Exception: Retail spaces.
[EL12]1 :are equipped with required lighting ❑Does Not
:controls.
❑Not Observable
❑Not Applicable
9.4.1.5 ;Enclosed spaces with daylight area ❑Complies Exception: Requirement does not apply.
[EL13]1 under skylights and rooftop monitors ❑Does Not
j>900 ft2 are equipped with required
;lighting controls. ❑Not Observable
❑Not Applicable
9.4.1.6 ;Separate lighting control devices for ❑Complies Requirement will be met.
[EL4]1 :specific uses installed per approved ❑Does Not
;lighting plans.
❑Not Observable
❑Not Applicable
9.4.2 ;Exit signs do not exceed 5 watts per ❑Complies Requirement will be met.
[EL6]1 :face. ❑Does Not
ENot Observable
❑Not Applicable
9.6.2 ;Additional interior lighting power ❑Complies Requirement will be met.
[EL8]1 allowed for special functions per the ❑Does Not
;approved lighting plans and is
;automatically controlled and ❑Not Observable
separated from general lighting. ❑Not Applicable
Additional Comments/Assumptions:
................••-
Sp RE(: •-
O. ' 5837
6/24/2014;
••c IONAk-vim••
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Northside Grab-N-Go Report date: 06/24/1
Data J:\2740.00 - Northside Grab-N-Go\Ltg Calcs\274000LC01.cck Page 3 of 4
90.1
(2010) Final Inspection Complies? Comments/Assumptions
Standard _
8.7.1 Furnished as-built drawings for ❑Complies
[F116]3 :electric power systems within 30 days ❑Does Not
:of system acceptance.
['Not Observable
❑Not Applicable
8.7.2 Furnished O&M instructions for ❑Complies
[F117]3 :systems and equipment to the ❑Does Not
;building owner or designated
;representative. Not Observable
❑Not Applicable
9.2.2.3 :Interior installed lamp and fixture EComplies See the Interior Lighting fixture schedule for values.
[F118]' :lighting power is consistent with what ❑Does Not
is shown on the approved lighting ❑Not Observable'
:plans, demonstrating proposed watts
:are less than or equal to allowed ❑Not Applicable
:watts.
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
4.TF1
+0: — 5837
`
'q 6/24/2014
ti,• .........
.. .. 0,,'.
•'•••....1......
Project Northside Grab-N-Go Report 06/24/14
Data J:\2740.00 - Northside Grab-N-Go\Ltg Calcs\274000LC01.cck Page 4 of 4