HomeMy WebLinkAboutA3 REV1.pdfA3
4EAST ELEVATION
--
DEMO WALLS, DOOR AND SIDING.
SAVE FOR FUTURE SHED WALLS
REMOVE AND REPLANT SMALL
TREE PER OWNERS DIRECTION
MULCH/NATIVE AREA
REMOVE TREE AND PREP
FOR HOT TUB. HOT TUB
BASE TO BE SUNKEN PIT
WITH CENTER DRAIN
MORTAR SET
FLAGSTONE OVER
CONCRETE TO REMAIN
DEMO BOILER FLUE EXHAUST
COVER AND SAVE FOR
FUTURE USE
50' STREAM SETBACK LINE
EXISTING STORAGE
28 SF EXISTING
A3
4EAST ELEVATION
POUR CONCRETE @ NEW SHED EXTENSION
ADD ALTERNATE TO SET FLAGSTONE TO MATCH
11' - 0"
4' - 9" 6' - 3"
STUB OUT FOR HOT TUB
ELECTRICAL
ELECTRICAL CONDUIT FOR
HOT TUB
ELECTRICAL CONDUIT AT WALL THEN TO
NEW TRENCH FOR FUTURE HOT TUB
NOTE: ADD ALTERNATE TO INSULATE WATER
PIPES IN SHED FOR FREEZE PROTECTION
NEW W6 STEEL BEAM ABOVE TO
SUPPORT NEW DECK EXTENSION
PACK HOLE @ WALL @ BOILER
FLUE WITH NON SHRINK
GROUT
REPLANT SMALL TREE PER
OWNERS DIRECTION
MULCH/NATIVE AREA
ELECTRICAL PANEL FOR FUTURE HOT
TUB
MORTAR SET
FLAGSTONE OVER
CONCRETE
HOT TUB
EXISTING LAMP TO REMAIN
INTERIOR OF HOUSE
GAS LINE FOR PATIO
HEATER APPLIANCE NOT TO
EXCEED 3/4" LINE
50' STREAM SETBACK LINE
6' - 0 3/4"
6' - 1"
2' - 0 7/8"
65 SF
STORAGE
207
11' - 2 1/2"
ELECTRICAL DISCONNECT
LOCATION FOR HOT TUB
WITHIN EYE SIGHT BUT MORE
THAN 5' AWAY FROM HOT TUB.
A3
4EAST ELEVATION
OTHER HALF OF DUPLEX
EXISTING DECK
--
EXISTING RAILING TO BE
REMOVED AND REUSED WITH
NEW RAILING
REUSED RAILING PORTION
ADD 90 DEGREE TURN AND
REUSED EXISTING RAILING
PORTION IF POSSIBLE
3' - 0"
NEW 3'-0" DECK EXTENSION
3' - 0"
BOILER EXHAUST @ ROOF OF
SHED
SHINGLED ROOF
PARTITION WALL TO REMAIN AS-IS
NEW HOT TUB LOCATION @
LEVEL BELOW
-
---
RIP TOP OF FRAMING OVER SHED TO 1/8" PER
FOOT. ALLOW ROOM FOR W.P MEMBRANE OVER
1/2" PLYWOOD OVER FRAMING. INSTALL LEVEL
SLEEPERS OVER W.P MEMBRANE FOR DECKING.
NEW DECKING PER OWNERS
DIRECTION
NEW STRUCTURAL FRAMING
SCABBED TO EXISTING 2X
FRAMING FOR 3'-0" EXTENSION
7
A3
NEW FLAGSTONE INFILL OVER
SLAB ON GRADE
50' STREAM SETBACK
13' - 9"
951 SF
MAIN LEVEL
108
EXISTING/DEMO
LOWER LEVEL
FLOORPLAN
7411' - 1 1/2"
MAIN LEVEL DEMO
& NEW
FLOORPLAN
7419' - 0"
7' - 0 1/2"
6' - 4"
6' - 0"
ROOF TO MATCH PITCH OF DIVISING WALL
RAILING TO BE REUTILIZED
W6 STEEL BEAM TO SUPPORT DECK EXTENSION
SCISSOR 2X10 RAFTER ONTO EXISTING DECK RAFTER
WITH TIMBERLOCK SCREWS MIN. OF 6" O.C
NOTCH 2X10 RAFTER 1" TO MAINTAIN 6'-8" CLR. HEAD HEIGHT
BOILER FLUE EXHAUST OUT ROOF OF SHED
FUTURE FIRE PIT
RIP TOP OF FRAMING OVER SHED TO 1/8" PER FOOT.
ALLOW ROOM FOR W.P MEMBRANE OVER 1/2" PLYWOOD
OVER FRAMING. INSTALL LEVEL SLEEPERS OVER W.P
MEMBRANE FOR DECKING
A3
7
0' - 0 1/2"
2X DECKING PER OWNER
2X SLEEPER RIPPED TO LEVEL DECK
W.P MEMBRANE OVER 1/2" PLYWOOD OVER RIPPED DECK FRAMING
1X4 FASCIA BOARD ATTACHED TO SLEEPER FRAMING
FLASHING DRIP EDGE
2X RIM JOIST RIPPED TO FIT
DOUBLE 2X10 BEAM
ASPHALT SHINGLE OVER W.P MEMBRANE OVER
1/2" PLYWOOD OVER 2X 8 ROOF FRAMING
JOIST HANGER
1X4 OVER 1X10 FASCIA BOARD
1X10 FASCIA BOARD ATTACHED TO DECK FRAMING
SHED INTERIOR
METAL RAILING TO MATCH EXISTING
<4"
VERIFY SLOPE IN FIELD
STONE WALL ON CONCRETE
STONE CAP ON CONCRETE WALL
HOT TUB PER OWNERS DIRECTION
CONTROLS FOR HOT TUB @ WALL OPENING
SCALE
PROJECT NUMBER
DATE
DRAWN BY
CHECKED BY
As indicated
A3
MAIN LEVEL
FLOORPLANS &
DETAILS
13.07.01
4289 NUGGET LN EAST VAIL, CO 81658
DESIGN DEVELOPMENT
05.29.2014
HDB
HDB
1/4" = 1'-0"
1
EXISTING/DEMO LOWER LEVEL
FLOORPLAN
1/4" = 1'-0"
2
NEW LOWER LEVEL FLOORPLAN
1/4" = 1'-0"
3
MAIN LEVEL DEMO & NEW FLOORPLAN
1/2" = 1'-0"
4
EAST ELEVATION
12" = 1'-0"
5
3D View 8_16
1 1/2" = 1'-0" 7
DECK TO ROOF DETAIL
No. Description Date
1 Revision 1 Date 1
1/2" = 1'-0"
8
1 - HOT TUB
B14-0246 REV1
Received
By Carolyn Godfrey at 12:34 pm, Sep 03, 2014
10/07/14