HomeMy WebLinkAboutA3 REV1.pdfA3 4EAST ELEVATION -- DEMO WALLS, DOOR AND SIDING. SAVE FOR FUTURE SHED WALLS REMOVE AND REPLANT SMALL TREE PER OWNERS DIRECTION MULCH/NATIVE AREA REMOVE TREE AND PREP FOR HOT TUB. HOT TUB BASE TO BE SUNKEN PIT WITH CENTER DRAIN MORTAR SET FLAGSTONE OVER CONCRETE TO REMAIN DEMO BOILER FLUE EXHAUST COVER AND SAVE FOR FUTURE USE 50' STREAM SETBACK LINE EXISTING STORAGE 28 SF EXISTING A3 4EAST ELEVATION POUR CONCRETE @ NEW SHED EXTENSION ADD ALTERNATE TO SET FLAGSTONE TO MATCH 11' - 0" 4' - 9" 6' - 3" STUB OUT FOR HOT TUB ELECTRICAL ELECTRICAL CONDUIT FOR HOT TUB ELECTRICAL CONDUIT AT WALL THEN TO NEW TRENCH FOR FUTURE HOT TUB NOTE: ADD ALTERNATE TO INSULATE WATER PIPES IN SHED FOR FREEZE PROTECTION NEW W6 STEEL BEAM ABOVE TO SUPPORT NEW DECK EXTENSION PACK HOLE @ WALL @ BOILER FLUE WITH NON SHRINK GROUT REPLANT SMALL TREE PER OWNERS DIRECTION MULCH/NATIVE AREA ELECTRICAL PANEL FOR FUTURE HOT TUB MORTAR SET FLAGSTONE OVER CONCRETE HOT TUB EXISTING LAMP TO REMAIN INTERIOR OF HOUSE GAS LINE FOR PATIO HEATER APPLIANCE NOT TO EXCEED 3/4" LINE 50' STREAM SETBACK LINE 6' - 0 3/4" 6' - 1" 2' - 0 7/8" 65 SF STORAGE 207 11' - 2 1/2" ELECTRICAL DISCONNECT LOCATION FOR HOT TUB WITHIN EYE SIGHT BUT MORE THAN 5' AWAY FROM HOT TUB. A3 4EAST ELEVATION OTHER HALF OF DUPLEX EXISTING DECK -- EXISTING RAILING TO BE REMOVED AND REUSED WITH NEW RAILING REUSED RAILING PORTION ADD 90 DEGREE TURN AND REUSED EXISTING RAILING PORTION IF POSSIBLE 3' - 0" NEW 3'-0" DECK EXTENSION 3' - 0" BOILER EXHAUST @ ROOF OF SHED SHINGLED ROOF PARTITION WALL TO REMAIN AS-IS NEW HOT TUB LOCATION @ LEVEL BELOW - --- RIP TOP OF FRAMING OVER SHED TO 1/8" PER FOOT. ALLOW ROOM FOR W.P MEMBRANE OVER 1/2" PLYWOOD OVER FRAMING. INSTALL LEVEL SLEEPERS OVER W.P MEMBRANE FOR DECKING. NEW DECKING PER OWNERS DIRECTION NEW STRUCTURAL FRAMING SCABBED TO EXISTING 2X FRAMING FOR 3'-0" EXTENSION 7 A3 NEW FLAGSTONE INFILL OVER SLAB ON GRADE 50' STREAM SETBACK 13' - 9" 951 SF MAIN LEVEL 108 EXISTING/DEMO LOWER LEVEL FLOORPLAN 7411' - 1 1/2" MAIN LEVEL DEMO & NEW FLOORPLAN 7419' - 0" 7' - 0 1/2" 6' - 4" 6' - 0" ROOF TO MATCH PITCH OF DIVISING WALL RAILING TO BE REUTILIZED W6 STEEL BEAM TO SUPPORT DECK EXTENSION SCISSOR 2X10 RAFTER ONTO EXISTING DECK RAFTER WITH TIMBERLOCK SCREWS MIN. OF 6" O.C NOTCH 2X10 RAFTER 1" TO MAINTAIN 6'-8" CLR. HEAD HEIGHT BOILER FLUE EXHAUST OUT ROOF OF SHED FUTURE FIRE PIT RIP TOP OF FRAMING OVER SHED TO 1/8" PER FOOT. ALLOW ROOM FOR W.P MEMBRANE OVER 1/2" PLYWOOD OVER FRAMING. INSTALL LEVEL SLEEPERS OVER W.P MEMBRANE FOR DECKING A3 7 0' - 0 1/2" 2X DECKING PER OWNER 2X SLEEPER RIPPED TO LEVEL DECK W.P MEMBRANE OVER 1/2" PLYWOOD OVER RIPPED DECK FRAMING 1X4 FASCIA BOARD ATTACHED TO SLEEPER FRAMING FLASHING DRIP EDGE 2X RIM JOIST RIPPED TO FIT DOUBLE 2X10 BEAM ASPHALT SHINGLE OVER W.P MEMBRANE OVER 1/2" PLYWOOD OVER 2X 8 ROOF FRAMING JOIST HANGER 1X4 OVER 1X10 FASCIA BOARD 1X10 FASCIA BOARD ATTACHED TO DECK FRAMING SHED INTERIOR METAL RAILING TO MATCH EXISTING <4" VERIFY SLOPE IN FIELD STONE WALL ON CONCRETE STONE CAP ON CONCRETE WALL HOT TUB PER OWNERS DIRECTION CONTROLS FOR HOT TUB @ WALL OPENING SCALE PROJECT NUMBER DATE DRAWN BY CHECKED BY As indicated A3 MAIN LEVEL FLOORPLANS & DETAILS 13.07.01 4289 NUGGET LN EAST VAIL, CO 81658 DESIGN DEVELOPMENT 05.29.2014 HDB HDB 1/4" = 1'-0" 1 EXISTING/DEMO LOWER LEVEL FLOORPLAN 1/4" = 1'-0" 2 NEW LOWER LEVEL FLOORPLAN 1/4" = 1'-0" 3 MAIN LEVEL DEMO & NEW FLOORPLAN 1/2" = 1'-0" 4 EAST ELEVATION 12" = 1'-0" 5 3D View 8_16 1 1/2" = 1'-0" 7 DECK TO ROOF DETAIL No. Description Date 1 Revision 1 Date 1 1/2" = 1'-0" 8 1 - HOT TUB B14-0246 REV1 Received By Carolyn Godfrey at 12:34 pm, Sep 03, 2014 10/07/14