Loading...
HomeMy WebLinkAboutB14-0254 REV4 inspection denied.pdf I i _1 • r , i _ 11-13-2014 Inspection Request Reporting Page 11 3:58 pm Vail, CO - City Of Requested Inspect Date: Friday November 14,2014 Site Address: 241 E MEADOW DR VAIL VAIL VILLAGE WELCOME CENTER A/P/D Information Activity B14-0254 Type: COMBO Sub Type: ACOM Status: ISSUED Const Type Occupancy: Use: A-3 lnsp Area: Owner TOWN OF VAIL Applicant: G.E.JOHNSON CONSTRUCTION CO INC Phone: 970-845-0272 Contractor: G.E.JOHNSON CONSTRUCTION CO INC Phone: 970-845-0272 Description Interior& Exterior renovations to Vail Welcome Center Notice ProjectDox-SBELLM I Comment REV3 S2.01 and S3.02 routed to Projectdox-CGODFREY Comment REV2 progress report routed to Projectdox-CGODFREY Requested Inspection(s) Item: 290 PLMB-Final Requested Time: 03:30 PM 1 Requestor: G.E.JOHNSON CONSTRUCTION CO INC Phone: 970-845-0272 -or- 970-376- 2523 cell Comments 418-4540 1-1- Er I�JkJ (t, Entered By: JMONDRAGON K Assigned To JMONDRAGON Action Time Exp: Item: 390 MECH-Final Requested Time: 04:00 PM Requestor: G.E.JOHNSON CONSTRUCTION CO INC Phone: 970-845-0272 -or- 970-376- Comments 418-4540 ID f. ''...1l `t'—) 2523 cell Assigned To JMONDRAGON Entered By: JMONDRAGON K Action Time Exp: IP:". "i 6 Inspection History Item: 110 ELEC-Service 11/03/14 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: Panel and feeders Item: 120 ELEC-Rough **Approved** 10/27/14 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: all except desk area • 11/12/14 Inspector: sgremmer Action: AP APPROVED Comment: Item: 200 MECH-Rough *"Approved** 09/10/14 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: snow melt 10/27/14 Inspector: sgremmer Action: AP APPROVED Comment: I Item: 220 PLMB-Rough/D.W.V. **Approved** 110/01/14 Inspector: JRM Action: PI PARTIAL INSPECTION Comment: ABOVE CEILING 6#AIR TEST 10/23/14 Inspector: sgremmer Action: AP APPROVED Comment: tested at 6 psi Item: 230 PLMB-Rough/Water **Approved** 10/01/14 Inspector: JRM Action: PI PARTIAL INSPECTION Comment: ABOVE CEILING 100#AIR TEST 10/23/14 Inspector: sgremmer Action: AP APPROVED Comment: tested at 100 psi Item 240 PLMB-Gas Piping Item 310 MECH-Heating Item 340 MECH-Misc. **Approved*" I11/12/14 Inspector: sgremmer Action: AP APPROVED 1 Comment: u-values Item: 30 BLDG-Framing **Approved** 10/08/14 Inspector: sgremmer Action: DN DENIED I Comment: east walls have been inspected along with simpson hanger LGT4 sway bracing at east side needs to be weleded at each steel stud 10/09/14 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: walls on east side complete 10/16/14 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: exterior sheathing and in fill framing 10/22/14 Inspector: sgremmer Action: DN DENIED Comment: Simpson hanger S/JCT to be secured per install instructions 10/29/14 Inspector: sgremmer Action: AP APPROVED REPT131 Run Id: 14888