November 18th, 2014
Subject: Summary of Materials Testing Services and
Special Inspection Services, Vail Village Welcome
Center, Vail, Colorado
Ground Engineering Job Number: 14-6581
TOV Permit Number: B14-0254
Mr. John King
Town of Vail
1309 Elkhorn Drive
Vail, Colorado 81657
Attn: Mr. King,
This letter summarizes the special inspection and materials testing services GROUND Engineering
Consultants, Inc. (GROUND) performed during improvements to the Vail Village Welcome Center in Vail,
Colorado. The special inspection and materials testing services were performed at times scheduled by
the Contractor and/or Subcontractors between September 19th, 2014 and November 18th, 2014 and
according to GROUND’s proposal # 1403-0331 dated March 14th, 2014.
During construction, representatives of our office performed periodic testing on the structural concrete
placed for the foundation footings, pads and walls. Samples of the structural concrete were periodically
tested to determine physical properties and compressive strength. Epoxied doweled reinforcing steel
connections were also observed.
Representatives of our office also observed applied placements of intumescent fireproofing at various
locations. Thickness measurement readings were randomly performed on the various members.
During construction, structural steel welded and/or bolted connections were periodically observed during
construction by a certified welding inspector (CWI). These observations were completed at times
scheduled by the Contractor or Subcontractor.
Based on the field observations to date, RFI’s received and/or project documentation received from the
design team, it is our opinion that the materials observed for the structural concrete, drilled and epoxied
reinforcing steel, intumescent fireproofing and structural steel were in general accordance with project
plans, specifications, and/or applicable RFI’s.
The observations and materials testing as indicated above were performed periodically to provide data to
the Owner, Contractor and Subcontractors to assist them in evaluating the general compliance of the
materials and/or work with the contract documents at the times of our observation and testing. We did
not supervise, direct nor have any control over any of the Contractor’s or Subcontractor’s work. We were
not responsible for the Contractor’s or Subcontractor’s scheduling of our services, means, methods,
procedures, techniques, or sequences of construction, nor responsible for ensuring that any Contractor or
Subcontractor performed or completed the work in accordance with the contract documents or
construction industry standards.
Vail Village Welcome Center – Final Summary
Vail, Colorado
Job No. 14-6581 GROUND Engineering Consultants, Inc. Page 2 of 2
If you have any questions concerning this letter, please contact our office.
Sincerely,
GROUND Engineering Consultants, Inc.
Chris Hutto, C.E.T. Reviewed by Carl Henderson, P.E.