Loading...
HomeMy WebLinkAboutBegin_Workflow-08-06-2014_14-14-13.pdfClick Here to Save Eform as PDF... Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip Review Coordinator Carolyn Godfrey  ( cgodfrey@vailgov.com ) Review Cycle 1 Workflow/Activity Name Begin_Workflow / DepartmentReview  Activity InstructionsUpon acceptance of task, please review the required drawings and provide any applicable  comments and status. Current User Logon Martin Haeberle ( mhaeberle@vailgov.com)  CHANGEMARKS ­ Review Cycle:1 Filter Changemarks by Keyword:  SEARCH    SHOW ALL Click Here to Load Changemarks... Click Here to Publish Changemarks to PDF... Sorting: Resolved Status File Cycle Department File Markup Description Details Applicant Response Yes | No No 1 Building B14­0266 Installation plans.pdf mhaeberle B001 Provide a roof plan showing, pitch, roof connections, and panel locations by a structural engineer. a picture of the roof does not satisfy this requirement Show My Changemarks comments on letter.  Submittal shall meet criteria set forth in IFC  2012 ed., sections 605.11.1 through 605.11.4, the IBC 2012 ed.,  and NFPA 70. DEPARTMENT REVIEW ­ Review Cycle:1   CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES 1 PLANNING WARREN CAMPBELL  WCAMPBELL@VAILGOV.COM Approved VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 1 BUILDING MARTIN HAEBERLE  MHAEBERLE@VAILGOV.COM Corrections Required VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 1 FIRE MIKE VAUGHAN  MVAUGHAN@VAILGOV.COM Corrections Required VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE Requested Groups 1 Groups Selected Remove all Fire Marshal Add all Chief of Planning Chief of Building Wildland Fire Public Works Complete Review  Request Additional Group  Save & Close   Building Process V1