Loading...
HomeMy WebLinkAboutBegin_Workflow-08-13-2014_14-51-26.pdfClick Here to Save Eform as PDF... Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip Review Coordinator Carolyn Godfrey  ( cgodfrey@vailgov.com ) Review Cycle 2 Workflow/Activity Name Begin_Workflow / DepartmentReview  Activity InstructionsUpon acceptance of task, please review the required drawings and provide any applicable  comments and status. Current User Logon Martin Haeberle ( mhaeberle@vailgov.com)  CHANGEMARKS ­ Review Cycle:2 Filter Changemarks by Keyword:  SEARCH    SHOW ALL Click Here to Load Changemarks... Click Here to Publish Changemarks to PDF... Sorting: Resolved Status File Cycle Department File Markup Description Details Applicant Response Yes | No No 2 Building Roof Plan with dimensions.pdf mhaeberle B001 Show connection method in conformance with Vail snow loads per the IBC 2012 edition. Architect to identify practicing structural engineering in that the purpose of the roof plan is not only to identify location of the panels but to clarify structural integrity of the roof and the electrical system being installed on the roof. Yes | No No 2 Building Roof Plan with dimensions.pdf mhaeberle B002 Indicate on plans building code edition of the structural design Show My Changemarks DEPARTMENT REVIEW ­ Review Cycle:2   CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES 2 FIRE ­select status­ VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 2 PLANNING WARREN CAMPBELL  WCAMPBELL@VAILGOV.COM Approved VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 2 BUILDING MARTIN HAEBERLE  MHAEBERLE@VAILGOV.COM InReview VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE Complete Review  Request Additional Group  Save & Close   Building Process V1 Requested Groups 0 Groups Selected Remove all Add all Chief of Planning Chief of Building Fire Marshal Wildland Fire