HomeMy WebLinkAboutBegin_Workflow-08-13-2014_14-51-26.pdfClick Here to Save Eform as PDF...
Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip
Review Coordinator Carolyn Godfrey ( cgodfrey@vailgov.com )
Review Cycle 2
Workflow/Activity Name Begin_Workflow / DepartmentReview
Activity InstructionsUpon acceptance of task, please review the required drawings and provide any applicable
comments and status.
Current User Logon Martin Haeberle ( mhaeberle@vailgov.com)
CHANGEMARKS Review Cycle:2
Filter Changemarks by Keyword: SEARCH SHOW ALL
Click Here to Load Changemarks...
Click Here to Publish Changemarks to PDF...
Sorting:
Resolved Status File Cycle Department File Markup Description Details Applicant Response
Yes | No No 2 Building Roof Plan with
dimensions.pdf mhaeberle B001
Show connection method in conformance with Vail
snow loads per the IBC 2012 edition. Architect to
identify practicing structural engineering in that the
purpose of the roof plan is not only to identify
location of the panels but to clarify structural
integrity of the roof and the electrical system being
installed on the roof.
Yes | No No 2 Building Roof Plan with
dimensions.pdf mhaeberle B002 Indicate on plans building code edition of the
structural design
Show My Changemarks
DEPARTMENT REVIEW Review Cycle:2
CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES
2 FIRE
select status
VIEW CHECKLIST
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
2 PLANNING WARREN CAMPBELL
WCAMPBELL@VAILGOV.COM
Approved
VIEW CHECKLIST
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
2 BUILDING
MARTIN HAEBERLE
MHAEBERLE@VAILGOV.COM
InReview
VIEW CHECKLIST
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
Complete Review Request Additional Group Save & Close
Building Process V1
Requested Groups
0 Groups Selected Remove all Add all
Chief of Planning
Chief of Building
Fire Marshal
Wildland Fire