HomeMy WebLinkAbout2722 Cortina Lane - Sheet - A5-5 - BUILDING SECTIONS.pdfMAIN LEVEL
FLOOR PLAN
FINISHED FLOOR
46' - 6"
UPPER LEVEL
FLOOR PLAN
FINISHED FLOOR
57' - 6"
LOWER LEVEL
FINISHED FLOOR
34' - 6"
1
A5.13
1
A5.12
1
A5.10
B.O. CEILING @ 10' - 9" AFF
B.O. CEILING @ 9' - 0" AFF
1
A5.11
OFFICE
105
PANTRY
106
STAIRS
102
FAMILY ROOM
011
STAIRS
010
1
A5.9
1
A5.8
T.O. CONC. WALL @ 46' - 7"
STRUCTURAL CONCRETE
SLAB OVER VOID FORM OVER
COMPACTED FILL POURED
OVER T.O. WALL RE: STRUCT.
STRUCTURAL CONC. GRADE
BEAM @ INTERSECTION OF
SLAB ON GRADE AND
STRUCTURAL CONC. SLAB
RE: STRUCT.
LINE OF EXISTING GRADE
PERMANENT SHORING WALL
PER SHORING CONTRACTOR.
W/ STUCCO FINISH
5' - 6"
4' - 0"
A6.2
5
6
A6.4
2
A6.4
A6.1
2
5" 5"
A
B
C D
E F G
H I
8' - 6 9/16"
BUILDING HEIGHT LIMIT 33' - 0" ABOVE EXISTING GRADE
E E
14
102
15
102
1
205
3
204
4
204
3 1/2" 3' - 8 1/4" 3 1/2" 3' - 8 1/4"
D
3 1/2" 7' - 8"
A6.4
1
RUBBLE STONE CAP
C10X15.3
B.O. HEADER @ 10' - 2 1/2" AFF
T.O. PLATE @ 11' - 6 3/8" AFF
T.O. PLATE @ 14' - 1 9/16" AFF
15' - 6"
B.O. HEADER @ 10' - 2 1/2" T.O. CONC. LEDGE 44' - 4"
SECTION GENERAL NOTES:
1) EXTERIOR LIGHTING IS NOTED AS:
M- HEVI LITE INC HL-374 PAR-20 SURFACE MOUNT DOWN LIGHT BRONZE
POWDER COAT FINISH (BZ)- (13) TOTAL FIXTURES
E- HEVI LITE INC HL-384-BZ SURFACE MOUNT MONO POINT BRONZE POWDER
COAT FINISH. PERMANENTLY FIXED/INSTALLED AS A DOWNLIGHT- (5) TOTAL
FIXTURES
2) SEE EXTERIOR MATERIAL AND COLOR INFORMATION SHEET FOR MORE
INFORMATION ON COLORS. SEE OUTLINE SPEC AND ARCHITECTURAL FINISH
SCHEDULE.
3) ALL SNOW FENCES AT STANDING SEAM ROOF TO BE AN ENGINEERED
SYSTEM PER ROOF TYPE AND SLOPE INSTALLED PER MANUFACTURES
RECOMMENDATIONS RE: SPEC.
4) ALL DIMENSIONS / ELEVATIONS ARE FROM T.O. FINISH U.N.O.
5) WINDOW AND DOOR HEAD / SILL HEIGHTS ARE FROM T.O. FINISH.
6) ALL EXTERIOR EXPOSED STEEL HEADERS, BEAM, KNIFE PLATES, ETC, TO
BE PAINTED TO MATCH BRONZE WINDOW COLOR.
ENERGY CONSERVATION: THE BUILDING COMPLIES WITH THE ENERGY
CONSERVATION REQUIREMENT FROM CHAPTER 4 OF THE 2012
INTERNATIONAL ENERGY CODE PER ZONE 6B ADOPTED BY THE TOWN OF
VAIL, AND AS DEMONSTRATED BY PRESCRIPTIVE BUILDING THERMAL
ENVELOPE, AS FOLLOWS:
The following is a summary for the climate zone 6B of Table 402.1.1 requirements of the
IECC and as adopted by The Town of Vail, and an outline of the proposed R values of
the assemblies of the building which are defined in the Construction Document Drawings
and Specifications:
Maximum Glazing U-Factor of .30 for new single family dwelling units per Town of Vail
amendments, this can be a weighted average.
The Sierra Pacific windows and doors with dual glazed Low E glazing (Low E on
two surfaces) exceeds this requiremnt - Average U-Value = .28. See 8.5 x 11 window
proposal from manufacture for summary of U-values.
Ceilings & Roofs Insulation - Requirement of R-49 which is reduced to R-38 per 402.2.1
since the construction techniques provide a full R-38 insulation value over the wall top
plate.
Typical Roof Condition - The design provides a full R-38 insulation value over
the wall top plate as follows: Provide R56.4 at roof Cavities with 5/8" plywood over 14”
TJIs: with 2” minimum of 2# closed cell spray foam insulation with an R value of 6.6 per
inch equaling R13.2 and 12” of blown in cellulose insulation with R3.6 per inch equaling
R43.2.
Basement Walls Insulation - Requires R-15 of continuous insulation or R-19 cavity
insulation : Provide R22.6 with R-10 exterior insulation/drainage medium over the typical
8" concrete wall and R-14.4 at 2x4 wood furring with 4" blown in cellulose insulation with R-
3.6 per inch and 5/8" drywall exceeds the requirement.
Exterior Walls Insulation - Requires R-20: Exterior walls with 5.5” cavity: Provide R22.8
with 1” minimum of spray foam insulation @ inside of sheathing with an R value of 6.6 per
inch equaling R6.6 and 3.5” of blown in cellulose insulation with R3.6 per inch equaling
R16.2 or approved equal.
Floor Insulation - Requires R-30: The building has been designed with a conditioned and
finished basement space.
Floor @ Master Bedroom Overhang - Provide 2" min. spray foam insulation @
underside of floor sheathing w/ an R-Value of 6.6 per inch equaling 13.2 and 9 7/8" of
blown in cellulose insulation w/ R-3.6 per inch equaling
R-35.55 providing a total insulation value of R-48.75.
Basement Slab - Requires R-15 for 4' horizontally under slab (since the slab is heated).
Provide R15 with continuous 3" rigid insulation under the slab and R-10 continuous @
exterior of foundation.
Provide full cavity blown in cellulose sound insulation at all interior walls and at all floor
assemblies.
US Mail Only: P. O. Box 2378
Physical / Fedex: 210 Edwards
Village Blvd, Bldg A Suite A103
Edwards, Colorado 81632-2378
(970) 926 4301, Fax: 926 4364
hans@berglundarchitects.com
www . berglundarchitects.com
Scale
Date
Drawn by
Checked by
Issue Date
8/18/2014 3:07:43 PM
1/4" = 1'-0"
2722 CORTINA LANE
VAIL RIDGE SUBDIVISION, BLOCK B,
LOT 13 , VAIL CO
A5.5
BUILDING
SECTIONS
8-18-14
BKW
HB
8-18-14
BUILDING PERMIT
1/4" = 1'-0"
1
NORTH SOUTH SECTION 5 LOOKING
WEST
REVISION SCHEDULE
# DESCRIPTION DATE
09/17/14