HomeMy WebLinkAboutB14-0302 Special Inspection.pdfWest Slope Testing & Inspection LLC 3177 Glendam Dr. Grand Junction, CO 81504 Phone:970-434-6988 Cell: 970-260-2844 Dates: 4-14-15 & 4-22-15 Inspection Report Client: HP Geotech (Job #HP 114 13 lA) Project: 2722 Cortina Ln. Address: 2722 Cortina Ln. Vail, CO Building Permit No: B 14-0302 General Contractor: Vail Custom Builders Inspection of shop fabrication or field work at job site: Field Report#l Page I of I Report: Received & reviewed material test reports & certificates of compliance for steel materials & welding electrodes used on the project. Visually inspected field welding at steel frame connections roof level framing grid lines 3 & H, and at channel steel connections entryway area. Inspected high strength A325 bolting at steel beam & column connections on the project. The field welding, high strength A325 bolting, and steel materials inspected/verified above appeared to be in substantial conformance with the plans, and the quality requirements of the AWS Dl.1 Structural Welding Code & the AISC/RCSC Specification for A325/ A490 bolting. To the best of my knowledge this completes the special inspections of the structural steel onsite welding, high strength A325 bolting, and material verification. Note per Greg Johnson with Vail Custom Builders other parties/persons had inspected any epoxy anchors & anchors installed in hardened concrete on the project. Inspectorff echnician: Douglas E Young • Douglas E Young CWI 96070131 QC1 EXP. 7/112017 ... :c \/ .. ,KR'M CONSULTANTS, INC. FIELD REPORT . :· P .0. Box 4572 • Vall, Colorado 81658 • 970-949-9391 ·Status of'·•( ··.. 90% · ComDletion •. > : .··. ; P~'im(at 'Sit.l.'.· Greg Johnson (VCB) ".··.· ............. :. ..· . .,;: :----·-----·c~oofFi'amlng $5 1--~~_..;,~~~~~~~~~~~~~~~~~~~~~~~-1--~~~~~~---l 2. U er Floor/Low Roof framln $4 3. Main Floor framin S3 4. Deck Framin $2 5. Photo Ref : · · ·· 1. (1 )-2x6 trimmer present at grid lines "6" & •o• -sheet S5 3. Blocking missing for adequate hanger nailing in detall 14/$6 (4-locations)- sheet 55 5. Post does not have adequate bearing on concrete foundation wall at grid line "6" en -sheetS3 :·: . 1. No action required, (1 )-2x6 trimmer is adequate -sheet 55 . . ·.. ' ; .. Detail'. 5/$9 Do deficiencies require follow-up structural observation? Yes 0 No 181 Other than any deficiencies noted, are the structural elements observed in general conformance with KRM Consultants1 Inc. approved plans and specifications? Yes 181 No 0 SIGNED: COPY TO: 1fl1~c~ /\. ~?~5 Mark T. New an:PfOieCt"i?ngineer c:::: .;y-' REVIEWED: lim D. Hennum, PE \ \