Review Coordinator Shelley Bellm ( sbellm@vailgov.com )
Review Cycle 1
Workflow/Activity Name Begin_Workflow / ApplicantResubmit
Activity InstructionsPlease review all sections of the eForm and drawing markups and resubmit the required
information prior to completion of task.
Current User Logon Keegan Winkeller ( keegan@berglundarchitects.com)
CHANGEMARKS Review Cycle:1
Filter Changemarks by Keyword: SEARCH SHOW ALL
Click Here to Load Changemarks...
Click Here to Publish Changemarks to PDF...
Sorting:
Resolved Status File Cycle Department File Markup Description Details Applicant Response
Yes | No No 1 Public
Works
2722 Cortina
Lane Sheet
A20
OVERALL
SITEPLAN.pdf
tkassmel PW001
Has this easement been platted or recorded
separately. It is not shown on the provided survey.
PLease provide legal record of easement
Yes | No No 1 Public
Works
2722 Cortina
Lane Sheet
A20
OVERALL
SITEPLAN.pdf
tkassmel PW002 Provide engineered retaining wall details and
design.
Yes | No No 1 Public
Works
2722 Cortina
Lane Sheet
A20
OVERALL
SITEPLAN.pdf
tkassmel PW003 Provide shoring design and plans. No shoring shall
encroach upon ROW or adjacent property.
Yes | No No 1 Public
Works
2722 Cortina
Lane Sheet
A20
OVERALL
SITEPLAN.pdf
tkassmel PW004
Public Way permit will be required for all work in the
ROW. Provide construction staging plan and PW
permit applications for all ROW work
Yes | No No 1 Public
Works
2722 Cortina
Lane Sheet
A20
OVERALL
SITEPLAN.pdf
tkassmel1 PW001 Has this been approved by ERWSD?
DEPARTMENT REVIEW Review Cycle:1
CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES
1 BUILDING
FLORENCIO MONDRAGON
JMONDRAGON@VAILGOV.COM
APPROVED
VIEW CHECKLIST
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
Complete Save And Close
Building Process V1
1 FIRE MIKE VAUGHAN
MVAUGHAN@VAILGOV.COM
APPROVED
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
1 PLANNING
JONATHAN SPENCE
JSPENCE@VAILGOV.COM
APPROVED
VIEW CHECKLIST
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
1 PUBLIC WORKS TOM KASSMEL
TKASSMEL@VAILGOV.COM
CORRECTIONS REQUIRED
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
I have reviewed and addressed the Checklist Comments provided on the "Checklist" tab above. Please click on the tab and review each item. Each comment will be
indicated as "Met" or "Not Met". If you would like to export a list of the comments to Excel, click on the "Export to Excel" link in the upper right hand corner of the popup
window.
I have addressed all of the items listed in the Changemarks section above that were identified during the Plan Review.
I have uploaded the revised drawings into the "Drawings" folder and, if requested, uploaded any revised documents into the "Documents" folder using the SAME file name as
the original files. I am ready to complete my assigned task.
Task Instructions