Loading...
HomeMy WebLinkAboutA611.pdfTILE. REFER TO FINISH SCHEDULE FOR SPECIFICATIONS 1:20 PITCH MAX. WOOD FLOOR - REFER TO FINISH SCHEDULE FOR SPECIFICATIONS GC TO FEATHER SETTING COMPOUND TO ALIGN WITH TOP OF WOOD AS SHOWN GC TO ENSURE A LEVEL SUBFLOOR AS NEEDED. VERIFY IN FIELD PRIOR TO INSTALLATION OF FLOORING (TYP.) 3/8" 3/4" G.C. TO INSTALL 3/4" HIGH SCHLUTER SCHIENE STRIP (AE200) G.C. TO INSTALL 9/16" HIGH SCHLUTER SCHIENE STRIP (AE150) WHERE 9/16" THICK WOOD FLOORING IS PROPOSED. WOOD FLOOR - REFER TO FINISH SCHEDULE FOR SPECIFICATIONS GC TO ENSURE A LEVEL SUBFLOOR AS NEEDED. VERIFY IN FIELD PRIOR TO INSTALLATION OF FLOORING (TYP.) WOOD FLOOR - REFER TO FINISH SCHEDULE FOR SPECIFICATIONS G.C. TO INSTALL 3/4" HIGH SCHLUTER SCHIENE STRIP (AE200) 3/4" G.C. TO INSTALL 9/16" HIGH SCHLUTER SCHIENE STRIP (AE150) WHERE 9/16" THICK WOOD FLOORING IS PROPOSED. EXISTING TILE G.C. TO INSTALL 1/2" HIGH SCHLUTER SCHIENE STRIP (AE125) 1/2" TILE. REFER TO FINISH SCHEDULE FOR SPECIFICATIONS 1:20 PITCH MAX. GC TO FEATHER SETTING COMPOUND TO ALIGN WITH TOP OF COCO MAT. AS SHOWN GC TO ENSURE A LEVEL SUBFLOOR AS NEEDED. VERIFY IN FIELD PRIOR TO INSTALLATION OF FLOORING (TYP.) WALK-OFF MAT. REFER TO FINISH SCHEDULE FOR SPECIFICATIONS, 1:20 PITCH MAX. 1/8" 3/8" SHOWER ENCLOSURE BEYOND TILE ON SETTING BED WHITE MARBLE THRESHOLD TILE ON SETTING BED FLOOR LEVELING COMPOUND - FEATHER FOR FLUSH TRANSITION SLOPE 1/16" PER FOOT MAX. RESTROOM 1/2" 1/2" 2" 1/4" 1/4" MAX 1/2" CONCRETE SLAB SHOWER WATERPROOF MEMBRANE (E) CONCRETE GC TO ENSURE A LEVEL SUBFLOOR AS NEEDED. VERIFY IN FIELD PRIOR TO INSTALLATION OF FLOORING (TYP.) MARBLE THRESHOLD (O.A.E.) AT DOOR LOCATION. GC TO VERIFY HEIGHTS IN FIELD PRIOR TO FURNISH AND INSTALLATION. PER WALL TYPE DOOR TO HAVE 1" UNDERCUT AS REQUIRED BY M110 STORESIDE EGRESS CORRIDOR ALIGN EDGE OF TRANSITION WITH DOOR. TRANSITION NOT BE SEEN FROM SALES FLOOR. SEALED RUBBER - REFER TO FINISH SCHEDULE FOR SPECIFICATIONS GC TO FEATHER UP SUB FLOORING TO CREATE EVEN TRANSITION TO THRESHOLD. 1:20 PITCH MAX. 1/4" 1/4" 1/4" 1/4" 2" TILE TO MATCH EXISTING MALL TILE PER GC GC TO FEATHER COMPOUND TO ALIGN WITH TOP OF WOOD AS REQ'D. ALIGN EDGE OF TRANSITION WITH DOOR. TRANSITION NOT TO BE SEEN FROM SALES FLOOR. WOOD FLOOR-REFER TO FINISH SCHEDULE FOR SPECIFICATIONS. GC TO ENSURE A LEVEL SUBFLOOR AS NEEDED. VERIFY IN FIELD PRIOR TO INSTALLATION OF FLOORING (TYP.) FLUSH THRESHOLD AT DOOR LOCATION. SEE DOOR HARDWARE SCHEDULE FOR SPECIFICATION. GC TO VERIFY HEIGHTS IN FIELD PRIOR TO FURNISH AND INSTALLATION. 3/4" STORESIDE MALL CORRIDOR 10" WOOD FLOOR TO CONTINUE TO EDGE OF DOOR. REFER TO FINISH SCHEDULE FOR SPECIFICATIONS GC TO ENSURE A LEVEL SUBFLOOR AS NEEDED. VERIFY IN FIELD PRIOR TO INSTALLATION OF FLOORING (TYP.) ALIGN EDGE OF TRANSITION WITH DOOR. TRANSITION NOT BE SEEN FROM SALES FLOOR. SEALED RUBBER - REFER TO FINISH SCHEDULE FOR SPECIFICATIONS GC TO FEATHER UP SUB FLOORING TO CREATE EVEN TRANSITION TO THRESHOLD. 1:20 PITCH MAX. MARBLE THRESHOLD (O.A.E.) AT DOOR LOCATION. GC TO VERIFY HEIGHTS IN FIELD PRIOR TO FURNISH AND INSTALLATION. 1/8" 3/4" PER WALL TYPE 2" 1/4" 1/4" 3/8" TILE REFER TO FINISH SCHEDULE FOR SPECIFICATIONS GC TO ENSURE A LEVEL SUBFLOOR AS NEEDED. VERIFY IN FIELD PRIOR TO INSTALLATION OF FLOORING (TYP.) MARBLE THRESHOLD (O.A.E.) AT DOOR LOCATION. GC TO VERIFY HEIGHTS IN FIELD PRIOR TO FURNISH AND INSTALLATION. 1 7/8" PER WALL TYPE 3/4" DOOR TO HAVE 1" UNDERCUT AS REQUIRED BY M110 WOOD FLOOR - REFER TO FINISH SCHEDULE FOR SPECIFICATIONS 1/8" 3/8" 1/4" 1/4" TILE, REFER TO SCHEDULE FOR SPECIFICATIONS GC TO ENSURE A LEVEL SUBFLOOR AS NEEDED. VERIFY IN FIELD PRIOR TO INSTALLATION OF FLOORING, TYP. ALIGN EDGE OF TRANSITION WITH DOOR. TRANSITION NOT BE SEEN FROM SALES FLOOR. SEALED RUBBER, REFER TO SCHEDULE FOR SPECIFICATIONS GC TO FEATHER UP SUB FLOORING TO CREATE EVEN TRANSITION TO THRESHOLD. 1:20 PITCH MAX. MARBLE THRESHOLD (O.A.E.) AT DOOR LOCATION. GC TO VERIFY HEIGHTS IN FIELD PRIOR TO FURNISH AND INSTALLATION. DOOR TO HAVE 1" UNDERCUT AS REQUIRED PER M110 1/8" 2" PER WALL TYPE 1/8" 3/8" 1/4" 1/4" 1/4" EXISTING CONCRETE SIDEWALK TILE. REFER TO FINISH SCHEDULE FOR SPECIFICATIONS. GC TO ENSURE A LEVEL SUBFLOOR AS NEEDED. VERIFY IN FIELD PRIOR TO INSTALLATION OF FLOORING (TYP.) THRESHOLD PER DOOR HARDWARE SCHEDULE. GC TO VERIFY HEIGHTS IN FIELD PRIOR TO FURNISH AND INSTALLATION. INSIDE OUTSIDE 10" 1/4" 1/4" SIDEWALK SLOPE 1/4" : 12" 1/8" 3/8" WALK-OFF MAT REFER TO FINISH SCHEDULE FOR SPECIFICATIONS. SLOPE TO LEASE LINE. OUTSIDE INSIDE 10" G.C. TO ENSURE A LEVEL SUBFLOOR AS NEEDED. 1/2" SIDEWALK SLOPE 1/8" : 12" EXISTING CONCRETE SIDEWALK THRESHOLD PER DOOR HARDWARE SCHEDULE. GC TO VERIFY HEIGHTS IN FIELD PRIOR TO FURNISH AND INSTALLATION. 1/4" 1/4" A California Corporation ARCHITECTURE 20521 EARL STREET TORRANCE, CA 90503 T. 310-343-3430 | F. 310-343-3431 www.menemshasolutions.com LOS ANGELES | BOSTON Plans, maps, specifications, studies, and reports not containing a red ink seal imprint accompanied by an original signature by the licensed professional may have been fraudulently altered and shall not be considered an original copy. All information should be disregarded unless verified by the professional whose signature appears above. Copyright Protected 2012. Architect: REZA A. HADAEGH 402807 S T A T E O F C O L O R A D O L I C E N S E D A R C H I T E C T Scale: Job Number: Drawing: LULULEMON ATHLETICA CONSTRUCTION STANDARDS Checked By: Drawn By: Date: ISSUED FOR DD-LLL xx/xx/xx ISSUED FOR DD-LLD ISSUED FOR CD-LLL 07/31/14 ISSUED FOR CD-LLD 08/14/14 ISSUED FOR PERMIT 08/15/14 ISSUED FOR BID xx/xx/xx ISSUED FOR SD NA 07/03/14 19780 08/15/14 A611 TYPICAL DOOR DETAILS NA BAB 193 GORE CREEK DRIVE Vail, CO 81657 SCALE: 3" = 1'-0" 3 WOOD TO TILE TRANSITION @ ENTRY SCALE: 3" = 1'-0" 4 WOOD TO WOOD TRANSITION SCALE: 3" = 1'-0" 2 TILE TO MAT TRANSITION @ ENTRY SCALE: 3" = 1'-0" 5 TILE TO THRESHOLD TRANSITION @ SHOWER SCALE: 3" = 1'-0" 12 RUBBER TO CONC. THESHOLD TRANSITION SCALE: 3" = 1'-0" 6 WOOD TO MALL TILE TRANSITION @ INTERIOR ENTRY SCALE: 3" = 1'-0" 11 WOOD TO RUBBER TRANSITION SCALE: 3" = 1'-0" 9 WOOD TO TILE TRANSITION @ TOILET SCALE: 3" = 1'-0" 10 TILE TO RUBBER TRANSITION SCALE: 3" = 1'-0" 7 TILE TO CONC. TRANSITION AT EXTERIOR ENTRY DOOR SCALE: 3" = 1'-0" 8 MAT TO CONC. TRANSITION AT EXTERIOR ENTRY DOOR SCALE: NTS NOT USED 1 NO. DATE DESCRIPTION 10/08/14