Loading...
HomeMy WebLinkAboutBegin_Workflow-10-02-2014_15-25-52.pdfClick Here to Save Eform as PDF... Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip Review Coordinator Carolyn Godfrey  ( cgodfrey@vailgov.com ) Review Cycle 2 Workflow/Activity Name Begin_Workflow / DepartmentReview  Activity InstructionsUpon acceptance of task, please review the required drawings and provide any applicable  comments and status. Current User Logon Martin Haeberle ( mhaeberle@vailgov.com)  CHANGEMARKS ­ Review Cycle:1 Filter Changemarks by Keyword:  SEARCH    SHOW ALL Click Here to Load Changemarks... Click Here to Publish Changemarks to PDF... Sorting: Resolved Status File Cycle Department File Markup Description Details Applicant Response Yes | No No 1 Building A0.2.pdf mhaeberl B001 Providie location and which ul listing being used Yes | No No 1 Building A0.2.pdf mhaeberl B002 Change of use. Clarify technical infeasibility for not complying with the accessiblity requrienments with a R2 occupancy Yes | No No 1 Building E1.0.pdf mhaeberle B001 what is the proposed wiring method Yes | No No 1 Building E1.0.pdf mhaeberle B002 Required to be installed per the State Electrical Code as well as the Town of vil Yes | No No 1 Building E1.0.pdf mhaeberle B003 Show compliance with IECC 2012 edition Yes | No No 1 Building E1.1.pdf mhaeberle B001 Please identify Yes | No No 1 Building M1.01.pdf mhaeberle B001 indicate to be painted matching exterior Yes | No No 1 Building M1.01.pdf mhaeberle B002 Penetrating fire rated assemblies? Please clarify Yes | No No 1 Building M1.01.pdf mhaeberle B001 Is existing hot water system adequate for the loads proposed. Please clarify Complete Review  Request Additional Group  Save & Close   Building Process V1 Yes | No No 1 Building P1.01.pdf mhaeberle B001 How is fire pentrations of fire assemblies to be protected? Detail on plans Yes | No No 1 Planning A0.2.pdf p.001 Changemarks note #01 Need exhibit showing GRFA calcs for determiniation of inclusionary zoning fee in lieu. Show My Changemarks DEPARTMENT REVIEW ­ Review Cycle:2   CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES 2 BUILDING MARTIN HAEBERLE  MHAEBERLE@VAILGOV.COM InReview VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 2 FIRE ­select status­ VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 2 PLANNING JONATHAN SPENCE  JSPENCE@VAILGOV.COM Approved VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE Requested Groups 0 Groups Selected Remove all Add all Chief of Planning Chief of Building Fire Marshal Wildland Fire