HomeMy WebLinkAboutBegin_Workflow-10-02-2014_15-25-52.pdfClick Here to Save Eform as PDF...
Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip
Review Coordinator Carolyn Godfrey ( cgodfrey@vailgov.com )
Review Cycle 2
Workflow/Activity Name Begin_Workflow / DepartmentReview
Activity InstructionsUpon acceptance of task, please review the required drawings and provide any applicable
comments and status.
Current User Logon Martin Haeberle ( mhaeberle@vailgov.com)
CHANGEMARKS Review Cycle:1
Filter Changemarks by Keyword: SEARCH SHOW ALL
Click Here to Load Changemarks...
Click Here to Publish Changemarks to PDF...
Sorting:
Resolved Status File Cycle Department File Markup Description Details Applicant Response
Yes | No No 1 Building A0.2.pdf mhaeberl B001 Providie location and which ul listing being used
Yes | No No 1 Building A0.2.pdf mhaeberl B002
Change of use. Clarify technical infeasibility for not
complying with the accessiblity requrienments with
a R2 occupancy
Yes | No No 1 Building E1.0.pdf mhaeberle B001 what is the proposed wiring method
Yes | No No 1 Building E1.0.pdf mhaeberle B002 Required to be installed per the State Electrical
Code as well as the Town of vil
Yes | No No 1 Building E1.0.pdf mhaeberle B003 Show compliance with IECC 2012 edition
Yes | No No 1 Building E1.1.pdf mhaeberle B001 Please identify
Yes | No No 1 Building M1.01.pdf mhaeberle B001 indicate to be painted matching exterior
Yes | No No 1 Building M1.01.pdf mhaeberle B002 Penetrating fire rated assemblies? Please clarify
Yes | No No 1 Building M1.01.pdf mhaeberle B001 Is existing hot water system adequate for the loads
proposed. Please clarify
Complete Review Request Additional Group Save & Close
Building Process V1
Yes | No No 1 Building P1.01.pdf mhaeberle B001 How is fire pentrations of fire assemblies to be
protected? Detail on plans
Yes | No No 1 Planning A0.2.pdf p.001 Changemarks
note #01
Need exhibit showing GRFA calcs for
determiniation of inclusionary zoning fee in lieu.
Show My Changemarks
DEPARTMENT REVIEW Review Cycle:2
CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES
2 BUILDING
MARTIN HAEBERLE
MHAEBERLE@VAILGOV.COM
InReview
VIEW CHECKLIST
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
2 FIRE select status
VIEW CHECKLIST
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
2 PLANNING
JONATHAN SPENCE
JSPENCE@VAILGOV.COM
Approved
VIEW CHECKLIST
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
Requested Groups
0 Groups Selected Remove all Add all
Chief of Planning
Chief of Building
Fire Marshal
Wildland Fire