Loading...
HomeMy WebLinkAboutB14-0344 B14-0345 Special Inspection Geotech Report.pdf Flepworth-Pawlak Georechnital, IncGeSt" ech . 5010 County Read 154 Glenwood 5prinp,Colorado 81601 Phone.974-945-7988 HEPWORTH-PAWLAK GEOTECHNICAL Far.970.945.8454 email:hpgeo@hpgeorech.corn September 8, 2015 Meribel Corporation do OAC Management Attn: Erik Peterson P.O. Box 2399 Edwards, Colorado 81632 (erikpeterson @oacminc.com) Job No. 114 043B Subject: Compliance of Construction and Materials, Proposed Pietrimi Residence, Units A and B, 182 West Meadow Drive, Lot 5, Vail Village 2"d Filing, Vail, Colorado Dear Mr. Peterson: Hepworth-Pawlak Geotechnical, Inc. provided construction observation and materials testing services for foundation soil bearing conditions and structural backfill, reinforcing steel, concrete and structural steel during construction of the referenced project. Our field observation and testing services for the project began on December 22, 2014 and continued on an as-requested basis through July 23, 2015. Our services for the project are essentially complete at this time. Our services were performed under the direction of the undersigned licensed Engineer registered in the State of Colorado. Any nonconforming conditions, materials and/or workmanship identified during construction were immediately brought to the attention of the contractor for correction. Our testing and observation reports have been distributed under separate cover. Based on inferences drawn from our observations during construction and the results of our testing as documented by the referenced field and laboratory reports, it is our professional opinion that the referenced foundation soil bearing conditions, reinforcing steel, concrete, structural backfill and structural steel for the project have achieved the Parker 303-841-7119 • Colorado Springs 719-633-5562 • Silverthome 970-468-1989 Meribel Corporation September 8, 2015 Page 2 specified conditions, and/or currently accepted industry practices as applicable. Please recognize that construction observation and testing are sampling functions that involve direct observation and testing of very limited amount of the overall work to evaluate the construction compliance. If you have any questions, please contact the undersigned. Sincerely, HEPWORTH - PAWLAK GEOTECHNICAL, INC. Thomas J. Westhoff, CET Reviewed by: Steven L. Pawlak, P.E. TJW/ksw Attachment: Town of Vail Final Report of Special Inspections Distribution: Pierce Architects— Bill Pierce (bill@vailarchitects.com) GE Johnson Construction—Andy Sandoval (sandovala@gejohn.son.com) GE Johnson Construction—Eddy Cotton (cottone@'tejohnson.com) JVA Consulting Engineers—Craig Kobe (ckobe@jvajva.com) Martin/Martin Consulting Engineers -Justin Yarnell (jyarnell@martinmartin-mtn.com) Project No. 114 043B i' + WNOF VMII FINAL REPORT OF SPECIAL INSPECTIONS Project / !e. fY/sem Permit Number: Project Location: /S We s t/71 .- a t _.. rein flu` - Owner Address City: Zip: Design Professional In Charge:1./ L y wAct.k El_ Address: Z? L7 G¢r..tfrz * l2oY City:lam/ n�tiar , L5/10eVdtej, State: C d Zip:E31 0I Phone:(7 Tb) f 95- 71.,98 FaxF d -`� . Fvr bisn a-7�.ox 5�: / S ti.rxii E-mail: t /4 B_ €,•-• .-x.1B.c,cAte,// . � o <4Z.Ttr�.7l�� 4i+ol S71--A-ge.‹.f4Put- To the best of my information, knowledge, and belief, the special inspections and/or testing required for this project, have been completed in accordance with the contract documents. Interim reports submitted prior to this Final Report of Special Inspections form a basis for,and are to be considered an integral part of this final report. Any discrepancies that were noted in all interim reports have been corrected. cC f{� (moo�-�G �� � .c ( S,o)4=.1 6 cr g a,ot$- 6 A.A.1 .4 b-e,r- //10/43B, r Prepared by: /;<r 5 r=,{ Gt .p� f ( • 7 i� Lam/" [ . } r ' y1 } Type or Print Name i it: 1522.2 + t Signature ,'1 if'`•°yy,`.'.ON R1 'Q- : OF CMYG Date - •Preparers Seal and Signature Required