Loading...
HomeMy WebLinkAboutBegin_Workflow-09-22-2014_14-37-55.pdfClick Here to Save Eform as PDF... Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip Review Coordinator Shelley Bellm  ( sbellm@vailgov.com ) Review Cycle 1 Workflow/Activity Name Begin_Workflow / ReviewQA  Activity InstructionsIf corrections are needed from an assigned reviewer, please route by selecting the  appropriate department. Current User Logon Shelley Bellm ( sbellm@vailgov.com)  CHANGEMARKS ­ Review Cycle:1 Filter Changemarks by Keyword:  SEARCH    SHOW ALL Click Here to Load Changemarks... Click Here to Publish Changemarks to PDF... Sorting: Resolved Status File Cycle Department File Markup Description Details Applicant Response Yes | No No 1 Building A0­00 ­ COVER.pdf jmondragon building 002 please provide a complete Res Check for code compliance Yes | No No 1 Building A1­04 ­ BASEMENT FLOOR PLAN.pdf jmondragon building 003 provide egress from this area considered for sleep[ing purposes (closet) Yes | No No 1 Building A3­02 ­ BUILDING SECTIONS.pdf jmondragon building 004 provide egress code compliance provide window well plan Yes | No No 1 Building A3­03 ­ WALL SECTIONS.pdf jmondragon building 006 provide ladder detail Yes | No No 1 Building A6­02 ­ WINDOW SCHEDULE.pdf jmondragon building 007 provide u values and res check Yes | No No 1 Building S5 ­ FOUNDATION SECTIONS.pdf jmondragon building 008 provide radon details (barrier) and piping layout Yes | No No 1 Building A0­00 ­ COVER.pdf JR building 009 blower door test required comments are typical for both sides Yes | No No 1 Public Works A0­05 ­ TOPOGRAPHICAL SURVEY.pdf tkassmel PW001 Need to submit a stamped survey from a licensed surveyor. Yes | No No 1 Public Works C2 ­ GRADING & EROSION CONTROL PLAN.pdf tkassmel PW001 Remove improvements from Town of Vail Property/Streamtract No Reviewer Corrections Required  Corrections Required ­ Return to Applicant  Assign Reviewer Correction   Building Process V1 Yes | No No 1 Public Works C2 ­ GRADING & EROSION CONTROL PLAN.pdf tkassmel PW002 Concrete Pan is not required. There is already a 2' pan on north side of paver walk. Yes | No No 1 Public Works C2 ­ GRADING & EROSION CONTROL PLAN.pdf tkassmel PW003 Proposed swales should not discharge onto neighbors property. Show grading. Yes | No No 1 Public Works C5.1 ­ FOUNDATION DRAIN PLAN.pdf tkassmel PW001 Remove improvements from Town of Vail Property/Streamtract Yes | No No 1 Public Works K__1428 ­ Eagle Valley Survey 182 WMD.pdf tkassmel PW001 Flooplain Lines cannot be scaled. They need to be placed based on the adopted FEMA floodplain profiles. Please place the floodplain on the survey correctly. Yes | No No 1 Public Works K__1428 ­ Eagle Valley Survey 182 WMD.pdf tkassmel PW002 We need a signed and stamped survey. Show My Changemarks QA CORRECTIONS QA CORRECTIONS QA CORRECTIONS Please provide exterior material specifications. QA CORRECTIONS DEPARTMENT REVIEW ­ Review Cycle:1   CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES 1 BUILDING FLORENCIO MONDRAGON  JMONDRAGON@VAILGOV.COM CORRECTIONS REQUIRED 1 FIRE MIKE VAUGHAN  MVAUGHAN@VAILGOV.COM APPROVED 1 PLANNING JONATHAN SPENCE  JSPENCE@VAILGOV.COM CORRECTIONS REQUIRED 1 PUBLIC WORKS TOM KASSMEL  TKASSMEL@VAILGOV.COM CORRECTIONS REQUIRED