HomeMy WebLinkAboutM320 UPPER HVAC.pdfNOTES:
SCALE:
SECOND FLOOR MECHANICAL PLAN
3/16" = 1'-0"
A
200
24x6
A
200
24x6
ARA
24x
6
ARA24x
6
A
600
48x6
A RA
48x6
A
RA
48x6
A
600
48x6
A
300
24x6
A
RA 24x6
A
250
24x6
A
250
24x6
A
RA
24x6
A
RA
24x6
A
150
12x6
A
600
36x8
A
RA
36x8
A
300
24x6
A
RA
24x6
1. RE: M4 SERIES FOR MECHANICAL DIAGRAMS.
2. COORDINATE ROUTING OF CONDENSATE DRAIN LINES
WITH ARCHITECT PRIOR TO INSTALLATION.
3. CEILING COORDINATION OF ALL MEP SYSTEMS
(LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL,
FIRE PROTECTION, ETC.) MUST BE COMPLETED BY
THE CONTRACTOR PRIOR TO THE START OF ANY
INSTALLATIONS.
4. AVOID ROUTING DUCTWORK OVER ELECTRICAL
ROOMS OR ELECTRICAL PANELS; MAINTAIN N.E.C.
CLEARANCES. COORDINATE ROUTINGS WITH DIV. 16
CONTRACTOR.
5. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO
ALL MOTORIZED EQUIPMENT.
6. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
7. ALL SOURCES OF IGNITION ON MECHANICAL
EQUIPMENT SHALL BE MOUNTED 18" AFF.
8. T-STATS SHALL BE LOCATED NEAR THE LIGHT SWITCH
WITHIN THE ROOM SHOWN. COORDINATE WITH
ARCHITECT & ELECTRICAL ENGINEER TO MATCH
HEIGHT AND LOCATION.
9. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS
POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST
SPACE WHEN POSSIBLE, ESPECIALLY WHERE
CROSSING OTHER DUCTS, PIPES, AND ELECTRICAL.
10. ACCESS PANELS SHALL BE SIZED TO ALLOW
REMOVAL OF LARGEST APPLIANCE, U.N.O. LOCATIONS
SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL
BE COORDINATED WITH THE ARCHITECTS DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
11. FIREPLACE FLUE ROUTING, SIZING, TYPE, ETC. BY
OTHERS.
12. PROVIDE GRAVITY DAMPERS ON ALL OSA INTAKES
AND EXH AT EXTERIOR PENETRATION THAT CLOSE
WHEN VENTILATION SYSTEM IS NOT OPERATING.
20x12
7"ø EXH UP THRU ROOF.
TERMINATE VIA
GOOSENECK.
12"ø
9"ø
12"ø
20x12
18x10
18x10
6"ø
7"ø
14x10
14x10
8"ø
8"ø
7"ø 7"ø
8"ø
8"ø
8"ø EXH UP THRU ROOF.
TERMINATE VIA
GOOSENECK.
4"ø DRYER EXH UP THRU ROOF.
TERMINATE VIA GOOSENECK.
12"ø
24x12
9"ø 9"ø
7"ø EXH UP THRU ROOF.
TERMINATE VIA
GOOSENECK.
16x10
16x10
6"ø
8"ø
8"ø
7"ø
8"ø
8"ø EXH UP THRU ROOF.
TERMINATE VIA
GOOSENECK.
7"ø
10"ø EXH UP THRU ROOF.
TERMINATE VIA
GOOSENECK.
7"ø
6"ø
9"ø
9"ø
A
300
24x6
A
300
24x6
4"ø DRYER EXH UP THRU ROOF.
TERMINATE VIA GOOSENECK.
4" BOILER FLUE AND COMBUSTION AIR
THRU ROOF. LOCATE ON WARM SIDE OF
INSULATION. TERMINATE VIA
MANUFACTURER'S CONCENTRIC VENT
KIT; MAINTAIN CLEARANCES TO
COMBUSTIBLES, OPENINGS, AND OTHER
INTAKE I.A.W. MANUFACTURER'S
REQUIREMENTS.
ZONE DAMPERS.
ZONE DAMPERS.
10"ø EXH UP THRU ROOF.
TERMINATE VIA
GOOSENECK.
A
RA
12x6
A
150
12x6
7"ø
7"ø
7"ø
10"ø
E
OSA
12x12
E
OSA
12x12
BDD
7"ø
7"ø
7"ø
ZONE DAMPERS.
BY-PASS DAMPER.
BDD
24x12
A
RA
36x8
9"ø
9"ø
12"ø
7"ø OSA
C:\Users\eng-bpl\local settings\temp\AcPublish_7796\951100M320.dwg Printed By: eng-bpl July 27, 2015 - 7:23am LC-XXX
COPYRIGHT 2014
B
ANZE
G
EAUDIN
(970) 949-6108
(303) 278-3820
(970) 221-5691
(505) 323-9070
(307) 739-3944
Vail:
Denver:
Fort Collins:
Albuquerque:
Jackson:
www.bgce.com
MERIBEL CORP. RESIDENCE
Project Number - 1428
1650 Fallridge Road, Suite C-1
Vail, Colorado 81657
f.(970) 476-4901 p.(970)476-6342
182 WEST MEADOW DRIVE
VAIL, CO 81657
11/10/14
90% CD SET
09/05/14
PERMIT SET
7/30/14
DESIGN REVIEW
01/06/15
CD SET
05/06/15
ASI-004
4
06/25/15
MECH UPDATE
M3.20
2ND FLOOR
MECHANICAL
PLAN
08/10/15