Loading...
HomeMy WebLinkAboutME230 - FOUNDATION PIPING PLAN.pdfBELOW GRADE NOTES: SCALE: FOUNDATION MEP PLAN 3/16" = 1'-0" WW W W W 4" 4" 4"W UP. 1-1/2"W UP. 4" 2"W UP. 3"W UP. 3" 3" 3"W UP. 2"W UP. 4"W UP. 1-1/2"W UP. 4" 4" 3"W UP. 4"W UP. 2"W UP. 4"W UP. 1-1/2"W UP. 1-1/2"W UP. 3"W UP. 2"W UP. 3"W UP. 1. REFER TO THE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES. 2. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELD INSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER. 2"V UP. 2"V UP. 2"V UP AT MECHANICAL ROOM WALL OR ANTICIPATED INTERIOR WALL LOCATION; TYP. ALL VENTS UP. 2"V UP. 2"V UP. 2"V UP. 1" CONDUIT FOR POWER UP. 1" CONDUIT FOR POWER UP. 1-1/2" CONDUIT FOR LOW-VOLTAGE UP. 1-1/2" CONDUIT FOR LOW-VOLTAGE UP. 1-1/2" CONDUIT FOR LOW-VOLTAGE UP. 1" CONDUIT FOR POWER UP. 1-1/2"W UP. 1" CONDUIT FOR POWER UP. FLUSH, ROUND, NON-METALIC CONCRETE FLOOR BOX, TYP. FLUSH, ROUND, NON-METALIC CONCRETE FLOOR BOX, TYP. 1-1/2" CONDUIT FOR LOW-VOLTAGE UP. 3"W UP. S:\BGProjects\9511.00 182 West Meadow Drive Duplex\Cad\BGCE CAD\951100ME230.dwg Printed By: cadd-drp February 06, 2015 - 11:34am LC-XXX COPYRIGHT 2014 B ANZE G EAUDIN (970) 949-6108 (303) 278-3820 (970) 221-5691 (505) 323-9070 (307) 739-3944 Vail: Denver: Fort Collins: Albuquerque: Jackson: www.bgce.com MERIBEL CORP. RESIDENCE Project Number - 1428 1650 Fallridge Road, Suite C-1 Vail, Colorado 81657 f.(970) 476-4901 p.(970)476-6342 182 WEST MEADOW DRIVE VAIL, CO 81657 11/10/14 90% CD SET 09/05/14 PERMIT SET 7/30/14 DESIGN REVIEW 01/06/15 CD SET ME2.30 FOUNDATION PIPING PLAN 04/15/15