HomeMy WebLinkAboutME230 - FOUNDATION PIPING PLAN.pdfBELOW GRADE NOTES:
SCALE:
FOUNDATION MEP PLAN
3/16" = 1'-0" WW
W
W
W 4"
4"
4"W UP.
1-1/2"W UP.
4" 2"W UP.
3"W UP.
3"
3"
3"W UP.
2"W UP.
4"W UP.
1-1/2"W UP.
4"
4"
3"W UP.
4"W UP.
2"W UP.
4"W UP.
1-1/2"W UP.
1-1/2"W UP.
3"W UP.
2"W UP.
3"W UP.
1. REFER TO THE PLUMBING FIXTURE CONNECTION
SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES.
2. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY
SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON
WASTE PIPING AS REQUIRED BY CODE AND FOR
REASONABLE MAINTENANCE BASED ON ACTUAL
FIELD INSTALLATION. COORDINATE LOCATIONS WITH
ARCHITECT/ENGINEER.
2"V UP.
2"V UP.
2"V UP AT MECHANICAL ROOM WALL
OR ANTICIPATED INTERIOR WALL
LOCATION; TYP. ALL VENTS UP.
2"V UP.
2"V UP.
2"V UP.
1" CONDUIT FOR POWER UP.
1" CONDUIT FOR
POWER UP.
1-1/2" CONDUIT FOR
LOW-VOLTAGE UP.
1-1/2" CONDUIT FOR
LOW-VOLTAGE UP.
1-1/2" CONDUIT FOR
LOW-VOLTAGE UP.
1" CONDUIT FOR POWER UP.
1-1/2"W UP.
1" CONDUIT FOR POWER UP.
FLUSH, ROUND, NON-METALIC
CONCRETE FLOOR BOX, TYP.
FLUSH, ROUND, NON-METALIC
CONCRETE FLOOR BOX, TYP.
1-1/2" CONDUIT FOR
LOW-VOLTAGE UP.
3"W UP.
S:\BGProjects\9511.00 182 West Meadow Drive Duplex\Cad\BGCE CAD\951100ME230.dwg Printed By: cadd-drp February 06, 2015 - 11:34am LC-XXX
COPYRIGHT 2014
B
ANZE
G
EAUDIN
(970) 949-6108
(303) 278-3820
(970) 221-5691
(505) 323-9070
(307) 739-3944
Vail:
Denver:
Fort Collins:
Albuquerque:
Jackson:
www.bgce.com
MERIBEL CORP. RESIDENCE
Project Number - 1428
1650 Fallridge Road, Suite C-1
Vail, Colorado 81657
f.(970) 476-4901 p.(970)476-6342
182 WEST MEADOW DRIVE
VAIL, CO 81657
11/10/14
90% CD SET
09/05/14
PERMIT SET
7/30/14
DESIGN REVIEW
01/06/15
CD SET
ME2.30
FOUNDATION
PIPING PLAN
04/15/15