Loading...
HomeMy WebLinkAboutXBS-1.pdfTEL: 303-791-9911 FAX: 303-791-0967 9512 TITAN PARK CIRCLELITTLETON, COLORADO 80125 JOB NO. : 5511 SHT. 1 OF 4 XBS-1 NOT VALID WITHOUT DATE & ORIGINAL SIGNATURE NOTE: BEFORE CONSTRUCTION COMMENCES, A UTILITY LOCATE MUST BE PERFORMED TO FIELD VERIFY THE LOCATION OF ALL UTILITIES IN THE VICINITY OF THE SITE. THE EARTH RETENTION DESIGN WILL BE REVIEWED AND DRAWINGS REVISED, IF REQUIRED, WHEN FINAL UTILITY LOCATIONS BECOMES AVAILABLE. DWG. NO. DWN BY: JVW ISSUED: 09-16-2014 FOR GE JOHNSON CONSTRUCTION 40800 US HWY 6, UNIT #8 VAIL, CO 81657 PH: 970-845-0272 PROPOSED TEMPORARY EARTH RETENTION PIETRINI RESIDENCE 182 WEST MEADOW DRIVE VAIL, COLORADO 81657 9512 TITAN PARK CIRCLE LITTLETON, COLORADO 80125 TEL: 303-791-9911 FAX: 303-791-0967 SHEET NO. INDEX OF SHEETS XBS - 1 COVER SHEET XBS - 2 PLAN VIEW XBS - 3 ELEVATION VIEWS XBS - 4 ELEVATION VIEW & DETAILS DIMENSIONS OBTAINED FROM PERMIT SET, PROVIDED BY GE JOHNSON CONSTRUCTION DATED 08-06-2014: x PIERCE ARCHITECTS (ARCH.) x JVA (STRUCTURAL) DATE NO. REVISIONS DESCRIPTION PIETRINI RESIDENCE GE JOHNSON CONSTRUCTION 40800 US HWY 6, UNIT #8 VAIL, CO 81657 PH: 970-845-0272 1. DURING CONSTRUCTION OF THE EARTH RETENTION WALL, COGGINS & SONS, INC. WILL MONITOR THE WALL HORIZONTALLY USING SURVEY INSTRUMENTS. 2. THE CONSTRUCTION MONITORING SHALL BE CONDUCTED ONCE A WEEK WHILE THE EARTH RETENTION IS UNDER CONSTRUCTION. 3. AFTER COGGINS COMPLETION, THE GENERAL CONTRACTOR SHALL MONITOR THE WALL AT LEAST ONCE PER WEEK. THE WEEKLY MONITORING SHALL BE CONTINUED UNTIL THE PERMANENT CONCRETE FOUNDATION WALL IS COMPLETED AND BACKFILLED. 4. IF ANY SUDDEN MOVEMENT OCCURS DURING THE CONSTRUCTION OF EARTH RETENTION, WORK SHALL BE SUSPENDED IMMEDIATELY AND COGGINS & SONS ENGINEERING STAFF SHALL BE IMMEDIATELY NOTIFIED. 5. IF ANY SUDDEN MOVEMENT IS OBSERVED AFTER EARTH RETENTION COMPLETION AND BEFORE FOUNDATION BACKFILL, WORK SHALL BE IMMEDIATELY SUSPENDED AND COGGINS & SONS SHALL BE IMMEDIATELY NOTIFIED. 6. LOGS OF ALL MONITORING SHALL BE PROVIDED TO COGGINS & SONS WEEKLY AS PERFORMED. CONSTRUCTION MONITORING SOIL NAIL GENERAL NOTES 1. DESIGN BASIS: A. 2009 INTERNATIONAL BUILDING CODE. B. TEMPORARY SHORING IS DESIGNED TO ACCOMMODATE NORMAL CONSTRUCTION SURCHARGE OF MATERIAL AND LIGHT TRUCKS, NOT HEAVY POINT LOADS SUCH AS: CRANES (TRUCK OR OUTRIGGER), EXCAVATORS, CONCRETE PUMP TRUCKS, OR LARGE STOCKPILES. C. REFERENCE CODES: x AISC STEEL MANUAL, NINTH EDITION x ACI 318-99 "BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE" x PUBLICATION NO. FHWA-SA-96-069 "MANUAL FOR DESIGN AND CONSTRUCTION MONITORING OF SOIL NAIL WALLS" x PUBLICATION NO. FHWA-IF-03-017 "SOIL NAIL WALLS" GEOTECHNICAL ENGINEERING CIRCULAR NO. 7. 2. FOUNDATION: A. A GEOTECHNICAL ENGINEERING REPORT WAS NOT PROVIDED FOR THIS PROJECT. COGGINS & SONS, INC. BASED THE GEOTECHNICAL ENGINEERING PARAMETERS ON EXPERIENCE GAINED WITH OTHER PROJECTS IN THE IMMEDIATE VICINITY OF THE PROPOSED STRUCTURE. 3. MATERIALS: A. SHOTCRETE: ALL SHOTCRETE SHALL BE READY MIX PLANT PRODUCED CONCRETE YIELDING A 3 DAY COMPRESSIVE STRENGTH OF 2000 PSI AND 28 DAY COMPRESSIVE STRENGTH OF 4000 PSI. SUBMIT DESIGN MIX TO COGGINS & SONS ENGINEERING STAFF FOR REVIEW. ONE SHOTCRETE PANEL SHALL BE PRODUCED AT THE BEGINNING OF WALL CONSTRUCTION. AFTER INITIAL TESTS, FREQUENCY OF TESTING TO BE REVIEWED. THE SHOTCRETE PANEL SHALL BE MINIMUM 18 X 18 X 5.75 INCH AND IDENTIFIED TO A WALL LOCATION. TEST PANELS SHALL NOT BE DISTURBED FOR THE FIRST 48 HOURS AFTER SHOOTING AND DURING THIS PERIOD BE FIELD CURED UNDER CONDITIONS SIMILAR TO WALL CONSTRUCTION. AFTER FIRST 48 HOURS, TESTING AGENCY SHALL OBTAIN PANEL FROM FIELD AND RETURN PANEL TO LABORATORY TO CURE UNDER ROOM TEMPERATURE. CORE PANEL AND OBTAIN SAMPLES FOR TESTING AT 3, 7, AND 28 DAY FOLLOWING ACI 506 GUIDELINES. CORES SHALL BE AT LEAST 3 INCHES IN DIAMETER. CORING AND CAPPING OF SAMPLES SHOULD OCCUR SAME DAY OF TESTING. APPLY CORRECTION FACTORS GIVEN IN ASTM C42 TO OBTAIN COMPRESSIVE STRENGTH AND REPORT RESULTS TO COGGINS ENGINEERING STAFF IMMEDIATELY. A PRE-CONSTRUCTION MEETING SHALL BE HELD TO REVIEW AND COORDINATE TESTING PROCEDURES. B. BARS: BARS TO BE GRADE 75 REINFORCING BARS OF THE SIZES SHOWN ON THE SOIL NAIL SCHEDULE. REINFORCING STEEL SHALL MEET ASTM A-615 SPECIFICATIONS. BARS SHALL BE FURNISHED WITH BEARING PLATES PER THE SOIL NAIL SCHEDULE. C. WELDED WIRE FABRIC SHALL MEET ASTM A185 SPECIFICATIONS. D. REINFORCING STEEL SHALL BE ASTM A615 GRADE 60. E. GROUT: PRESSURE INJECTED GROUT SHALL BE PORTLAND CEMENT TYPE I AND WATER MIX, WITH A WATER TO CEMENT RATIO NOT EXCEEDING 0.45. THE MINIMUM 28 DAY COMPRESSIVE STRENGTH OF THE GROUT SHALL BE 4000 PSI. GROUT MAY CONTAIN SIKA CO. INTERPLAST-N SHRINKAGE COMPENSATING CEMENT IN THE MAXIMUM AMOUNT OF 1% BY WEIGHT OF CEMENT. DURING PRODUCTION, GROUT SHALL BE TESTED FOR COMPRESSIVE STRENGTH IN ACCORDANCE WITH ASTM C109 (USE BRASS MOLDS) AT A FREQUENCY OF THREE SETS OF THREE GROUT CUBES FROM EACH GROUT PLANT AT THE BEGINNING OF OPERATION (ONE SET = THREE GROUT CUBES). AFTER INITIAL TESTS, FREQUENCY OF TESTING TO BE REVIEWED. THE COMPRESSIVE STRENGTH SHALL BE THE AVERAGE OF THE 3 CUBES TESTED PER ONE SET. GROUT SAMPLES SHALL BE TAKEN DIRECTLY FROM THE GROUT PLANT. PROVIDE GROUT CUBE COMPRESSIVE STRENGTH RESULTS TO THE COGGINS ENGINEER WITHIN 24 HOURS OF TESTING. BREAKS OCCUR AT 3, 7, AND 28 DAYS. F. DRAINAGE BOARD SHALL BE OF COMPOSITE CONSTRUCTION CONSISTING OF A CUSPATED, SINGLE SIDED, PLASTIC DRAINAGE CORE AND A GEOTEXTILE FILTER FABRIC BONDED TO THE CUSPATED SIDE OF THE DRAINAGE CORE. MINIMUM RATED FLOW RATE SHALL BE 15 GPM/FT. OF WIDTH WITH A HYDRAULIC GRADIENT OF 1.0. MINIMUM COMPRESSIVE STRENGTH SHALL BE 1500 PSF. ACCEPTABLE PRODUCTS ARE MIRADRAIN 6000 OR GREENSTREAK SHEET DRAIN. 4. SOIL NAILS: A. INSTALLATION PROCEDURES: x EXCAVATE LEVEL BENCH AT TOP OF WALL ELEVATION. x INSTALL GROUT COLUMNS. x EXCAVATE DOWN TO LEVEL OF FIRST ROW OF SOIL NAILS. x DRILL AND INSTALL SOIL NAILS. FOR CASES WHERE THE EXCAVATED FACE CANNOT STAND, A CONTINUOUS BERM WILL BE EMPLOYED TO STABILIZE THE FACE. THE SOIL NAILS ARE INSTALLED AND GROUTED THROUGH THE STABILIZING BERM. SUBSEQUENTLY, THE BERM IS EXCAVATED AND SHOTCRETE IS APPLIED ALONG THE ENTIRE EXCAVATION LEVEL. ALTERNATIVELY, THE STABILIZING BERM CAN BE REMOVED IN SEQUENCE IN WHICH ALTERNATING EXCAVATION SLOTS ARE EXCAVATED AND PANELS ARE CREATED IN BETWEEN THE NAILS. THE WIDTH OF THE EXCAVATION SLOTS SHALL NOT EXCEED APPROXIMATELY THE SOIL NAILS HORIZONTAL SPACING. NEXT, SOIL NAILS ARE INSTALLED AND GROUTED AND SHOTCRETE IS APPLIED ON THE FACE OF THE EXCAVATION SLOTS. SUBSEQUENTLY, THE STABILIZING BERM PANELS ARE REMOVED AND THE INTERMEDIATE SOIL NAILS ARE INSTALLED AND SHOTCRETE IS APPLIED. x APPLY WELDED WIRE FABRIC, FACING REINFORCEMENT, AND SHOTCRETE TO THE EXCAVATION FACE. x WET SET SOIL NAIL BEARING PLATE AND NUT. SOIL NAIL GROUT MUST HAVE A MINIMUM OF THREE DAYS CURE BEFORE STARTING THE NEXT EXCAVATION CUT. x REPEAT ABOVE PROCESS TO BOTTOM OF EXCAVATION. 5. SOIL NAIL TESTING: A. VERIFICATION TESTING x EACH VERIFICATION TEST NAIL SHALL BE SACRIFICIAL AND INSTALLATION PROCEDURE SHALL BE SIMILAR TO THAT OF PRODUCTION NAILS. VERIFICATION TEST NAILS ARE INDICATED IN THE ELEVATION VIEW AND SHALL NOT BE TESTED FOR 3 DAYS AFTER INSTALLATION. IF SOIL CONDITIONS CHANGE, ADDITIONAL TEST NAILS WILL BE ADDED. USE THE FOLLOWING LOAD SEQUENCE. EACH LOAD SEQUENCE SHALL BE HELD FOR A PERIOD OF 10 MINUTES. VERIFICATION TEST LOADING SEQUENCE INCREMENT LOAD 1 AL 2 0.25 P 3 0.50 P 4 0.75 P 5 1.00 P 6 1.25 P 7 1.50 P 8 1.75 P 9 2.00 P AL = ALIGNMENT LOAD P = DESIGN LOAD VT # = DENOTES VERIFICATION TEST CONTACT COGGINS ENGINEERING STAFF TO OBTAIN TEST FORM. PROVIDE COGGINS ENGINEERING STAFF RESULTS IMMEDIATELY AFTER VERIFICATION TEST (PREFERABLY SAME DAY). 09-26-2014 REVISED PLAN VIEW TO SHOW PROJECTED SOIL NAIL LENGTHS, SHORTENED SOIL NAILS 7-8, 44-45, AND 51-54. 1 10-01-2014 REVISED PLAN VIEW TO INCLUDE A RAMP INTO THE EXCAVATION. REVISED LAYOUT BETWEEN SOIL NAILS 60 AND 74. 2 03/04/15