Loading...
HomeMy WebLinkAboutBegin_Workflow-10-02-2014_10-22-48.pdfClick Here to Save Eform as PDF... Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip Review Coordinator Shelley Bellm  ( sbellm@vailgov.com ) Review Cycle 1 Workflow/Activity Name Begin_Workflow / ReviewQA  Activity InstructionsIf corrections are needed from an assigned reviewer, please route by selecting the  appropriate department. Current User Logon Shelley Bellm ( sbellm@vailgov.com)  CHANGEMARKS ­ Review Cycle:1 Filter Changemarks by Keyword:  SEARCH    SHOW ALL Click Here to Load Changemarks... Click Here to Publish Changemarks to PDF... Sorting: Resolved Status File Cycle Department File Markup Description Details Applicant Response Yes | No No 1 Building C­010 GENERAL NOTES.pdf mhaeberle B001 per meeting with design team plans to be resubmitted with a narrowing of scope or obaining site approvals as per agreements with the town Yes | No No 1 Public Works C­310 SITE SECTION.pdf tkassmel PW001 Please provide shoring design Yes | No No 1 Public Works C­120 DETAILED GRADING PLAN.pdf tkassmel PW001 Town Council did not approve the relocation of the existing path. Therefore this project will have to reconstruct the path back to existing condition in roughly the same location at the same grades. This will require a change in design for the stairs, patio, storm sewer, and upper path connection. Please show redesign and relocated path on plans. Show My Changemarks QA CORRECTIONS QA CORRECTIONS Changes to future plans may require additional review. QA CORRECTIONS DEPARTMENT REVIEW ­ Review Cycle:1   CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES 1 BUILDING MARTIN HAEBERLE  MHAEBERLE@VAILGOV.COM CORRECTIONS REQUIRED 1 PLANNING JONATHAN SPENCE  JSPENCE@VAILGOV.COM APPROVED No Reviewer Corrections Required  Corrections Required ­ Return to Applicant  Assign Reviewer Correction   Building Process V1 See comments 1 PUBLIC WORKS TOM KASSMEL  TKASSMEL@VAILGOV.COM CORRECTIONS REQUIRED