Loading...
HomeMy WebLinkAboutA1.pdfR R R Unit #7 44.7% Unit #6 35.5% Unit #8 19.8% A1 Drawn By- WMK Date- 9-8-14 R1- 9-23-14 R2- 9-30-14 Tyrolean Inn- 3rd FloorCommon Hallway Stairwell #1 Stairwell #2 Floor Plan Scale 1/4" = 1' SCOPE OF WORK/ NOTES- 1-Existing flooring in hallway is to be removed (tile and carpet) and to be replace by stone/ tile flooring silver quartzite in a random pattern. New stone flooring is to extend to the end of the stairwell landings. Special attention is to be paid at stairwell to maintain proper riser heights. No other work to existing stairs included. 2- Once existing floor finishes are removed the existing subfloor will be inspected to determine extent or repairs/ replacement of subfloor. 3- Arched openings are to be removed from unit entries and replaced with flat drywall ceilings. Side lights at existing doors are to be eliminated as well. 4- Entry doors to the 3 units will be replaced with new 20 minute fire rated doors with new door frames 5- Stairwell doors are to replaced with new 1 hour fire rated doors. Existing stairwell door frames are to remain. Door replacement only 6- No work inside units included except for trim and patching around doors 7- No work to existing elevator included 8- Drywall throughout hallway to be textured to match and will be repainted 9- Verify carbon monoxide detector installed 10- Asbestos testing required 11- Verify all Elec/ Mech meets current code 12- Occupancy Type- R2 13- Construction Type- III-A 14- Building is fully sprinklered Hallway Elevator ELECTRICAL NOTES- 1-Existing light fixtures are to be replaced with new high efficency lighting. New lighting will replace exisitng lighting cucuit with more efficeint lighting so the total load will drop. See plan for layout. 2- Any ceiling/ floor penetrations will be 1 hour rated as needed 3- Verify all Elec/ Mech meets current code 4- At least 75% of new lighting to be high efficiency 10/13/14