Loading...
HomeMy WebLinkAboutBegin_Workflow-09-22-2014_16-57-33.pdfClick Here to Save Eform as PDF... Complete Review  Request Additional Group  Save & Close   Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip Review Coordinator Carolyn Godfrey  ( cgodfrey@vailgov.com ) Review Cycle 1 Workflow/Activity Name Begin_Workflow / DepartmentReview  Activity InstructionsUpon acceptance of task, please review the required drawings and provide any applicable  comments and status. Current User Logon Martin Haeberle ( mhaeberle@vailgov.com)  CHANGEMARKS ­ Review Cycle:1 Filter Changemarks by Keyword:  SEARCH    SHOW ALL Click Here to Load Changemarks... Click Here to Publish Changemarks to PDF... Sorting: Resolved Status File Cycle Department File Markup Description Details Applicant Response Yes | No No 1 Building B14­ 0356 plan.pdf mhaeberle B002 Provide electrical load calculations. If over the panel size engineered one line to include fault current calculation required Yes | No No 1 Building B14­ 0356 plan.pdf mhaeberle B001 Provide engineered design for additional load on drainage system and how vent is to be achieved through fire rated assemblies Show My Changemarks DEPARTMENT REVIEW ­ Review Cycle:1   CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES 1 BUILDING MARTIN HAEBERLE  MHAEBERLE@VAILGOV.COM Corrections Required VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 1 PLANNING WARREN CAMPBELL  WCAMPBELL@VAILGOV.COM Approved VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE Requested Groups 0 Groups Selected Remove all Add all Chief of Planning Chief of Building Fire Fire Marshal Building Process V1