Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A105.pdf
I H 7 2 A C 4 D 3 G 6 B E 8 9 10 II 12 B.1 F.1 2 A300 4 A300 1 A300 F.2 2 A301 F EXIST. FLAT CEILING DROP FLAT CEILING 8' - 6" DROP FLAT CEILING DROP FLAT CEILING 74' - 10" 24' - 7 5/8" 2' - 5 1/4" 9' - 8 1/2" 8' - 5 1/2" 1' - 9 1/2" 12' - 8" 9' - 5 7/8" 5' - 7 3/4" 4' - 1 1/8" 5' - 4 3/4" 1' - 6 3/4" 8 1/8" FLAT CEILING B.O.S. 1 99' - 4 1/2" FLAT CEILING FLAT CEILING B.O.S. FLAT CEILING 3 1/2"2' - 0" 3' - 2 3/8" 16' - 7 1/8" 3' - 2 3/8" 7' - 10 1/2" 7' - 4 1/2" 15' - 7 1/4" 21' - 9" 21' - 6" EXIST. FLAT CEILING FLAT CEILING 9'-0"A.F.F SPRING POINT 9'-0"A.F.F SPRING POINT 10x16 2 A401 3 A402 10x16 10x16 10x16 10x16 6x8 6x8 6x8 6x8 6" / 1'-0" 6" / 1'-0" 6" / 1'-0" 6" / 1'-0" LL FLAT CEILING B.O.S. 8' - 6" 8' - 6" Project number Date Drawn by 11/26/2014 2:59:04 PM A105 FIRST LEVEL RCP PLAN 421 BEAVER DAM CIRCLE SCHWARTZREICH REMODEL 11.25.2014 Author 1/4" = 1'-0" FIRST LEVEL PLAN 1 No. Description Date 1 Revision 1 11.07.2014 CEILING PLAN GENERAL NOTES: 1. CEILING DATUM HEIGHTS ARE: FINISH FLOOR TO BOTTOM OF CEILING FINISH 2. CEILING HEIGHTS NOT LABELED ARE EXISTING OR ARE FASTENED TO BOTTOM OF STRUCTURE. 3. ALL INTERIOR BEAMS/COLUMNS ARE BOX CONSTRUCTION U.N.O. 4. REFER TO ELECTRICAL DRAWINGS FOR LIGHTING LAYOUT. LIGHTING TO BE COORDINATED WITH TIMBERS AND BEAMS TO CENTER WITHIN BAYS WHERE POSSIBLE, U.N.O. 5. STRUCTURAL DRAWINGS TAKE PRECEDENCE OVER ARCHITECTURAL UNLESS THE ARCHITECTURAL DWGS. CALLOUT LARGER SIZES. 6. CONSULT WITH ARCHITECT PRIOR TO FRAMING ANY DROPPED CEILINGS. 7. COORDINATE WITH ARCHITECTURAL/STRUCTURAL DWGS. FOR ADEQUATE BLOCKING IN WALLS AND CEILINGS FOR ANY NON- STRUCTURAL BEAM WORK. 03/20/15