Loading...
HomeMy WebLinkAboutA107.pdfAX201 1 AX202 2 I H 7 2 A C 4 D 3 G 6 B E 8 9 --AX202 1 A203 1 A202 1 10 II 12 B.1 F.1 A201 1 4 A300 1 A300 1 A301 A201 2 F.2 2 A301 3 A300 F 1 74' - 10" 24' - 7 5/8" 2' - 5 1/4" 9' - 8 1/2" 8' - 5 1/2" 1' - 9 1/2" 12' - 8" 9' - 5 7/8" 5' - 7 3/4" 99' - 4 1/2" 3 1/2" 2' - 0" 3' - 2 3/8" 16' - 7 1/8" 3' - 2 3/8" 7' - 10 1/2" 7' - 4 1/2" 15' - 7 1/4" 21' - 9" 21' - 6" 7'-0 5/8" A.F.F. SPRING POINT 7'-0 5/8" A.F.F. SPRING POINT EXISTING CEILING 2 A401 6" / 1'-0" 6" / 1'-0" 6" / 1'-0" 6" / 1'-0" 6" / 1'-0" 6" / 1'-0" LL ASI 1 SK2 1 Project number Date Drawn by 11/26/2014 3:00:15 PM A107 THIRD LEVEL RCP PLAN 421 BEAVER DAM CIRCLE SCHWARTZREICH REMODEL 11.25.2014 Author 1/4" = 1'-0" THIRD LEVEL PLAN 1 No. Description Date CEILING PLAN GENERAL NOTES: 1. CEILING DATUM HEIGHTS ARE: FINISH FLOOR TO BOTTOM OF CEILING FINISH 2. CEILING HEIGHTS NOT LABELED ARE EXISTING OR ARE FASTENED TO BOTTOM OF STRUCTURE. 3. ALL INTERIOR BEAMS/COLUMNS ARE BOX CONSTRUCTION U.N.O. 4. REFER TO ELECTRICAL DRAWINGS FOR LIGHTING LAYOUT. LIGHTING TO BE COORDINATED WITH TIMBERS AND BEAMS TO CENTER WITHIN BAYS WHERE POSSIBLE, U.N.O. 5. STRUCTURAL DRAWINGS TAKE PRECEDENCE OVER ARCHITECTURAL UNLESS THE ARCHITECTURAL DWGS. CALLOUT LARGER SIZES. 6. CONSULT WITH ARCHITECT PRIOR TO FRAMING ANY DROPPED CEILINGS. 7. COORDINATE WITH ARCHITECTURAL/STRUCTURAL DWGS. FOR ADEQUATE BLOCKING IN WALLS AND CEILINGS FOR ANY NON- STRUCTURAL BEAM WORK. 03/20/15