HomeMy WebLinkAboutA107.pdfAX201
1
AX202
2
I
H
7 2
A
C
4
D
3
G
6
B
E
8 9
--AX202 1
A203
1
A202
1 10 II 12
B.1
F.1
A201
1
4
A300
1
A300
1
A301
A201
2
F.2
2
A301
3
A300
F
1
74' - 10"
24' - 7 5/8" 2' - 5 1/4" 9' - 8 1/2" 8' - 5 1/2" 1' - 9 1/2" 12' - 8" 9' - 5 7/8" 5' - 7 3/4"
99' - 4 1/2"
3 1/2" 2' - 0" 3' - 2 3/8" 16' - 7 1/8" 3' - 2 3/8" 7' - 10 1/2" 7' - 4 1/2" 15' - 7 1/4" 21' - 9" 21' - 6"
7'-0 5/8" A.F.F.
SPRING POINT
7'-0 5/8" A.F.F.
SPRING POINT
EXISTING
CEILING 2
A401
6" / 1'-0"
6" / 1'-0" 6" / 1'-0"
6" / 1'-0"
6" / 1'-0"
6" / 1'-0"
LL
ASI 1
SK2
1
Project number
Date
Drawn by
11/26/2014 3:00:15 PM
A107
THIRD LEVEL RCP PLAN
421 BEAVER DAM CIRCLE
SCHWARTZREICH
REMODEL
11.25.2014
Author
1/4" = 1'-0"
THIRD LEVEL PLAN
1
No. Description Date
CEILING PLAN GENERAL NOTES:
1. CEILING DATUM HEIGHTS ARE:
FINISH FLOOR TO BOTTOM OF CEILING FINISH
2. CEILING HEIGHTS NOT LABELED ARE EXISTING OR ARE FASTENED
TO BOTTOM OF STRUCTURE.
3. ALL INTERIOR BEAMS/COLUMNS ARE BOX CONSTRUCTION U.N.O.
4. REFER TO ELECTRICAL DRAWINGS FOR LIGHTING LAYOUT.
LIGHTING TO BE COORDINATED WITH TIMBERS AND BEAMS TO
CENTER WITHIN BAYS WHERE POSSIBLE, U.N.O.
5. STRUCTURAL DRAWINGS TAKE PRECEDENCE OVER
ARCHITECTURAL UNLESS THE ARCHITECTURAL DWGS. CALLOUT
LARGER SIZES.
6. CONSULT WITH ARCHITECT PRIOR TO FRAMING ANY DROPPED
CEILINGS.
7. COORDINATE WITH ARCHITECTURAL/STRUCTURAL DWGS. FOR
ADEQUATE BLOCKING IN WALLS AND CEILINGS FOR ANY NON-
STRUCTURAL BEAM WORK.
03/20/15