Loading...
HomeMy WebLinkAboutA400.pdfR 10 F.2 STAIR 110 W6 1 A401 6R@7 5/8"=3'- 9 1/2" 5T@10"=4'-2" 10R@7 1/2"=6'-2 5/8" 9T@10"=7'-6" 2 A401 UP UP T O FIN. FLR. 8163' - 6 7/8" T.O. FIN. FLR. 8167' - 4 3/8" 10 F.2 1 A401 2 A401 DN DN UP 216A W13 UP STORAGE UNDERNEATH STAIR 215 8173' - 7" 4' - 5 3/8" 8180' - 7 11/32" 6R @ 7 5/8"= 3'-9 3/4" 5T @ 10"=4'-2" 3' - 9 1/8" 6R @ 6 3/8"= 3'-2 3/8" 5T @ 10"=4'-2" GUARDRAIL GUARDRAIL GUARDRAIL 6" 3' - 7 5/8" T.O. FIN. FLR. T.O. FIN. FLR. F.2 1 A401 2 A401 UP STAIR 310 311A 8180' - 7 11/32" 8183' - 0" GUARDRAIL GUARDRAIL 4R@7 1/8"=1'-10 5/8" 3T@10"=2'-6" 2' - 10" 6' - 1 1/8" T.O. FIN. FLR. T.O. FIN. FLR. II 3 A402 DN 18R@ 6 3/4"=10'-1 1/4" 17T@ 10"=14'-2" 3' - 2" GUARDRAIL FIREPLACE GUARDRAIL STONE TREAD 8173' - 7" II B.1 3' - 4 3/8" W11 DN 6R@ 6 3/8"=3'-2 3/8" 5T@ 10 3/4"=4'-5 3/4" 3' - 3 1/4" 8173' - 7" 8176' - 9 19/32" 2' - 1 1/2" 4' - 5 3/4" FIREPLACE 4 A402 10 F.1 5 A402 PLANTER PLANTER SLOPED STONE WALL 3'-6" ABOVE STAIR HEATED STONE ENTRY UP SL OP E SLOPE 8170' - 6" 10 T @ 1'-3" = 16'-6" 11 R @ 7" = 6.4' LANDING LANDING LL 8164'-1" Project number Date Drawn by 11/26/2014 3:03:37 PM A400 ENLARGED STAIR PLANS 421 BEAVER DAM CIRCLE SCHWARTZREICH REMODEL 11.25.2014 DM No. Description Date 1 Revision 1 11.07.2014 1/2" = 1'-0" FIRST LEVEL STAIR PLAN 1 1/2" = 1'-0" SECOND LEVEL STAIR PLAN 2 1/2" = 1'-0" THIRD LEVEL STAIR PLAN 3 1/2" = 1'-0" STAIR PLAN - EXTERIOR LOWER 4 1/2" = 1'-0" STAIR PLAN - EXTERIOR MASTER 5 1/2" = 1'-0" EXTERIOR ENTRY STAIR 6 03/20/15