HomeMy WebLinkAbout114270B (01-10-15) week ending.pdf 5020 County Road 154 Gee)Leth Glenwood Springs,Colorado 81601 Phone:970-945-7988 Fax:970-945-8454 HEPWORTH-PAWLAK GEOTECHNICAL hpgeoAhpgeotech.com Earthwork Compaction Testing Report Client: R.A. Nelson & Associates Job No.: 114 270B Day: Thursday Attn.: Mike Cuthbertson Date: 1/8/15 P.O. Drawer 5400 Report No.: 13 Page: 1 of 1 Avon, Colorado 81620 Project: Betty Ford Alpine Garden Learning Center, West Betty Ford Way, Vail, Colorado Weather: Clear, calm, dry Temperature: 27° at 10:00 am Earthwork Contractor: Diamond A Equipment Used: trackhoe, vibratory double drum walk behind roller,jumping jack tamper, ground thaw machine, frost blankets Description of Earthwork Under footing backfill at the new building NE corner was tested. Our test result Tested: indicated acceptable compaction. Verbal Communication: Jose with Diamond A and Mike Kowalski with RA Nelson were informed of our test results. Placement and Compaction Procedure: Not observed by HP Geotech. Lift Thickness: Max. Rock Size: Moisture Conditioning: Compactor(s) Used: Number of Passes: Nuclear Gauge Moisture/Density Test Results Location Field Dry Field Field Min. Test Depth or Moisture Comp, Proctor No. Elev. Density Content Comp. Req. Lab No. backfill under footing area (pcf) (/o) (%) 1 Under building footing, 15' S of NE footing 133.4 8.7 100 98 114-14 building corner grade Proctor Sample Reference: Lab No. Method Description Max. Dry Opt. Dens. (%) Moist. (%) 114-14 ASTM D 698 silty clayey sand with gravel 133.2 7.7 THIS REPORT PRESENTS OPINIONS AS A RESULT OF OUR OBSERVATIONSOF FILL PLACEMENT,WE HAVE RELIED ON THE CONTRACTOR TO CONTINUE APPLYING THE RECOMMENDED COMPACTIVE EFFORT AND MOISTURE TO FILL DURING THE TIMES WHEN OUR OBSERVER IS NOT OBSERVING OPERATIONS. THE NUCLEAR DENSOMETER METHOD OF TESTING WAS USED IN SUBSTANTIAL ACCORDANCE WITH ASTM D 6938. Distribution: R.A.Nelson&Associates-Mike Cuthbertson(mcuthbertsont renelson.com) R.A. Nelson&Associates-Dennis Ward(dward at ranelson.com) R.A. Nelson&Associates-Mike Kowalski(mkowalskiQranelson.com) Town of Vail-Todd Oppenheimer(toppenheimeravailuov.com) Thomas J. Westhoff, CET David A. Young, P.E. Field Technician Reviewed By P 5020 County Road 154 Ceotech Glenwood Springs, CO 81601 Phone: 970-945-7988 Fax: 970-945-8454 HEPWORTH-PAWLAK GEOTECHNICAL hpgeohpgeotecn.com CONSTRUCTION ACTIVITY REPORT Client: R.A. Nelson & Associates Job No.: 114 270B Day: Friday Attn.: Mike Cuthbertson Date: 1/9/14 P.O. Drawer 5400 Report No.: 14 Page: 1 of 1 Avon, Colorado 81620 Project: Betty Ford Alpine Garden Learning Center, West Betty Ford Way, Vail, Colorado Weather: Clear, calm, dry Temperature: 38°F at 12:40 pm Contractor's Construction Activities: Footing excavation continued along the east side of the new building. Equipment in Use: Track hoe HP Geotech's Site Activities: As requested we visited the site and observed the excavated footing areas completed at the north, east and west sides of the new building. The footing areas completed were cut in three levels ranging from about 5 to 15 feet below the adjacent grades. The soils exposed at footing grade were natural sand with gravel to sandy gravel and compacted sandy gravel structural fill. Soils were moist and not frozen and completed areas had been compacted. We judged the completed footing areas to be suitable for building support. Verbal Communication: Dennis Ward with RA Nelson and Jose with Diamond A were informed of our observation. distribution: R.A. Nelson &Associates-Mike Cuthbertson (mcuthbertson(a�renelson.com) R.A. Nelson &Associates- Dennis Ward(dward@ranelson.com) R.A. Nelson &Associates-Mike Kowalski (mkowalski(a�ranelson.com) Town of Vail -Todd Oppenheimer(toppenheimer@vailgov.com) Thomas J. Westhoff, CET David A Young, P.E. Field Technician Reviewed By