November 04, 2014
Mr. Martin Haeberle
Chief Building Official
Town of Vail Building Department
75 South Frontage Road
Vail, Colorado 81657
Permit No: DEV13-0001 PRJ14-0043 DRB140346
RE: Betty Ford Alpine Gardens – Education Center
Dear Martin:
Enclosed are our notes and revised documents addressing the Building Department comments
noted on the Permit Set (dated 9/9/14), for the Betty Ford Alpine Gardens Education Center located
at Ford Park.
Where new sheets have been issued, all revisions have been clouded. Our responses to the Plan
Check Comments are as follow, noted by sheet number / description number:
Sheet A0.2 / B001
Plan items to be deferred submittals have been listed on this sheet.
Sheet A0.2 / B002
2011 State and National Electrical code has been added to this sheet.
Sheet A0.2 / B003
IECC Section C402.4.1.2.3 has been annotated on this sheet.
Sheet A1.3 / B001
Scupper sizing has been added to this sheet in compliance with section 1503.4 IBC. All
scuppers have a 4” min. height.
ZEHREN
AND ASSOCIATES
2
ARCHITECTURE PLANNING INTERIORS
P.O. Box 1976 Avon, CO 81620 (970) 949-0257 FAX (970) 949-1080 www.zehren.com
Sheet A1.4 / B001
Reference sheet ID2.3. Fixtures comply with A117.1 ANSI.
Sheet A1.4 / B002
Reference sheet ID2.3. Vertical grab bars comply with A117.1 ANSI.
Sheet A3.2 / B001
Reference detail 14/A5.3. We have revised this detail to comply with section 1405.10.1.3;
however, this section specifically states clearances for stud walls since this stone veneer is
attached to an exterior concrete wall, please confirm if the 2” minimum clearance from a
paved area is required.
Sheet A5.3 / B001
Reference Specification Section 044313.13: Anchored Stone Masonry Veneer which
indicates how stone veneer is attached to the building.
Sheet A5.3 / B002
Reference detail 14/A5.3 and Specification Section 044313.13: Miscellaneous Masonry
Accessories which indicates how drainage is provided at the stone veneer.
Sheet A5.4 / B001
Per the Coloradoenergy.org R-Value table, Logs and Lumber have a 1.33 per inch R-
Value.
At wood glu-lams where spray foam is applied between members there’s a total of 10.25”
of wood + an additional 1.75” of spray foam. 10.25” x 1.33 = 13.6 R-Value + 1.75” foam
x (6.1 per inch) = 24.3 R-Value total.
At wood glu-lams where LVL is between members there is a total of 10.25” of wood +
1.75” of LVL = 12” x 1.33 = 15.96 R-Value total.
We believe this meets the intent of the 2012 IECC per Table C402.2.
Sheet A5.4 / B002
Reference detail 1/A5.4. We extended the spray foam further to meet the continuous
insulation standards.
ZEHREN
AND ASSOCIATES
3
ARCHITECTURE PLANNING INTERIORS
P.O. Box 1976 Avon, CO 81620 (970) 949-0257 FAX (970) 949-1080 www.zehren.com
Sheet A5.4 / B003
Per section 1503.4.1 Scuppers shall be provided where the roof perimeter construction
extends above the roof in such a manner that water will be entrapped if the primary drains
allow buildup for any reason. The slope of the roof only allows for minimal water build-up
which per section 1503.4.2 is allowable provided it’s accounted for in the structural design
of the roof, which it is. The roof design only allows for a maximum of 4” water build-up
before water would overflow onto primary flat roof which is sized for the additional water
load.
Sheet A5.7 / B001
Reference sheet A5.7; U-Value requirements have been given just above the Window
Schedule General Notes on the bottom right corner of the sheet.
Sheet S1.00 / B001
Reference Structural Plan Check comments.
Sheet S1.00 / B002
Reference Structural Plan Check comments.
Sheet T1 / B001
A stamped version of the topographic survey has been added to the documents.
140919 Specification Index – Issue H
We added a deferred submittal for accessible signage and occupant load signage onto sheet
A0.2.
BFAG – COMcheck envelope / B001
Reference MEP Plan Check comments.
Division 26 Electrical
Reference MEP Plan Check comments.
ZEHREN
AND ASSOCIATES
4
ARCHITECTURE PLANNING INTERIORS
P.O. Box 1976 Avon, CO 81620 (970) 949-0257 FAX (970) 949-1080 www.zehren.com
Sheet E3.0 / B001
Reference MEP Plan Check comments.
Sheet E3.0 / B002
Reference MEP Plan Check comments.
Sheet E3.0 / B003
Reference MEP Plan Check comments.
Sheet M1.0 / B001
Reference MEP Plan Check comments.
Sheet P2.0 / B001
Reference MEP Plan Check comments.
Sheet P2.0 / B002
Reference MEP Plan Check comments.
Sheet P2.0 / B003
Reference MEP Plan Check comments.
A0.0 / p001
Reference the BFAG Loan Commitment Letter.
A0.0 / p001
The Lease Boundary Map was approved by Vail Town Council on Nov. 4th, 2014.
A0.0 / p002
A DRB – Change to Approved Plans has been submitted to the TOV along with the
modified documents.
ZEHREN
AND ASSOCIATES
5
ARCHITECTURE PLANNING INTERIORS
P.O. Box 1976 Avon, CO 81620 (970) 949-0257 FAX (970) 949-1080 www.zehren.com
.
Please do not hesitate to contact me directly with any questions or concerns.
Sincerely,
David Kaselak, AIA
Project Architect