HomeMy WebLinkAboutBegin_Workflow - Review Comments - 10-23-2014_13-29-33.pdfBegin_Workflow Review Comments 10232014_132933
Review
Cycle Department Markup Snapshot
1 Building File: A0.2.pdf
ChangeMark: mhaeberle
Description: B001
Comment: Identify on plans items to be deferred submittal and when they are to be submitted. Reference section 107.3.4.1 IBC.
1 Building File: A0.2.pdf
ChangeMark: mhaeberle
Description: B002
Comment: Also obligated to comply with the state electrical code
1 Building File: A0.2.pdf
ChangeMark: mhaeberle
Description: B003
Comment: Annotate on pkans the required blower door test per section C402.4.1.2.3 IECC
1 Building File: A1.3.pdf
ChangeMark: mhaeberle
Description: B001
Comment: Show overflow and or scupper to include sizing
1 Building File: A1.4.pdf
ChangeMark: mhaeberle
Description: B001
Comment: Provide cross sectional details showing compliance with A117.1 ANSI
1 Building File: A1.4.pdf
ChangeMark: mhaeberle
Description: B002
Comment: Vertical grab bar? Please show on plans
1 Building File: A3.2.pdf
ChangeMark: mhaeberle
Description: B001
Comment: Clarfiy clearances to grade as required by the IBC
1 Building File: A5.3.pdf
ChangeMark: mhaeberle
Description: B001
Comment: How is veneer to be atached?
1 Building File: A5.3.pdf
ChangeMark: mhaeberle
Description: B002
Comment: Is drainage provided at base of veneer?
1 Building File: A5.4.pdf
ChangeMark: mhaeberle
Description: B001
Comment: Clarify code compliance for continuos insulation and R values as required by iECC
1 Building File: A5.4.pdf
ChangeMark: mhaeberle
Description: B002
Comment: Extend for continuos insulation
1 Building File: A5.4.pdf
ChangeMark: mhaeberle
Description: B003
Comment: Roof drainage sizing and overflow. Show compliance with section 1503.4 IBC
1 Building File: A5.7.pdf
ChangeMark: mhaeberle
Description: B001
Comment: include u values as identified with comcheck
1 Building File: C120.pdf
ChangeMark: mhaeberle
Description: B001
Comment: lower than upstream manhole Plumbing plans to show back water valve
1 Building File: S1.00.pdf
ChangeMark: mhaeberle
Description: B001
Comment: Please utlize current wind gust factor per 1609 IBC and ASCE 7
1 Building File: S1.00.pdf
ChangeMark: mhaeberle
Description: B002
Comment: Soil nailing to be reviewd and accepted by the engineer of record for the building
1 Building File: T1.pdf
ChangeMark: mhaeberle
Description: B001
Comment: Plan to be sealed by registrant per state law
1 Building File: 3. 140919 Specification Index Issue H.pdf
ChangeMark: mhaeberle
Description: B001
Comment: Provide accessible signage package anf occupant load signage to include locations
1 Building File: 4. BFAG COMcheck envelope.pdf
ChangeMark: mhaeberle
Description: B001
Comment: Revise to an assembly occupancy per plans
1 Building File: Division 26 Electrical.pdf
ChangeMark: mhaeberle
Description: B001
Comment: Clarify wiring methods to be used for the assembly occupancy per the NEC
1 Building File: E3.0.pdf
ChangeMark: mhaeberle
Description: B001
Comment: Clarify exit lighting illumination and batttery backup for assembly occupancies
1 Building File: E3.0.pdf
ChangeMark: mhaeberle
Description: B002
Comment: Provide lighting power calculation for interior and exterior lighting
1 Building File: E3.0.pdf
ChangeMark: mhaeberle
Description: B001
Comment: All exterior exit landings to have emergency power illumnation per 1006.3 IBC
1 Building File: M1.0.pdf
ChangeMark: mhaeberle
Description: B001
Comment: Provide the rest of the comcheck computer model
1 Building File: P2.0.pdf
ChangeMark: mhaeberle
Description: B001
Comment: Clar5fiy upstream manhole elevation. Appears a backwater valve shall be required. Revise plans Section 715 IPC
1 Building File: P2.0.pdf
ChangeMark: mhaeberle
Description: B002
Comment: Clarify food preperation area by showing compliance with section 1003 IPC. Note; include approval and provide documentation from the health
department of food preperation area uses. Revise plans to reflect code compliance
1 Building File: P2.0.pdf
ChangeMark: mhaeberle
Description: B003
Comment: Clarfiy floor drains allowed to be used in this area due to possible chemical drainage. Refernce section 803 IPC. Please provide written approval from
sewer purveyor
1 Planning File: A0.0.pdf
ChangeMark: p001
Description: Changemarks note #01
Comment: The applicant shall provide a performance bond (financial surety) with the Town of Vail as the beneficiary in the amount of 125% of the cost of the
completion of the project prior to the issuance of the permit. Total cost shall include all hard and soft costs incurred to ensure completion.
1 Planning File: A0.0.pdf
ChangeMark: p001
Description: Changemarks note #02
Comment: A proposed lease area boundary map depicting the land area to be leased to the applicant for the use and operation of an education center pursuant to
the Town???s approvals already granted shall be provided by the applicant for review and approval by the Town Council.
1 Planning File: A0.0.pdf
ChangeMark: p002
Description: Changemarks note #01
Comment: A DRB Changes to Approved Plans is required to be reviewed and approved prior to building permit issuance for any plan deviations from those
presented and approved by the PEC